Installation Task Map for SPARC Enterprise M4000/M5000 Servers
Step 1 • Verify power, air conditioning, and floor area requirements. — Refer to the SPARC
Enterprise M4000/M5000 Servers Site Planning Guide and.
Step 2 • Set up the equipment rack. — Refer to the SPARC Enterprise Equipment Rack Mounting
Guide.
Step 3 • If your server was preinstalled in an equipment rack, proceed to Step 5 to connect your
console to a server.
• If your server needs to be rackmounted in an equipment rack, proceed to Step 4.
Step 4 •
Mount the server in the equipment rack. — Refer to the
SPARC Enterprise Equipment Rack
Mounting Guide.
Step 5 • Connect the console to a server. — Refer to the SPARC Enterprise M4000/M5000 Servers
Installation Guide.
Step 6 • Connect the power cables— Refer to the SPARC Enterprise M4000/M5000 Servers
Installation Guide.
Step 7 • Power on the power source (equipment rack). — Refer to the SPARC Enterprise M4000/
M5000 Servers Installation Guide.
Step 8 • Prepare information for hardware configuration. - Refer to the SPARC Enterprise
M3000/M4000/M5000/M8000/M9000 Servers XSCF User's Guide.
Step 9 • Power on the servers. Check that POST runs successfully on the eXtended system
control facility unit (XSCFU) and confirm there are no errors.— Refer to the SPARC
Enterprise M4000/M5000 Servers Installation Guide.
Step 10 • Set up the XSCFU for network access. —Refer to the SPARC Enterprise M3000/M4000/
M5000/M8000/M9000 Servers Administration Guide
Step 11 •
If additional hardware or peripheral devices are to be installed into your server, proceed to
Step 12
.
• If additional hardware or peripheral devices are not to be installed into the server, proceed to
Step 16.
Step 12 • Turn off the power source (equipment rack). —Refer to the SPARC Enterprise M4000/
M5000 Servers Installation Guide.
Step 13 • Install additional hardware or peripheral devices. Refer to the documentation that
came with the hardware or peripheral devices for details.
Step 14 • Turn on the power source (equipment rack). —Refer to the SPARC Enterprise M4000/
M5000 Servers Installation Guide.
Step 15 • Allow each domain to run through POST and confirm there are no errors.
Step 16 • Check the network settings and connections. —Refer to the SPARC Enterprise M4000/
M5000 Servers Installation Guide.
Step 17 • Confirm operation by using Oracle VTS. — Refer to the SPARC Enterprise M4000/M5000
Servers Installation Guide.
Step 18 • Make the initial settings for each domain. —Refer to the SPARC Enterprise M3000/
M4000/M5000/M8000/M9000 Servers Administration Guide.
Notes:
We recommend you to install Enhanced System Facility (ESF) and apply PTF for safe
operation of the system. See the following website for details.
http://www.fujitsu.com/sparcenterprise/manual/