D-EIMAC00608-16_01EN - 2/27
CONTENTS
1INTRODUCTION................................................................................................................................................ 7
1.1 Precautions against residual risks.......................................................................................................................... 7
1.2 Description.............................................................................................................................................................. 8
2RECEIVING THE UNIT...................................................................................................................................... 8
3OPERATING LIMITS......................................................................................................................................... 8
3.1 Storing Storage....................................................................................................................................................... 8
3.2 Operation ................................................................................................................................................................8
3.3 Operation with Option 187......................................................................................................................................9
4FREECOOLING UNIT VERSION.................................................................................................................... 10
4.1 Operation with Option 187....................................................................................................................................12
5MECHANICAL INSTALLATION ..................................................................................................................... 12
5.1 Safety.................................................................................................................................................................... 12
5.2 Noise..................................................................................................................................................................... 12
5.3 Moving and lifting..................................................................................................................................................13
5.4 Positioning and assembly..................................................................................................................................... 13
5.5 Minimum space requirements............................................................................................................................... 14
5.6 Multiple chiller installed side by side in a free field with dominant wind. .............................................................. 15
5.7 Multiple chiller installed side by side in a compound............................................................................................ 15
5.8 Sound protection................................................................................................................................................... 16
5.9 Water piping.......................................................................................................................................................... 16
5.10 Water treatment ............................................................................................................................................... 17
5.11 Evaporator and recovery exchangers anti-freeze protection...........................................................................18
5.12 Installing the flow switch................................................................................................................................... 18
5.13 Heat recovery...................................................................................................................................................18
6ELECTRICAL INSTALLATION....................................................................................................................... 19
6.1 General specifications .......................................................................................................................................... 19
6.2 Electrical supply.................................................................................................................................................... 19
6.3 Electric connections..............................................................................................................................................19
6.4 Cable requirements .............................................................................................................................................. 20
6.5 Phase unbalance..................................................................................................................................................20
7OPERATION.................................................................................................................................................... 21
7.1 Operator’s responsibilities ....................................................................................................................................21
8MAINTENANCE............................................................................................................................................... 21
8.1 Routine maintenance............................................................................................................................................21
8.2 Unit Maintenance and Cleaning............................................................................................................................ 24
8.3 Inverter Electrolytic Capacitors.............................................................................................................................24
9SERVICE AND LIMITED WARRANTY........................................................................................................... 24
10 IMPORTANT INFORMATION REGARDING THE REFRIGERANT USED.................................................... 25
10.1 Factory and Field charged units instructions ...................................................................................................25
11 PERIODIC CHECKS AND COMMISSIONING OF PRESSURE EQUIPMENT.............................................. 26
12 DISPOSAL....................................................................................................................................................... 26
LIST OF FIGURES
Figure 1 - Typical refrigerant circuit.............................................................................................................................. 3
Figure 2 - Typical refrigerant circuit with heat recovery................................................................................................4
Figure 3 - Description of the labels applied to the electrical panel............................................................................... 6
Figure 4 - Operating limits for standard units ...............................................................................................................9
Figure 5 - Operating limits with Option 187 ................................................................................................................10
Figure 6 - Freecooling system with 3 Way Valve ....................................................................................................... 11
Figure 7 - Freecooling system with 2 Way Valve ....................................................................................................... 11
Figure 8 - Operating limits with Option 187 ................................................................................................................12
Figure 9 - Lifting of the unit......................................................................................................................................... 13
Figure 10 - Minimum clearance requirements ............................................................................................................ 14
Figure 8 –Multiple Chiller Installation......................................................................................................................... 15
Figure 11 - Water piping connection for evaporator ................................................................................................... 17
Figure 12 - Water piping connection for evaporator ................................................................................................... 17