GROWSPAN™ESTATE ELITE GREENHOUSES
2Revision date: 01.01.16
YOU MUST READ THIS DOCUMENT BEFORE YOU
BEGIN TO ASSEMBLE THE SHELTER.
Thank you for purchasing this GrowSpan™ greenhouse.
When properly assembled and maintained, this product will
provide years of reliable service. These instructions include
helpful hints and important information needed to safely
assemble and properly maintain the greenhouse. Please
read these instructions before you begin.
SAFETY PRECAUTIONS
• Wear eye protection and gloves when handling panels
and frame parts.
• Frame is metal. Use a portable GFCI when working
with power tools and cords.
• Do not climb on the greenhouse or framing during or
after construction.
• Do not occupy the greenhouse during high winds,
tornadoes, or hurricanes.
• Provide adequate ventilation if the structure is
enclosed.
• Do not store hazardous materials in the greenhouse.
• Provide proper ingress and egress to prevent
entrapment.
ANCHORING INSTRUCTIONS
Prior to assembling this greenhouse, please read the
MUST READ document included with the shipment.
WARNING: The anchor assembly is an integral part
of the greenhouse construction. Improper anchoring
may cause greenhouse instability and failure of the
structure. Failing to anchor the greenhouse properly
will void the manufacturer’s warranty and may cause
serious injury and damage.
LOCATION
Choosing the proper location is an important step before
you begin to assemble the structure.
The following suggestions and precautions will help you
determine whether your selected location is the best
location.
• Never erect the structure under power lines.
• Identify whether underground cables and pipes are
present before preparing the site or anchoring the
structure.
• Location should be away from structures that could
cause snow to drift on or around the building.
• Do not position the greenhouse where large loads
such as snow and ice, large tree branches, or other
overhead obstacles could fall.
• Always check local building codes before you begin.
SITE
After choosing a location, proper preparation of the site is
essential. The following site characteristics will help ensure
the integrity of the structure.
• A level site is required. The site must be level to
properly and safely erect and anchor the structure.
• Drainage: Water draining off the structure and from
areas surrounding the site should drain away from the
site to prevent damage to the site, the structure, and
contents of the structure.
WARNING: The individuals assembling this structure
are responsible for designing and furnishing all
temporary bracing, shoring and support needed during
the assembly process.
For safety reasons, those who are not familiar with
recognized construction methods and techniques must
seek the help of a qualified contractor.
ASSEMBLY NOTE
The assembly of this greenhouse is not complex; however,
it does take time and additional assistance. For best
results, read through these instructions before you begin to
get an overview of the entire assembly. Then, follow these
instructions as presented.
Examine all diagrams and photos and verify that you have
selected the proper parts from the correct box or boxes. Do
not mix parts from different boxes. When checking parts,
place the parts back into the same box they were removed
from and continue with the next box.
IMPORTANT! INVENTORY THE PARTS
1. Open one box and use the Bill of Material included in
that box to inventory the contents. See Page 39 for Box
9-4 (104611) or Box 7-4 (104609) for cresting parts.
2. Return all parts and the Bill of Material to the box and
repeat the procedure for all remaining boxes.
3. Call Customer Service at 1.800.245.9881 to report
any missing parts before you begin assembling the
greenhouse.