
3 0 - 6 0 c m
ON
OFF
00
10
20
30
40
50
60
ON
ON
OFF
ON
OFF
ON
OFF
2
1. Connection of electrical supply. Make sure that the supply cable is at least 4mm at 220V.
Note: Make sure that the facility supply voltage and frequency are the same as shown on
the equipment name plate.
2. Connect to power supply of AC 220V. Switch on the equipment. The LED display will show
the normal voltage as 220V.
3. Set time and power according to the requirements of the paint to achieve the best curing
result. (Usually, the values are set at 15mins in time and 70% in power.)
4. Adjust the distance from heat source to paint surface. (Usually, keeping a distance of 45cm
from the paint surface is best.)
5. Protect the lamp against shocks and vibrations especially when it is cold.
6. During the curing process, the paint surface must be clean, without water and impurities.
7. Preferably do not touch quartz with bare hands. If grease or chemical compounds are
deposited on the quartz, simply clean with a cloth moistened with alcohol.
5. Operation
Install machine
Data is displayed
on screen
Set up temperature
Switch off
Connect input power Switch on
Set up time Keep heat source parallel
to the paint surface a
distance of 30-60cm
Lamp selector
Page 5