
Proline Promass I 100 Modbus RS485 Table of contents
Endress+Hauser 3
Table of contents
1 Document information .............. 5
1.1 Document function ..................... 5
1.2 Symbols used .......................... 5
1.2.1 Safety symbols .................. 5
1.2.2 Electrical symbols ................ 5
1.2.3 Tool symbols .................... 6
1.2.4 Symbols for certain types of
information .................... 6
1.2.5 Symbols in graphics ............... 6
1.3 Documentation ........................ 7
1.3.1 Standard documentation ........... 7
1.3.2 Supplementary device-dependent
documentation .................. 7
1.4 Registered trademarks ................... 7
2 Basic safety instructions ............ 8
2.1 Requirements for the personnel ............ 8
2.2 Designated use ........................ 8
2.3 Workplace safety ....................... 9
2.4 Operational safety ...................... 9
2.5 Product safety ......................... 9
3 Product description ................ 10
3.1 Product design ........................ 10
3.1.1 Device version with Modbus RS485
communication type ............. 10
4 Incoming acceptance and product
identification ..................... 11
4.1 Incoming acceptance ................... 11
4.2 Product identification ................... 12
4.2.1 Transmitter nameplate ........... 12
4.2.2 Sensor nameplate ............... 13
4.2.3 Promass 100 safety barrier -
nameplate .................... 14
4.2.4 Symbols on measuring device ...... 14
5 Storage and transport ............. 15
5.1 Storage conditions ..................... 15
5.2 Transporting the product ................ 15
5.3 Packaging disposal ..................... 16
6 Installation ....................... 17
6.1 Installation conditions .................. 17
6.1.1 Mounting position ............... 17
6.1.2 Requirements from environment and
process ....................... 19
6.1.3 Special mounting instructions ...... 20
6.2 Mounting the measuring device ........... 22
6.2.1 Required tools .................. 22
6.2.2 Preparing the measuring device ..... 22
6.2.3 Mounting the measuring device ..... 22
6.3 Post-installation check .................. 23
7 Electrical connection .............. 24
7.1 Connection conditions .................. 24
7.1.1 Required tools .................. 24
7.1.2 Requirements for connecting cable ... 24
7.1.3 Terminal assignment ............. 26
7.1.4 Pin assignment, device plug ........ 28
7.1.5 Shielding and grounding .......... 29
7.1.6 Preparing the measuring device ..... 29
7.2 Connecting the measuring device .......... 29
7.2.1 Connecting the transmitter ........ 30
7.2.2 Connecting the Safety Barrier
Promass 100 ................... 31
7.3 Hardware settings ..................... 32
7.3.1 Enabling the terminating resistor .... 32
7.4 Ensuring the degree of protection .......... 32
7.5 Post-connection check .................. 33
8 Operation options ................. 34
8.1 Overview of operation options ............ 34
8.2 Structure and function of the operating
menu .............................. 35
8.2.1 Structure of the operating menu .... 35
8.2.2 Operating philosophy ............ 36
8.3 Access to the operating menu via the
operating tool ........................ 37
8.3.1 Connecting the operating tool ...... 37
8.3.2 FieldCare ..................... 37
9 System integration ................ 39
9.1 Overview of device description files ......... 39
9.1.1 Current version data for the device ... 39
9.1.2 Operating tools ................. 39
9.2 Modbus RS485 information .............. 39
9.2.1 Function codes ................. 39
9.2.2 Register information ............. 40
9.2.3 Response time .................. 40
9.2.4 Modbus data map ............... 40
10 Commissioning .................... 43
10.1 Function check ....................... 43
10.2 Establishing a connection via FieldCare ...... 43
10.3 Configuring the measuring device .......... 43
10.3.1 Setting the system units .......... 43
10.3.2 Selecting and setting the medium ... 46
10.3.3 Configuring communication
interface ...................... 47
10.3.4 Configuring the low flow cut off ..... 49
10.3.5 Configuring the partial filled pipe
detection ..................... 50