
INSTALLATION
Remember to turn off the mains water supply before connecting to any
existing pipe work.
Warning! Please check for any hidden pipes and cables before drilling
holes in the wall.
!
Position the valve onto the wall and mark the position of the fixing lugs (x4). Make
sure the valve is set back from the front face of the wall by the appropriate depth
to allow for plasterboard, filling and tiling etc. (min. 78mm to max. 105mm see
dimension page).
Mount casting to the wall using suitable fixings.
Always leave access to the four front cartridges for servicing.
Once the valve has been secured to the wall, the black Plastic Dust Cover can be
temporally attached to the valve with the screws supplied. This will protect the valve
while the rest of the work is completed (see fig 1).
Remove Hot and Cold check valves, and flush out the installation, clean the filters
and refit.
Apply a narrow bead of clear silicone sealant around the back edge of the cover plate
and carefully press into position.
Fit the control knobs by lining up the flat surface of the valve cover with the grub
screw on the handle, tighten the screw with the supplied hexagonal key (see fig 2).
Do not use tapered threaded adaptors or excessive thickness of sealing
tape as this may damage the valve body and result in a
concealed leak within the wall cavity.
Blank off and seal the open outlet if it is not required.
Remove the Plastic Dust Cover.
Turn on supplies and test all connections for water tightness.
!