
Table of contents
Installer reference guide
3
ERLA11~16DAV3+W1 + EBSH/X(B)11+16P30+50DF
Daikin Altherma 3 R ECH₂O
4P663482-1B – 2022.07
7.1.1 Installation site requirements of the outdoor unit........................................................................................ 68
7.1.2 Additional installation site requirements of the outdoor unit in cold climates............................................ 70
7.1.3 Installation site requirements of the indoor unit .......................................................................................... 71
7.1.4 Special requirements for R32 units................................................................................................................ 72
7.1.5 Installation patterns ....................................................................................................................................... 74
7.2 Opening and closing the units ........................................................................................................................................ 83
7.2.1 About opening the units................................................................................................................................. 83
7.2.2 To open the outdoor unit............................................................................................................................... 83
7.2.3 To close the outdoor unit............................................................................................................................... 84
7.2.4 To open the indoor unit ................................................................................................................................. 84
7.2.5 To lower the switch box of the indoor unit and remove the top cover........................................................ 85
7.2.6 To close the indoor unit ................................................................................................................................. 87
7.3 Mounting the outdoor unit............................................................................................................................................. 87
7.3.1 About mounting the outdoor unit ................................................................................................................. 87
7.3.2 Precautions when mounting the outdoor unit.............................................................................................. 87
7.3.3 To provide the installation structure ............................................................................................................. 87
7.3.4 To install the outdoor unit ............................................................................................................................. 88
7.3.5 To provide drainage........................................................................................................................................ 89
7.3.6 To install the discharge grille.......................................................................................................................... 90
7.3.7 To prevent the outdoor unit from falling over .............................................................................................. 91
7.4 Mounting the indoor unit ............................................................................................................................................... 91
7.4.1 About mounting the indoor unit.................................................................................................................... 91
7.4.2 Precautions when mounting the indoor unit................................................................................................. 91
7.4.3 To install the indoor unit ................................................................................................................................ 91
7.4.4 To connect the drain hose to the drain ......................................................................................................... 92
8 Piping installation 94
8.1 Preparing refrigerant piping ........................................................................................................................................... 94
8.1.1 Refrigerant piping requirements.................................................................................................................... 94
8.1.2 Refrigerant piping insulation.......................................................................................................................... 95
8.2 Connecting the refrigerant piping .................................................................................................................................. 95
8.2.1 About connecting the refrigerant piping ....................................................................................................... 95
8.2.2 Precautions when connecting the refrigerant piping.................................................................................... 96
8.2.3 Guidelines when connecting the refrigerant piping...................................................................................... 97
8.2.4 Pipe bending guidelines ................................................................................................................................. 97
8.2.5 To flare the pipe end ...................................................................................................................................... 97
8.2.6 To braze the pipe end..................................................................................................................................... 98
8.2.7 Using the stop valve and service port............................................................................................................ 99
8.2.8 To connect the refrigerant piping to the outdoor unit ................................................................................. 100
8.2.9 To connect the refrigerant piping to the indoor unit .................................................................................... 103
8.3 Checking the refrigerant piping...................................................................................................................................... 103
8.3.1 About checking the refrigerant piping........................................................................................................... 103
8.3.2 Precautions when checking the refrigerant piping........................................................................................ 104
8.3.3 Checking refrigerant piping: Setup ................................................................................................................ 104
8.3.4 To check for leaks ........................................................................................................................................... 104
8.3.5 To perform vacuum drying............................................................................................................................. 105
8.4 Charging refrigerant........................................................................................................................................................ 106
8.4.1 About charging refrigerant............................................................................................................................. 106
8.4.2 Precautions when charging refrigerant ......................................................................................................... 107
8.4.3 Charging additional refrigerant...................................................................................................................... 108
8.4.4 Completely recharging refrigerant................................................................................................................. 108
8.4.5 To fix the fluorinated greenhouse gases label............................................................................................... 109
8.5 Preparing water piping ................................................................................................................................................... 110
8.5.1 Water circuit requirements............................................................................................................................ 110
8.5.2 To check the water volume and flow rate ..................................................................................................... 113
8.6 Connecting water piping................................................................................................................................................. 114
8.6.1 About connecting the water piping ............................................................................................................... 114
8.6.2 Precautions when connecting the water piping............................................................................................ 115
8.6.3 To connect the water piping .......................................................................................................................... 115
8.6.4 To connect a pressure vessel ......................................................................................................................... 118
8.6.5 To fill the heating system ............................................................................................................................... 118
8.6.6 To fill the heat exchanger inside the storage tank ........................................................................................ 120
8.6.7 To fill the storage tank.................................................................................................................................... 120
8.6.8 To insulate the water piping .......................................................................................................................... 121
9 Electrical installation 123
9.1 About connecting the electrical wiring .......................................................................................................................... 123
9.1.1 Precautions when connecting the electrical wiring....................................................................................... 123
9.1.2 Guidelines when connecting the electrical wiring......................................................................................... 124
9.1.3 About electrical compliance........................................................................................................................... 125