
Installation Instructions
LightBloc Zip™by Draper
Copyright © 2017 Draper Inc. Form LightBlocZip_Inst17-R Printed in U.S.A.
If you encounter any difficulties installing or servicing your LightBloc Zip, call your
dealer or Draper, Inc. in Spiceland, Indiana, 765-987-7999, or fax 765-987-7142.
Caution
1Inspect all boxes to make sure you have received the proper parts.
2Open cartons lengthwise.
3All hardware must be installed level. Shades must be level and square.
4DO NOT wire motors in parallel without written permission from Draper.
5Fasteners are not supplied by Draper. It is the responsibility of installer to
make sure that appropriate ones for the mounting surface are used. For Jamb
Mounting, Draper recommends the use of low profile head screws to allow the
"zippers" to easily pass through the Side Channels.
6For installing units in recessed areas where there isn't room to mount the
Headbox to the Side Channels, please see note on page two.
7LightBloc Zip is designed to operate only when the fabric panel is installed
vertically, perpendicular to the ground. Angled installations, where the side
channels are NOT installed vertically, may prevent the unit from closing.
9 DO NOT run down shade cloth outside of the Side Channels.
9Please read the following installation guidelines thoroughly and follow
them carefully. Failure to do so may cause product to fall or otherwise
fail, and invalidates warranty.
Continued on next page
Preparation for Installation
1Make sure mounting surface is strong enough to hold the LightBloc Zip.
Please Note: It is the responsibility of installer to
use appropriate fasteners for the mounting surface.
2Verify unit measurements, and make sure it will
fit in the desired location.
Please Note: The Hembar does not retract into
the Headbox. This will need to be accounted for
if mounting over a swinging window or door.
3Mounting brackets MUST be installed with a gap
of 1¾" (45mm) between the End Cap
and the Mounting Bracket edge (See Fig. 1).
Mark wall, jamb or ceiling.
4Drill small starter holes (if necessary) in mounting surface.
*** If Installing Zip 127 Angled Headbox see page 3. ***
Mounting Headbox with Brackets - Wall Installation
Attaching Mounting Brackets
1 Attach mounting brackets to the wall using #10
flat head screws installed flush with bracket.
Be sure to use AT LEAST 2 of the top
mounting holes (See Fig. 2).
2Attach Headbox to brackets and tighten Set Screws.
3You are now ready to mount the Side Channels (See Page 2).
1¾”
(45mm)
END
CAP
BRACKET
Mounting Headbox - Permanently to Ceiling or Wall
1 Attaching Mounting Brackets to Headbox
Attach Mounting Brackets to the Headbox
as a spacer between the Headbox
and the wall.
Leave a 1¾" (45mm) gap
between End Cap and
Mounting Bracket
(See Fig. 4), and
tighten set screws.
2Removing Roller Assembly
A. Remove screws from
bottom of Headbox, remove
Fascia and set aside.
B. Remove Quick Release
Pin from Idler End of Roller
Assembly.
C. Remove Roller Assembly,
Idler End first, and set aside.
3Mounting to Ceiling / Wall
Using the mounting holes in the end caps as a guide (See Fig. 6), drill pilot
holes on both ends of the Headbox. Attach to mounting surface using
appropriate fasteners.
Please Note: It is the
responsibility of installer to
use appropriate fasteners
for the mounting surface.
4 Once the Headbox is secured
to the mounting surface, re-install
Roller Assembly*, Quick Release
Pin and Fascia.
*Note: If there is no cable exit provided, you must drill one before
re-installing Roller Assembly. See Cable Exit on Page 4.
5You are now ready to mount the Side Channels (See Page 2).
Leave a
1¾” (45mm)
GAP for
Side-Channels
Attach
Mounting Bracket
as spacer and
Tighten Set Screws
Figure (1)
Figure (2)
Tighten Set Screws
Figure (4)
REMOVE
FASCIA
REMOVE QUICK
RELEASE PIN REMOVE ROLLER ASSEMBLY
Remove screws from
bottom of Headbox
Figure (5)
WALL
MOUNT HOLES
CEILING
MOUNT HOLES
CEILING
MOUNT HOLES
Figure (6)
OVERHEAD
STRUCTURE
Mounting Headbox with Brackets - Ceiling Installation (127mm only)
Attaching Mounting Brackets
1 Attach mounting brackets to the
ceiling using #10 flat head screws
installed flush with bracket.
Mounting bracket must be
secured to the overhead
building structure (See Fig. 3).
2Attach Headbox to brackets and tighten
Set Screws (See Fig. 3).
3You are now ready to mount the Side
Channels (See Page 2).
Figure (3)