D-Link DIR615A1 User manual

2.4GHz 802.11n MPCI Module
User’s Guide

1
Regulatory notes and statements Wireless LAN,
Health and Authorization for use
Radio frequency electromagnetic energy is emitted from
Wireless LAN devices. The energy levels of these emissions
however are far much less than the electromagnetic energy
emissions from wireless devices like for example mobile phones.
Wireless LAN devices are safe for use frequency safety
standards and recommendations. The use of Wireless LAN
devices may be restricted in some situations or environments for
example:
zOn board of airplanes, or
zIn an explosive environment, or
zIn case the interference risk to other devices or services is
perceived or identified as harmful
In case the policy regarding the use of Wireless LAN devices
in specific organizations or environments (e.g. airports, hospitals,
chemical/oil/gas industrial plants, private buildings etc.) is not
clear, please ask for authorization to use these devices prior to
operating the equipment.
Regulatory Information/disclaimers
Installation and use of this Wireless LAN device must be in
strict accordance with the instructions included in the user
documentation provided with the product. Any changes or
modifications made to this device that are not expressly
approved by the manufacturer may void the user’s authority to
operate the equipment. The Manufacturer is not responsible for
any radio or television interference caused by unauthorized
modification of this device, of the substitution or attachment.
Manufacturer and its authorized resellers or distributors will
assume no liability for any damage or violation of government
regulations arising from failing to comply with these guidelines.

2
FCC Interference Statement
Federal Communication Commission Interference
Statement
This equipment has been tested and found to comply with the
limits for a Class B digital device, pursuant to Part 15 of the
FCC Rules. These limits are designed to provide reasonable
protection against harmful interference in a residential
installation. This equipment generates, uses and can radiate
radio frequency energy and, if not installed and used in
accordance with the instructions, may cause harmful
interference to radio communications. However, there is no
guarantee that interference will not occur in a particular
installation. If this equipment does cause harmful interference
to radio or television reception, which can be determined by
turning the equipment off and on, the user is encouraged to try
to correct the interference by one of the following measures:
-Reorient or relocate the receiving antenna.
-Increase the separation between the equipment and
receiver.
-Connect the equipment into an outlet on a circuit different
from that to which the receiver is connected.
-Consult the dealer or an experienced radio/TV technician
for help.
This device complies with Part 15 of the FCC Rules.
Operation is subject to the following two conditions: (1) This
device may not cause harmful interference, and
(2) this device must accept any interference received, including
interference that may cause undesired operation.
FCC Caution: Any changes or modifications not expressly
approved by the party responsible for compliance could void the
user's authority to operate this equipment.

3
IMPORTANT NOTE:
FCC Radiation Exposure Statement:
This equipment complies with FCC radiation exposure
limits set forth for an uncontrolled environment. This
equipment should be installed and operated with minimum
distance 20cm between the radiator & your body.
This transmitter must not be co-located or operating in
conjunction with any other antenna or transmitter. We
declare that the product is limited in CH1~CH11 by specified
firmware controlled in the USA.
CE Mark Warning
This is a Class B product. In a domestic environment, this
product may cause radio interference, in which case the user
may be required to take adequate measures.
Protection requirements for health and safety –
Article 3.1a
Testing for electric safety according to EN 60950 has been
conducted. These are considered relevant and sufficient.
Protection requirements for electromagnetic
compatibility – Article 3.1b
Testing for electromagnetic compatibility according to EN 301
489-1, EN 301 48917 and EN 55024 has been conducted. These
are considered relevant and sufficient.
Effective use of the radio spectrum – Article 3.2
Testing for radio test suites according to EN 300 328-2 has been
conducted. These are considered relevant and sufficient.

4
CE in which Countries where the product may be
used freely:
Germany, UK, Italy, Spain, Belgium, Netherlands, Portugal,
Greece, Ireland,Denmark, Luxembourg, Austria, Finland,
Sweden, Norway and Iceland.France: except the channel 10
through 13, law prohibits the use of other channels.

5
This device is intended only for OEM integrators under the following conditions:
1) The antenna must be installed such that 20 cm is maintained between the antenna and users,
and 2) The transmitter module may not be co-located with any other transmitter or
antenna. 3) For all products market in US, OEM has to limit the operation channels in CH1
to CH11 for 2.4G band by supplied firmware programming OEM shall not supply any tool or
info to the end-user regarding to Regulatory Domain change.
As long as 3conditions above are met, further transmitter test will
not be required. However, the OEM integrator is still responsible for testing their
end-product for any additional compliance requirements required with this module
installed (for example, digital device emissions, PC peripheral requirements, etc.).
IMPORTANT NOTE: In the event that these conditions can not be met (for example
certain laptop configurations or co-location with another transmitter), then the FCC
authorization is no longer considered valid and the FCC ID can not be used on the final
product. In these circumstances, the OEM integrator will be responsible for re-evaluating
the end product (including the transmitter) and obtaining a separate FCC authorization.
END PRODUCT LABELING
This transmitter module is authorized only for use in device where the antenna may be
installed such that 20 cm may be maintained between the antenna and users (for
example: Access point, Wireless Router..etc.). The final end product must be labeled in a
visible area with the following: “Contains TX FCC ID: KA2DIR615A1”.
MANUAL INFORMATION THAT MUST BE INCLUDED
The OEM integrator has to be aware not to provide information to the end user regarding how to
install or remove this RF module in the user's manual of the end product which integrates this module.
The end user manual shall include all required regulatory information/warning as show in this manual.
The users manual for OEM integrators must include the following information in a prominent
location “ IMPORTANT NOTE: To comply with FCC RF exposure compliance requirements,
the antenna used for this transmitter must be installed to provide a separation distance of at least
20 cm from all persons and must not be co-located or operating in conjunction with any other
antenna or transmitter. We declare that the product is limited in CH1~CH11 by specified
firmware controlled in the USA.

6
TABLE OF CONTENT
Introduction……………………………………1
Overview of this User’s Guide……………….1
Software Installation ………………………....2
Windows 98se/ME/2000/XP Utility and
Driver Installation……………………………2
Wireless Utility Setting……………………...4
Technical Specifications……………………14

7
INTRODUCTION
Congratulations on your purchase of this 2.4GHz 802.11n
MPCI Module. This manual helps to get familiar with the
2.4GHz 802.11n MPCI Module. This manual contains detailed
instructions in operation of this product. Please keep this manual
for future reference.
With a 2.4GHz 802.11n MPCI Module, a desktop or laptop
computer can communicate with another computer in a wireless
way. Easy-to-use utilities are bundled with 2.4GHz 802.11n
MPCI Module for configuration, monitoring, and diagnosis
purposes.
2.4GHz 802.11n MPCI Module can wirelessly transmit and
receive data, minimizing the need for wired connections, at a
speed of up to fifty-four megabit per second.
2.4GHz 802.11n MPCI Module provides users with an access
to real-time information anywhere in their organization. The
mobility provides productivity and service, which are not
available under wired networks. The 2.4GHz 802.11n MPCI
Module configuration is easy to change from peer-to-peer
networks, suitable for a small number of users, to full
infrastructure networks of thousands of users that allow roaming
around a broad area.
Overview of this User’s Guide
Introduction. Describes the 2.4GHz 802.11n MPCI Module
and its features.
Software Installation. Tells how to setup the driver and the
utility setting.
Technical Specifications.Lists the technical (general, physical
and environmental) specifications of the 2.4GHz 802.11n MPCI
Module.

8
SOFTWARE INSTALLATION
This section will lead you to install the driver and utility of the
2.4GHz 802.11n MPCI Module via Windows OS installation.
Windows 98se/ME/2000/XP Utility and Driver
Installation
1. Insert the 2.4GHz 802.11n MPCI Module Driver & Utility
CD-ROM into computer’s CD-ROM Drive and it will
automatically run a setup menu and install the driver and the
utility, for Win98se, please reboot the system to install the
driver to the system properly. In some specific setting on
Windows system, you may need to proceed the software
manually, go to your Windows Start menu and choose Run,
type “D:\Utility\Setup.exe” in the dialog box (D:\ will
depend on where your CD-ROM drive is located) and click
OK.
2. If you need to install the driver manually, refer each
Windows OS to the following CD-Rom directory path:
D:\Drivers\<Windows OS>\SIS163U.INF.
Note: (D:\ will depends on where the CD-ROM drive is
located and <Windows OS> will depend on the Windows
Operating System you are using).

9
3. The Install Shield Wizard screen will appear. Click “Next”
to continue.
4. The installation program will help you to setup the Wireless
Utility. Be noted that the Windows XP have its own
Wireless Utility; you can either use the utility of Windows
XP or the provided utility.
5. You will see the icon on the Windows task bar when you
finish the installation.
When the icon in the toolbar represents in green color, it is
properly connected to the network and if it represents in red
color, then it is not connected to the network.
Table of contents
Other D-Link Control Unit manuals
Popular Control Unit manuals by other brands

Festo
Festo Compact Performance CP-FB6-E Brief description

Elo TouchSystems
Elo TouchSystems DMS-SA19P-EXTME Quick installation guide

JS Automation
JS Automation MPC3034A user manual

JAUDT
JAUDT SW GII 6406 Series Translation of the original operating instructions

Spektrum
Spektrum Air Module System manual

BOC Edwards
BOC Edwards Q Series instruction manual

KHADAS
KHADAS BT Magic quick start

Etherma
Etherma eNEXHO-IL Assembly and operating instructions

PMFoundations
PMFoundations Attenuverter Assembly guide

GEA
GEA VARIVENT Operating instruction

Walther Systemtechnik
Walther Systemtechnik VMS-05 Assembly instructions

Altronix
Altronix LINQ8PD Installation and programming manual








