deconta C 25 L User manual

Instruction manual
Water Management System
C 25 L
Manufacturer: deconta GmbH
Im Geer 20, D - 46419 Isselburg
Description Water Management C 25 L
Type-No.: 563
Serial-No.: ..........

Instruction manual
Water Management Boiler system C 25 L
Seite 2
Table of contents
on page
1 Basic safety advice 3
2 Transport and storage 4
2.1 Delivery 4
2.2 Transport 4
2.3 Storage 4
3 Volume of delivery 5
4 Technical description 5
4.1 Intended use 5
4.2 Unit description 5
5 Technical data 6
6 Initial operation 7
7 Maintenance and care 9
7.1 Daily Maintenance 9
7.2 Filter change 9
7.3 Reduction of legionella growth 10
8 Circuit diagram 11
9 Declaration of conformity 12

Instruction manual
Water Management Boiler system C 25 L
Seite 3
The copyright of this instruction manual remains with deconta. This manual is intended for assembly,
operation and maintenance personnel. It contains instructions and drafts of technical nature which may
neither be distributed or used in any unauthorised way for competitive purposes nor passed on to others.
1 Basic safety advice
The handling of the appliance technology is only allowed for instructed staff. The
exact knowledge of this manual is an important condition for the staff before
handling the machine.
Please keep the instruction manual close to hand and available for everybody.
As an operator, you are obliged by deconta to follow the instruction manual and to use
this engineered technology equipment only in accordance with the regulations and its
suitability! In the event of non-observance, deconta assumes no liability.
To ensure safety during operation of the unit, the following must be strictly observed:
Do not use in potentially explosive areas.
Necessary repairs and maintenance may only be performed by authorized staff.
For all repair and maintenance work, the device is to be completely disconnected
from power supply
The safety and protective equipment is to be kept in perfect function.
Attached safety guidelines are to be kept in a readable state and are to be
followed.
Generally applicable legal and other binding regulations for accident prevention
and handling of hazardous substances must be observed.
To ensure safety, any changes on the machine are prohibited.
ATTENTION!
The Waste water filtration unit is not suitable for the use in condensed, corrosive,
flammable and explosive compartment air. The ambient and medium temperature
must be between +5 and +50°C.
We make explicit reference to the additional regional and national safety policies
and regulations in the operation of the equipment technology.

Instruction manual
Water Management Boiler system C 25 L
Seite 4
2 Transport and storage
2.1 Delivery
If no other agreements have been made, the unit is packed safely and will be delivered
ex work. Transport damages have to be immediately documented by the carrier or
another supplier. Please also note the possible damages on the way bill.
2.2 Transport
The Transport is to be proceeded with care to avoid damages by improper handling or
carelessness.
It is important to avoid exposure to violent shocks, otherwise the function and safety of
the unit cannot be guaranteed. In winter and at risk of frost, the whole unit (Pump, filter
housing and tank) needs to be emptied before transport.
Attention: Transport of unit (also relocation) only when empty.
2.3 Storage
In order to avoid damages, the installation has to be kept in a dry area with no access for
unauthorized persons.
Because of risk of frost in winter it is important to observe the following:
Empty water hoses, filter housing, tank and pumps
Place Water Management in a frost-protected area
Advice for the draining of the tank: To drain remove cap “empty tank“ and tilt valve.
Cap
Em
p
t
y
tank
„
OUT“
Valve

Instruction manual
Water Management Boiler system C 25 L
Seite 5
3 Volume of delivery
If no other agreements have been made, the scope of delivery of the water management
unit consists of:
Water Management System
Filter
Instruction manual
Return delivery after termination of rental period
We have to insist on following conditions for the return delivery in order to protect our
clients and in accordance with the rules for hazardous materials transportation:
As listed above
Well cleaned (ready for use)
Without binder remains
Without damages
Without filter
4 Technical description
4.1 Intended use
During asbestos sanitation works within closed rooms, you have to exclude that the
asbestos fibres leave the sanitation area uncontrolled and endanger the human health
and the environment. For this reason, personnel must leave the sanitation area through a
lock system and take a shower while leaving.
The deconta water treatment assumes the heating of the shower water and takes over
the filtering of the contaminated sewage water.
4.2 Unit description
This is an electric warm water storage for the heating of shower water. The desired outlet
temperature is reached by heating of the storage water (factory-adjusted approx. 37°C).
The produced shower water is pumped out and filtered.

Instruction manual
Water Management Boiler system C 25 L
Seite 6
5 Technical data
Volume service water 25 Liter
Tank filling: manually via filling port
Heating capacity: 1000 W
Filter stage: 1
Filter size: 10"
Power connection: 230 V
Power consumption: 7 A
Water connections: System Geka
Dimensions (L x W x H): 466 x 506 x 1000 mm
Weight: 44 kg
technische Änderungen vorbehalten

Instruction manual
Water Management Boiler system C 25 L
Seite 7
6 Initial operation
Before the initial operation of the waste water pump or after a long period of stagnation,
check that the shaft rotates freely when turned by hand. To this put a screwdriver in the
notch of the shaft end on the fan side and move the shaft. The strong initial rotational
resistance of the new pumps will come loose after running.
Unplug
Establish hose connections:
oConnection „Warm water shower water“ with shower top
oConnection „Sewage IN“ with shower tray
oConnection „Sewage OUT“ with sewage system
Fill waste water pump with water
Fill the tank manually via the filling port
Connect to power supply, the water in the tank is warmed
the unit is now ready-to-operate
Shower water
Sewa
g
e OUT Sewage IN

Instruction manual
Water Management Boiler system C 25 L
Seite 8
Operate Switch „Warm water Start“. Now water can be extracted from shower
head. At water extraction the waste water pump is switched on automatically.
By pushing and holding of the button „Waste water pump Start“ the Waste water
pump can be switched on manually.
Safety instructions:
During works on the device always disconnect the plug!
Operate the device only with mains which are secured with fault current protection
switch!
Never operate the device without water! In case of frost risk, empty the device by
opening the stopcock!
Check outlet temperature before every shower!
CAUTION! Danger of scalding
Warm water Start
Waste water pump Start

Instruction manual
Water Management Boiler system C 25 L
Seite 9
7 Maintenance and care
7.1 Daily Maintenance
Check hoses for free flow
Visual check of 220µ-Pre filter for dirt
7.2 Filter change
Attention:
Change Filter only when device is switched off
Demount dirty filters only in wet shape to avoid contamination
Use approved filters only
Do not use damaged filter candles
Filter head screw
Cap nut

Instruction manual
Water Management Boiler system C 25 L
Seite 10
Filter change:
Loosen cap nut with help of filter head screw
Remove filter and dispose of it
Insert new filter candles
Pay attention to correct fit and cleanliness of the seal ring
Tighten the nut
The suction hoses, pumps, filter housings and filter are contaminated after the first
use. Repairs and maintenance may only be executed under the observance of all
relevant safety measures. All the filters mentioned have to be disposed of
according to the legal terms.
7.3 Reduction of legionella growth
To avoid excessive legionella growth, we recommend to heat the water in the tank to a
temperature around >60°C once or twice a week.
To clean the hoses and the shower, the heated water should also be removed from the
shower for about 3 minutes.
Caution risk of scalding!
Alternatively, an approved disinfectants can also be used.

Instruction manual
Water Management Boiler system C 25 L
Seite 11
8 Circuit diagram

Instruction manual
Water Management Boiler system C 25 L
Seite 12
9 Declaration of conformity
EU-Declaration of conformity
deconta GmbH
Im Geer 20
D-46419 Isselburg
Product: Water Management C 25 L Type: 563
The design of the unit complies with EU-Machine directive 2006/42/EG
the following directives: EU-Low voltage directive 2006/95/EG
Applied harmonised standards: EN 292, EN 60335-1
Applied national standards: DIN VDE 0701, DIN VDE 0702
W.Weßling Isselburg, 24.06.2015
Other manuals for C 25 L
1
Table of contents
Other deconta Water System manuals
Popular Water System manuals by other brands

Pentek
Pentek UVS-110 Installation and operating instructions

HEBE
HEBE EGP-1000 user manual

Grundfos
Grundfos Oxiperm Pro OCD-162 Installation and operating instructions

YSI
YSI 600DW-B user manual

Lowara
Lowara ecocirc BASIC-N Installation and operating instructions

Mara
Mara GEA-SYS-16-0500 Operator's manual

Kinetico
Kinetico RO-Compact Series Installation and user manual

Taco
Taco Comfort Solutions 1900e Series instruction sheet

Zip
Zip HydroTap G4 Install instructions

WSMP
WSMP JR-138 Installation & maintenance

Everpure
Everpure Kleensteam II Single System EV9797-21 Specification sheet

EASTMAN
EASTMAN NEVERCOLD 70600 user manual