
3Contents
Contents
1 Introduction 5
1.1 First things rst! 5
1.2 Information about the planning and installation instructions 5
2 For your safety 7
3 Product overview 10
3.1 Product designation 10
3.2 System overviews 11
3.3 System description 15
3.4 Spray circuit design 19
3.5 Options 20
4 Planning a Condair MN system 22
4.1 Note on the water supply to the Condair MN 22
4.2 Determining the number of humidier units 22
4.3 Conguring the central unit 22
4.4 Calculating cable and hose lengths 23
4.5 Information on positioning the central unit and water lter(s) 24
4.6 Information on positioning of the components of the optional reverse osmosis system
Condair RO-HB 25
4.7 Positioning the humidier units 30
4.8 Water supply requirements 31
4.8.1 Water supply requirements (without RO system) 31
4.8.2 Water supply requirements for the reverse osmosis system Condair RO-HB 31
4.9 Water outlet requirements 32
4.10 Power supply requirements 32
4.11 LAN connection requirements 33
4.12 Information on servicing the Condair MN 33
4.13 Delivery scope overview 34
5 Preparatory installations 35
5.1 Checking delivery / Storage and transport 35
5.1.1 Checking delivery 35
5.1.2 Storage and transport 35
5.2 Tools required for installation 36
5.3 Preparatory installations overview 37
5.4 Preparatory installations for ush-mounting humidier units in new buildings with concrete ceilings 39
5.4.1 Install installation boxes for ush-mounting in concrete ceilings 39
5.4.1.1 Flush-mounting installation boxes for concrete ceilings 39
5.4.2 Laying the guide pipes 40
5.4.3 Drilling installation openings in the installation boxes 43
5.5 Preparatory installations for ush-mounting humidier units in suspended ceilings 44
5.5.1 Drill installation openings in the suspended ceilings 44
5.5.2 Laying the guide pipes 44