Code CR7010 Series User manual

codecorp.com
DXXXXXX CR7010 User Manual 2
Copyright © 2021 Code Corporation. All rights reserved. iPhone® is a registered trademark of Apple Inc.
CODE READER 7010
Note from the Code Team
Thank you for purchasing the CR7010! Approved by infection control specialists, the CR7000 Series is fully enclosed and
built with CodeShield®plastics, known to withstand the harshest chemicals used in the industry. Made to protect and ex-
tend the battery life of the Apple iPhone®, the CR7010 cases will keep your investment safe and clinicians on the go. Easily
swappable batteries keep your case running as long as you are. Don’t wait for your device to charge again—unless that’s
how you prefer to use it, of course.
Made for enterprises, the CR7000 series product ecosystem provides a durable, protective case and exible charging
methods so you can focus on what matters.
We hope you enjoy your enterprise mobility experience. Have any feedback? We’d love to hear from you.
Your Code Product Team
product.str[email protected]

codecorp.com
DXXXXXX CR7010 User Manual 3
Copyright © 2021 Code Corporation. All rights reserved. iPhone® is a registered trademark of Apple Inc.
CODE READER 7010
Table of Contents
Note from the Code Team.................................................................................... 2
Table of Contents............................................................................................3
Cases and Accessories.......................................................................................4
ProductAssemblyandUse................................................................................... 5
Inserting/Removing Batteries.................................................................................6
UsingtheChargingStation....................................................................................6
BatteryChargeIndicator......................................................................................7
MaintenanceandTroubleshooting.............................................................................8
Warranty....................................................................................................8
LegalDisclaimer.............................................................................................8
StatementofAgencyCompliance..............................................................................9

codecorp.com
DXXXXXX CR7010 User Manual 4
Copyright © 2021 Code Corporation. All rights reserved. iPhone® is a registered trademark of Apple Inc.
CODE READER 7010
Cases
Part Number Description
CR7010-8SE Code Reader 7010 iPhone 8/SE Case, Light Gray
CR7010-XR11 Code Reader 7010 iPhone XR/11 Case, Light Gray
Accessories
Part Number Description
CRA-B710 Code Reader Accessory for CR7010 - Battery
CRA-A710 Code Reader Accessory for CR7010-8SE 1-Bay Charging Station, US Power Supply
CRA-A715 Code Reader Accessory for CR7010-XR11 1-Bay Charging Station, US Power Supply
CRA-A712 Code Reader Accessory for CR7010 10-Bay Battery Charging Station, US Power Supply
Cases and Accessories
The following tables summarize the parts included within the CR7010 product line. More product details can be found on
Code’s website.

codecorp.com
DXXXXXX CR7010 User Manual 5
Copyright © 2021 Code Corporation. All rights reserved. iPhone® is a registered trademark of Apple Inc.
CODE READER 7010
Inserting iPhone
The CR7010 case will arrive with case and case cover
connected.
1. Clean iPhone carefully before loading in the
CR7010 case.
2. Using both thumbs, slide the cover up. DO NOT
apply pressure on the cover without a phone in the
case.
3. Insert iPhone carefully as shown.
4. Press iPhone into case.
5. Align cover with side rails and slide cover down.
6. Snap to lock case securely.
Product Assembly and Use
Unpacking and Installation
Read the following information before assembling the CR7010 and its accessories.

codecorp.com
DXXXXXX CR7010 User Manual 6
Copyright © 2021 Code Corporation. All rights reserved. iPhone® is a registered trademark of Apple Inc.
CODE READER 7010
Inserting/Removing Batteries
Only Code’s CRA-B710 batteries are compatible with the CR7010 case. Insert the CRA-B710 battery into the cavity on the
back side of the case; it will click into place.
To verify the battery is properly connected, a lightning bolt will be located on the iPhone’s battery, signifying a charge status
and successful battery installation.
To remove the battery, use both thumbs and press both corners of the raised ridge on the battery to slide the battery out.
Using the Charging Station
The CR7010 charging stations are designed to charge the CRA-B710 batteries. Customers can purchase 1-bay or 10-bay
chargers.
Place the Charging Station on a at, dry surface away from liquids. Connect the power cable into the bottom of the charg-
ing station.

codecorp.com
DXXXXXX CR7010 User Manual 7
Copyright © 2021 Code Corporation. All rights reserved. iPhone® is a registered trademark of Apple Inc.
CODE READER 7010
Load Battery or Case as shown. It is recommended to fully charge each new battery before the rst use even though a
new battery may have residual power upon receiving.
The CRA-B710 batteries can only be inserted one direction. Ensure the metal contacts on the battery meet with the metal
contacts within the charger. When inserted correctly, the battery will lock into place.
LED charge indicators on the side of the charging stations show the charge status.
• Blinking red – battery is charging
• Green – battery is fully charged
• Colorless – no battery or case is present or, if a battery is inserted, a fault may have occurred. If a battery or case is
securely inserted into the charger, and the LEDs do not light up, try reinserting the battery or case or insert it into a dif-
ferent bay to verify if the issue resides with the battery or the charger bay.
Battery Charge Indicator
To view the charge level of the CR7010 case, press the button on the back of the case.
• Green – 66% - 100% charged
• Amber – 33% - 66% charged
• Red – 0% - 33% charged

codecorp.com
DXXXXXX CR7010 User Manual 8
Copyright © 2021 Code Corporation. All rights reserved. iPhone® is a registered trademark of Apple Inc.
CODE READER 7010
Battery Best Practices
To eciently use the CR7010 case and battery, the iPhone should be kept at or near full charge. The CRA-B710 battery
should be used for power draw and swapped when nearly depleted. The case is designed to keep the iPhone charged.
Placing a fully-charged battery into a case with a half or nearly dead iPhone makes the battery work overtime, creating
heat and draining power rapidly from the battery. If the iPhone is kept at a nearly full charge, the battery slowly delivers
current to the iPhone allowing the charge to last longer. The CRA-B710 battery will last approximately 6 hours under high-
power consumption workows.
Take note that the amount of power draw depends upon the applications being actively used or open in the background.
For maximum battery usage, exit unneeded applications and dim the screen to approximately 75%. For long-term storage
or shipping, remove the battery from the case.
Maintenance and Troubleshooting
Approved Disinfectants
Please review the approved disinfectants.
Routine Cleaning and Disinfection
The iPhone screen and screen protector should be kept clean to maintain device responsiveness. Thoroughly clean the
iPhone screen and both sides of the CR7010 case cover before installing the iPhone as they can get dirty.
Approved medical disinfectants can be used to clean the CR7010 case and charging bays.
• Ensure the screen shield is correctly snapped shut.
• Use disposable wipe cloth or apply cleaner to paper towel, then wipe.
• Do not submerge the case in any liquid or cleaner. Simply wipe it with the approved cleaners and allow it to air dry or
wipe dry with paper towel.
• For charging docks, remove all batteries before cleaning; do not spray cleaner into the charging wells.
Troubleshooting
If the case isn’t communicating to the phone, restart the phone, remove and reinsert the battery and/or remove the phone
from the case and reinsert it. If the battery indicator does not respond, the battery may be in shutdown mode due to low
power. Charge the case or battery for approximately 30 minutes; then check if the indicator is providing feedback.
Contact Code for Support
For product issues or questions, please contact Code’s support team at codecorp.com/code-support.
Warranty
The CR7010 comes with a 1-year standard warranty.
Legal Disclaimer
Copyright © 2021 Code Corporation. All Rights Reserved.
The software described in this manual may only be used in accordance with the terms of its license agreement.

codecorp.com
DXXXXXX CR7010 User Manual 9
Copyright © 2021 Code Corporation. All rights reserved. iPhone® is a registered trademark of Apple Inc.
CODE READER 7010
No part of this publication may be reproduced in any form or by any means without written permission from Code Cor-
poration. This includes electronic or mechanical means such as photocopying or recording in information storage and
retrieval systems.
NO WARRANTY. This technical documentation is provided AS-IS. Further, the documentation does not represent a com-
mitment on the part of Code Corporation. Code Corporation does not warrant that it is accurate, complete or error free.
Any use of the technical documentation is at the risk of the user. Code Corporation reserves the right to make changes in
specications and other information contained in this document without prior notice, and the reader should in all cases
consult Code Corporation to determine whether any such changes have been made. Code Corporation shall not be liable
for technical or editorial errors or omissions contained herein; nor for incidental or consequential damages resulting from
the furnishing, performance, or use of this material. Code Corporation does not assume any product liability arising out of
or in connection with the application or use of any product or application described herein.
NO LICENSE. No license is granted, either by implication, estoppel, or otherwise under any intellectual property rights of
Code Corporation. Any use of hardware, software and/or technology of Code Corporation is governed by its own agree-
ment. The following are trademarks or registered trademarks of Code Corporation: CodeXML®, Maker, QuickMaker,
CodeXML®Maker, CodeXML®Maker Pro, CodeXML®Router, CodeXML®Client SDK, CodeXML®Filter, HyperPage, Code-
Track, GoCard, GoWeb, ShortCode, GoCode®, Code Router, QuickConnect Codes, Rule Runner®, Cortex®, CortexRM, Cortex-
Mobile, Code, Code Reader, CortexAG, CortexStudio, CortexTools, Anity®, and CortexDecoder™.
All other product names mentioned in this manual may be trademarks of their respective companies and are hereby
acknowledged. The software and/or products of Code Corporation include inventions that are patented or that are the
subject of patents pending. Relevant patent information is available on our website. See which Code Barcode Scanning
Solutions hold U.S. patents (codecorp.com).
The Code Reader software is based in part on the work of the Independent JPEG Group.
Code Corporation, 434 West Ascension Way, Ste 300, Murray, Utah 84123
codecorp.com
Statement of Agency Compliance
NOTE: This equipment has been tested and found to comply with the limits for a Class B digital device, pursuant
to part 15 of the FCC Rules. These limits are designed to provide reasonable protection against harmful interfer-
ence in a residential installation. This equipment generates, uses and can radiate radio frequency energy and, if
not installed and used in accordance with the instructions, may cause harmful interference to radio communi-
cations. However, there is no guarantee that interference will not occur in a particular installation. If this equip-
ment does cause harmful interference to radio or television reception, which can be determined by turning the
equipment off and on, the user is encouraged to try to correct the interference by one or more of the following
measures:
• Reorient or relocate the receiving antenna.
• Increase the separation between the equipment and receiver.
• Connect the equipment into an outlet on a circuit different from that to which the receiver is connected.
• Consult the dealer or an experienced radio/TV technician for help.
Industry Canada (IC) This device complies with Industry Canada licence-exempt RSS standard(s). Operation is subject to
the following two conditions: (1) this device may not cause interference, and (2) this device must accept any interference,
including interference that may cause undesired operation of the device.

codecorp.com
DXXXXXX CR7010 User Manual 10
Copyright © 2021 Code Corporation. All rights reserved. iPhone® is a registered trademark of Apple Inc.
CODE READER 7010
Industrie Canada (IC) Le présent appareil est conforme aux CNR d’Industrie Canada applicables aux appareils radio
exempts de licence. L’exploitation est autorisée aux deux conditions suivantes : (1) l’appareil ne doit pas produire de brouil-
lage, et (2) l’utilisateur de l’appareil doit accepter tout brouillage radioélectrique subi, même si le brouillage est susceptible
d’en compromettre le fonctionnement.
Use of the Made for Apple
®
badge means that an accessory has been designed to connect specically to the Apple
product(s) identied in the badge and has been certied by the developer to meet Apple performance standards. Apple is
not responsible for the operation of this device or its compliance with safety and regulatory standards.
Please note that the use of this accessory with iPhone may affect wireless performance.
Table of contents
Other Code Barcode Reader manuals

Code
Code Code Reader CR3500 User manual

Code
Code CORTEXJPOS CR6000 User manual

Code
Code CR2700 User manual

Code
Code Code Reader 3600 User manual

Code
Code CR4405 User manual

Code
Code CR1000 User manual

Code
Code CORTEXJPOS CR2300 Quick setup guide

Code
Code CR900FD User manual

Code
Code Code Reader 2500 User manual

Code
Code CORTEXJPOS CR2600 User manual
































