
Installation
83A1651B
Install Primary Heaters and Wires
22. Remove plugs from access holes (N) on each side
of the machine base and install snap-in wire protec
tion bushings. See FIG. 8.
23. Use four screws (P) to mount each primary
heater (R) to the side of the machine base. Do not
install the blue primary heater plastic guards.
24. Route wire ferruled end of harnesses (S) from each
heat panel inside of machine base through the
snap-in bushings.
25. Apply oxide inhibitor to wire ferrules on each
harness (S) and connect to the corresponding pri
mary heater splice connectors (T).
26. Route high volume wire harness (S) with blue
PG508 label from high volume primary heater
through the snap-in bushing to the high volume heat
panel. Connect harness (S) to port 3 of the high vol
ume HPTCM as shown in FIG. 9.
27. Route low volume wire harness with red PG647
label from low volume primary heater through the
snap-in wire protection bushing to the low volume
heat panel. Connect harness to port 3 of the low vol
ume HPTCM.
28. Route the ground wire (X) of each harness (S)
through the snap-in bushing of the machine base
and through the snap-in bushing on the heater
mounting plate (Y). Connect to heater grounding
point (Z) using screw and lockwasher. See FIG. 8.
29. Route RTD connector (AA) from each primary
heater through snap-in bushing to corresponding
HPTCM. For the high volume heat panel, the con
nector with blue RTD480 label connects to port 2
and connector with blue OTS490 label connects to
port 1 of the high volume HPTCM. For the low vol
ume heat panel, the connector with red RTD618
label connects to port 2 and connector with red
OTS628 label connects to port 1 of the low volume
HPTCM.
FIG. 8: Base with Heaters
FIG. 9: High Volume Primary Heater Connections