manuals.online logo
Brands
  1. Home
  2. •
  3. Brands
  4. •
  5. Elecsys
  6. •
  7. Test Equipment
  8. •
  9. Elecsys Tracker LT User manual

Elecsys Tracker LT User manual

Elecsys Tracker LT -- Test Post and Critical Bond Installation
Quick-Start Guide
TRACKER LT TEST POINT
INSTALLATION PROCEDURE
Step 1: Determine if the unit will be
mounted on the top of the test point
post or on the side of the post.
(For top of post mounting, prep
the unit by feeding the cable through
the hole in the top of post adapter,
then using the screws, washers, and
nuts provided secure the adapter to
the unit.)
(For side of the post mounting,
prep the unit by rerouting the signal
cable from the bottom of the unit to
the side of the unit. Remove the 4
screws in the top of the unit to gain
access inside and swap the cord
grip and plug already in the unit.
Replace the top and secure with the
4 screws.)
Step 2: Cut the cable to the proper
length for the test site and connect
the wires per the wiring diagram be-
low (Brown, Yellow, & optional Blue/
White wires). NOTE: Be sure to use
electrical tape to insulate unused
wires to eliminate possible shorts or
errant grounding.
Step 3: For top mount installation
insert excess wire inside of post and
place top of post adapter in position
on the post. Use self-tapping screws
(not included) to secure the Tracker
LT unit to the post. For side mount
installation secure cable to post or
wall to allow for strain relief of the
connections.
Step 4: Call customer support to
congure the site.
TRACKER LT
CRITICAL BOND INSTALLATION
GUIDE
Step 1: Prep the unit by rerouting
the signal cable from the bottom of
the unit to the side of the unit.
Step 2: Remove the 4 screws in the
top of the unit to gain access inside
and swap the cord grip and plug
already in the unit.
Step 3: Thread cabling through cord
plug in the side of the unit.
Step 4: Replace the top and secure
with the 4 screws.
(continued on other side)
Package contents: Tracker LT Monitor Unit including connection harness cable and
antenna plus an adapter for 3” riser pipe installations.
*Please inspect package contents and immediately notify Elecsys Technical Support
at (913)825-6366 or email [email protected] if there are any discrepancies.
Installation Notes: Prior to beginning installation of this product, locate the serial num-
ber of the device on the label attached to the back of the enclosure and record it for
use in setting up the website with customer service.
IMPORTANT: Do not delay installation. Communication billing for this unit begins
upon installation or 90 days following product shipment, whichever comes rst.
Ser. #______________________
Call Elecsys Customer Support for installation help - (913) 825-6366
Go to www.elecsyscorp.com/Installation for videos and manuals.
Copyright 2017 Elecsys Corporation 81-0059-00 Rev D
Elecsys Tracker LT -- Test Post and Critical Bond Installation
Quick-Start Guide
Call Elecsys Customer Support for installation help - (913) 825-6366
Go to www.elecsyscorp.com/Installation for videos and manuals.
Copyright 2017 Elecsys Corporation 81-0059-00 Rev D
Step 5: Secure the unit to a post or
wall using lag bolts or self-tapping
hex head screws (not included).
Step 6: If necessary, drill hole in
junction box, install cord grip (not
included), and route the cable into
the junction box.
Step 7: Cut the cable to the proper
length and connect the wires per the
wiring diagram.
NOTE: Be sure to use electrical
tape to insulate unused wires and to
eliminate possible shorts or errant
grounding.
(continued from other side)
1. To activate the Tracker LT, press and hold the button on the
top of the unit for approximately 4 seconds until the ‘Power’
LED turns on solid then release to initialize communication to
the website. While initializing communication with the cellu-
lar network, the LED will ash in a steady On/O sequence.
e LED will turn o when the initial communication is com-
pleted. When communication is made with the website, the
website will send the latest conguration to the unit.
2. e Tracker LT will obtain measurements for all of the con-
gured channels and forward the data to the website.
3. e Tracker LT will automatically go into ‘sleep’ mode until
the next measurement cycle.
Unit Activation

Popular Test Equipment manuals by other brands

GAI-Tronics 530FB manual

GAI-Tronics

GAI-Tronics 530FB manual

Conrad energy 1509163 operating instructions

Conrad

Conrad energy 1509163 operating instructions

Cirris CH2 user manual

Cirris

Cirris CH2 user manual

MAHLE ROU250 Operation manual

MAHLE

MAHLE ROU250 Operation manual

PCE Instruments PCE-GM 60 Operation manual

PCE Instruments

PCE Instruments PCE-GM 60 Operation manual

Kett 94i-II operating manual

Kett

Kett 94i-II operating manual

Keysight Technologies U1610/20A Service guide

Keysight Technologies

Keysight Technologies U1610/20A Service guide

Tanaka APM-7 instruction manual

Tanaka

Tanaka APM-7 instruction manual

Laser 6803 instructions

Laser

Laser 6803 instructions

Retsch AT 100 XL manual

Retsch

Retsch AT 100 XL manual

Boston D402 user manual

Boston

Boston D402 user manual

Desco Europe Combo Tester X3 Technical bulletin

Desco Europe

Desco Europe Combo Tester X3 Technical bulletin

Micsig SATO1000 Series user manual

Micsig

Micsig SATO1000 Series user manual

Energy Recovery Pressure Exchanger PX Q400 Installation, operation and maintenance manual

Energy Recovery

Energy Recovery Pressure Exchanger PX Q400 Installation, operation and maintenance manual

APART IMPMET instruction manual

APART

APART IMPMET instruction manual

Nagman MTC 350 manual

Nagman

Nagman MTC 350 manual

Tektronix 535A instruction manual

Tektronix

Tektronix 535A instruction manual

Covita Gastro+ Gastrolyzer quick start guide

Covita

Covita Gastro+ Gastrolyzer quick start guide

manuals.online logo
manuals.online logoBrands
  • About & Mission
  • Contact us
  • Privacy Policy
  • Terms and Conditions

Copyright 2025 Manuals.Online. All Rights Reserved.