HMS-VILGO VERTIC 2 Fortissimo User manual

1
VERTIC 2 Fortissimo user guide
Version 12/2018
2
2
F
Fo
or
rt
ti
is
ss
si
im
mo
o
330Kg / 52 stones

2
VERTIC 2 Fortissimo user guide
Version 12/2018

3
VERTIC 2 Fortissimo user guide
Version 12/2018
December 2018 edition:
All rights reserved. Reproduction of these instructions in whole or in part in any form without express written
permission from HMS-VILGO is strictly prohibited except for private use.
Information is regularly updated in the latest instructions versions. This can not engage the responsibility of
HMS-VILGO in any way.
Warning :
The pics on this leaflet are not under contract.
Therefore, HMS-VILGO has the right to change the products inside anytime.
TABLE OF CONTENTS
1. PREAMBLE
…………………………………………………………………………
page 4
2. DESCRIPTION
…………………………………………………………………
page 4-7
2.1. Where to use Vertic 2 Fortissimo
2.2. General description
2.3. Technical description
2.4. Dimensional characteristics
2.5. Labelling
3. VERTIC 2 FORTISSIMO ASSEMBLING
…………………………………..……
page 8
3.1. Package contents –first use
3.2. Vertic 2 Fortissimo assembling
RECOMMENDED CHECKS
……………………………………………………………..
page 9
EVALUATION OF THE NUMBER OF HOIST OPERATING CYCLES
….....…
page 10
MAINTENANCE BOOK
………………………………………………………..……….
page 11
SPARE PARTS LIST
…………...………………………………………
page 12
4. USE
………………………………………………………………………….
page 13-16
4.1. Vertic 2 Fortissimo connection
4.2. First use Vertic 2 Fortissimo
4.3. Safety
4.4. Control box operating, battery charge
4.5. Storage instructions
5. MAINTENANCE
……………………………………………..
page 16-17
5.1. Weekly maintenance
5.2. Annual maintenance
5.3. Warranty
5.4. Recycling

4
VERTIC 2 Fortissimo user guide
Version 12/2018
1. PREAMBLE
Only entitled staff who has read and understood these complete instructions can use Vertic 2 Fortissimo.
Always use Vertic 2 Fortissimo with a person who can belay the patient in case of blackout of the patient or
failure of the hoist.
Use Vertic 2 Fortissimo following the maintenance instructions (see Vertic 2 Fortissimo maintenance
paragraph). If you have any doubt about Vertic 2 Fortissimo operating, please call HMS-VILGO After Sales
Service for a diagnostic before using the hoist on a patient.
HMS-VILGO will not be responsible for damage if these warnings are not followed.
This manual contains all the technical information you need to make a good use of this product. This
information has been carefully checked by HMS-VILGO. This is not an exhaustive list and HMS-VILGO is not
responsible for any kind of mistakes or omissions.
2. DESCRIPTION
2.1. WHERE TO USE VERTIC 2 FORTISSIMO
The Vertic 2 Fortissimo is a lifting and transfer device. It is used to transfer disabled or elderly people:
- At home, to transfer the patient to an armchair, a toilet seat or a chair,
- In independent living structures,
- In a nursing or care home
Do not use Vertic Fox outdoors or on a surface whose declivity could make the patient fell down (>5°).
Before any use of the product :
1- Read the leaflet : It will inform you how to use the product securely and must
be at the disposal of the caring personnel.
2- Product cleaning and disinfection : Please see chapter 5.
3- Connection of the Vertic 2 Fortissimo to the electrical network : Please see
chapter 4.5
4- Make sure of the good working of all functions.

5
VERTIC 2 Fortissimo user guide
Version 12/2018
2.2. GENERAL DESCRIPTION
2.3. TECHNICAL CHARACTERISTICS
Materials : steel
Finish : Epoxy paint coating
Class: I
Weight: 55 kg
Weight per item: chassis : 25 kg
Mast + arms : 13 kg
Leg rest : 5kg
Foot rest : 10 kg
Maximum patient weight to be transferred: 330 kg
Electric protection classification : Class II
Applied parts : Type B
Electrical equipment conformed to NF EN 60 601-1 and to NF EN 60 601-1-2
Duty cycle : 2 min./18 min. (10%)
Input : 230V ~ 50 HZ
Actuator input : 24 V CC
Battery charge required time : 15 hrs
Battery autonomy : 40 cycles
Electrical equipment protection : remote control : IP X6
control box : IPX4
actuator : IP X4
Side foot Electric
actuator
Mast
Control box
Driving handles
Arms
Mast support
Side foot
Electric actuator
5in wheels
5in wheels
with brake
Foot rest
Legs rest
Patient handles

6
VERTIC 2 Fortissimo user guide
Version 12/2018
2.4. DIMENSIONAL CHARACTERISTICS
Dimensionnal characteristics of the base
1 - Maximum external length : 49.6 in
2 - Maximum internal length: 33.8 in
3 - Minimal internal width: 21.6 in
4 - Minimal external width : 27.4 in
5 - Maximum internal width : 33.8 in
6 - Maximum external width: 39.4 in
7 - Minimum ground clearance : 1.6 in
8 - Maximum front height : 6.5 in
9 - Maximum back height : 6.5 in
Total lift / lifting radius / overall dimension :
1 - Lifting radius at the highest suspension point : 3.5 in
2 - Total lift (3-4): 30 in
3 - Minimal suspension point height : 31 in
4 - Lifting radius at lowest point: 17.7 in
5 - distance between floor &hooks in the low position 29.9 in
6 - distance between floor &hooks in the high position: 57.5 in
7 - Overall height when in the low position: 42.3 in
8 - Overall height when in the high position: 61 in
9 - Overall dimension length : 49.6 in
10 - Floor/handles height : 41.7 in
11 - Floor / leg rest height (mini
→
maxi) 15.7→22 in
6
5
4
2
1
3
9
8
7
7
11
3
9
4
8
1
10

7
VERTIC 2 Fortissimo user guide
Version 12/2018
2.5. LABELLING
This label allows you:
To have all the necessary informations to make any
intervention request for the after sales service thanks to
the serial number and to the reference.
To ensure the follow up of the medical disposal.
It also gives to you the security loading charge for a good use.
There are 4 labels: One on the basis of the Vertic 2 Fortissimo, one on the electric actuator, one on the control
box and one on the remote control.
Standards :
By this label, HMS-VILGO ensures that Vertic 2 Fortissimo hoist is conformed to European
directive 89/336 referring to electromagnetic compatibility and to European directive 93/42
referring to medical devices.

8
VERTIC 2 Fortissimo user guide
Version 12/2018
Sling (Option)
3. VERTIC 2 FORTISSIMO ASSEMBLING
3.1. PACKAGE CONTENTS
The following parts are in the package:
3.2. FIRST USE
Remove the fasteners and drop on the ground the Vertic 2 Fortissimo.
All connections are made in factory and the battery delivered with it is fully charged so that you can start using
the hoist immediately. Check the emergency stop of control box is unlock, and try it without a patient to get
familiar with its use and functions.
Main cable
(x1)
1 pocket contening :
User guide
(x1)
Vertic 2
Fortissimo

9
VERTIC 2 Fortissimo user guide
Version 12/2018
R
RE
EC
CO
OM
MM
ME
EN
ND
DE
ED
D
C
CH
HE
EC
CK
KS
S
12
4
10
5
13
9
8
6
3
7
4
2
1
11
14
Item to check
Check
Periodicity: at least once a year and before renting it.
* Replacement
after 11 000 cycles
1
mast / arms connection
- Check brass ring worn state
- Check fixing axle worn state
- Check stop-nut presence and assembling
✓
2
Control box
- Check emergency stop operating
- Check battery charging
3
Actuator
- Check charging operating
4
Actuator / pole
connection
- Check fixing screw worn state
- Check stop-nut presence and assembling
✓
5
Electrical cables
- Check cables (pinching, plug state, cut …)
6
Side feet moving
- Check actuator operating
- Check screw and stop-nut presence, assembling and wear
7
Front and back wheels
- Check the correct fixing on the side foot
- Check braking system (back wheels)
8
Side foot / cross piece
connection
- Check fixing wear level (screw nut and bushing)
9
Actuator / arms
connection
- Check fixing screw wear level
✓
10
Hooks
- check welding of the 3 hooks
11
Emergency release
- Check electrical and manual release operating
12
Sling
- Check seams
13
Leg rest
- check the welding point of the leg rest
- check the blocking device
14
Pole / pole support
connection
- Check knobs and screws presence and assembling
- Check supports poles welding
15
Foot rest wheels
- Check the correct fixing on foot rest for each wheel
*Se reporter au tableau en page 10 pour déterminer la liste des pièces détachées nécessaires
Réf. Document : IB 7.5.1. 709 indice A
Hoists are conformed to EN 10 535 standard which means that they can run 11 000 complete cycles under
the conditions of uses they are designed for. Please, carefully consider how important it is to evenly check
and maintain it in order to make sure that it is used under the standard specifications and under ours
recommendations. We will not be responsible for any damage due to an abnormal use or to a too high
number of cycles. You will find all the information you need for your checking and maintenance steps on
pages 9, 10, 11 and 12.

10
VERTIC 2 Fortissimo user guide
Version 12/2018
E
EV
VA
AL
LU
UA
AT
TI
IO
ON
N
O
OF
F
T
TH
HE
E
N
NU
UM
MB
BE
ER
R
O
OF
F
H
HO
OI
IS
ST
T
O
OP
PE
ER
RA
AT
TI
IN
NG
G
C
CY
YC
CL
LE
ES
S
This table below, indicates if the replacement of axis and spare parts is necessary, in function of the number
of runs a day.
number of runs / a day 1 2 3 4 5 6 7 8 9 10
1365 730 1095 1460 1825 2190 2555 2920 3285 3650
2730 1460 2190 2920 3650 4380 5110 5840 6570 7300
31095 2190 3285 4380 5475 6570 7665 8760 9855 10950
41460 2920 4380 5840 7300 8760 10220 11680 13140 14600
51825 3650 5475 7300 9125 10950 12775 14600 16425 18250
62190 4380 6570 8760 10950 13140 15330 17520 19710 21900
72555 5110 7665 10220 12775 15330 17885 20440 22995 25550
82920 5840 8760 11680 14600 17520 20440 23360 26280 29200
93285 6570 9855 13140 16425 19710 22995 26280 29565 32850
10 3650 7300 10950 14600 18250 21900 25550 29200 32850 36500
11 4015 8030 12045 16060 20075 24090 28105 32120 36135 40150
12 4380 8760 13140 17520 21900 26280 30660 35040 39420 43800
13 4745 9490 14235 18980 23725 28470 33215 37960 42705 47450
14 5110 10220 15330 20440 25550 30660 35770 40880 45990 51100
15 5475 10950 16425 21900 27375 32850 38325 43800 49275 54750
16 5840 11680 17520 23360 29200 35040 40880 46720 52560 58400
17 6205 12410 18615 24820 31025 37230 43435 49640 55845 62050
18 6570 13140 19710 26280 32850 39420 45990 52560 59130 65700
19 6935 13870 20805 27740 34675 41610 48545 55480 62415 69350
20 7300 14600 21900 29200 36500 43800 51100 58400 65700 73000
21 7665 15330 22995 30660 38325 45990 53655 61320 68985 76650
22 8030 16060 24090 32120 40150 48180 56210 64240 72270 80300
23 8395 16790 25185 33580 41975 50370 58765 67160 75555 83950
24 8760 17520 26280 35040 43800 52560 61320 70080 78840 87600
25 9125 18250 27375 36500 45625 54750 63875 73000 82125 91250
26 9490 18980 28470 37960 47450 56940 66430 75920 85410 94900
27 9855 19710 29565 39420 49275 59130 68985 78840 88695 98550
28 10220 20440 30660 40880 51100 61320 71540 81760 91980 102200
29 10585 21170 31755 42340 52925 63510 74095 84680 95265 105850
30 10950 21900 32850 43800 54750 65700 76650 87600 98550 109500
Oldness of the hoist (years)
Prévoir le remplacement du
vérin, des axes et des pièces
d’usure
* Remplacer vérin,
axes et pièces d’usure
Continuer l’utilisation et l’entretien
périodique hebdomadaire du
releveur
Foresee axles and spare
parts replacement.
* Replace axles and
spare parts.
Keep using the hoist.
*See spare parts list page 12

11
VERTIC 2 Fortissimo user guide
Version 12/2018
M
MA
AI
IN
NT
TE
EN
NA
AN
NC
CE
E
B
BO
OO
OK
K
HOIST REFERENCE:
Serial number :
Date of 1st use :
DATE
/
Number of cycles
evaluated
MAINTENANCE AND QUALITY CHECKING
NAME &
APPROVALS

12
VERTIC 2 Fortissimo user guide
Version 12/2018
S
SP
PA
AR
RE
E
P
PA
AR
RT
TS
S
L
LI
IS
ST
T
Pièce
Désignation
Code
article
Qtité
Emplacement
Remplacement
à 10 000 cycles
LA34 actuator 10 000N (course 250)
A501530
1
/
CBJC Control box
A501449
1
/
BAJ1 Battery
A000906
1
/
LA 28 Vertic 2 fortissimo actuator
A501544
1
/
2 functions remote control for CBJC
A501464
1
/
HH 12x70 screw
A501250
2
mast / cross
piece
connection
HH 12x60 screw
Ø12 stop nut
A501249
A001080
1
actuator / arms
connection
✓
HH 12x60 screw
Ecrou frein Ø12
A501249
A001080
1
actuator / mast
connection
✓
Ø 40-14.2-e2 brass ring
Ø14-M12-Lg91 axle
Stop nut Ø 12
Ø12 ZI washer
A501404
A501402
A001080
A001088
4
2
4
6
mast / arms
connection
✓
HH 10x100 screw
Ø10 stop nut
D16-di 10-lg86 bushing
D22-di 16-lg60 bushing
A501375
A001072
A501406
A501409
2
2
2
2
Side foot /
cross piece
connection
3in twin wheel (under foot rest)
HH 10x30 ZI screw
Ø 10/20 ZI washer
A501016
A207229
A001020
4
4
4
foot rest wheel
5in rear wheel (with brake)
HF BTR 12x35 ZI screw
Stop nut Ø 12
A501547
A501392
A001080
2
2
2
rear wheel
5in front wheel (without brake)
HF BTR 12x35 ZI screw
Stop nut Ø 12
A501546
A501392
A001080
2
2
2
front wheel

13
VERTIC 2 Fortissimo user guide
Version 12/2018
Actuator connection:
entry n°1
Side foot Electric
actuator: entry n°2
Main cable connection
Actuator connection (réf.
A501530)
actuator cable / control
box CBJ connection (réf.
A501451)
Locking clip
(réf. A501491)
Check locking clip
set up
4. USE
4.1. PLUGGING
Plugging to CBJC control box :
Locking clip set up :
Remote control
connection

14
VERTIC 2 Fortissimo user guide
Version 12/2018
4.2. VERTIC 2 FORTISSIMO USE
4.2.1 Sling installation and operating :
Reminder: Sling is adjustable. User is responsible for adjusting it in order to not hurt the patient. Vertic2 is
delivered with its sling. See the user instruction bellow.
4.2.2 Transfert du patient :
Le patient étant assis sur une chaise, un fauteuil ou au bord d’un lit à hauteur variable :
1/ Set the hoist in a way that the beam stands above the patient (if necessary,
open or close side foot to get closer to the patient).
2/ Adjust the leg-rest up or down to block the patient’s shins
against it (You can also adjust the incline)
3/ Lock brakes
4/ Set up the sling
5/ Press the up button on the handset ()to lift up the main pole (make sure the
sling is not stuck and does not injure the patient while doing this).
6/ Unlock brakes to transfer the patient.
7/ Press the down button () to bring the patient down.
A
B
C
D
1/ Undo the abdominal belt.
2/ Put the sling behind the patient’s back and slide the A and B parts to be hooked, under
his/her arms.
3/ fasten the belt around the patient’s belly.
4/ Attach snap hook A to one of the C rings
5/ Attach snap hook B to one of the D rings

15
VERTIC 2 Fortissimo user guide
Version 12/2018
4.3. SECURITE
crushing safety: Vertic 2 Fortissimo runs with a single-acting actuator. Any obstacle on its way will
automatically stop its going-down.
Emergency stop : the Vertic 2 Fortissimo emergency stop button is located on the
control box. Push it to stop the lifting or going-down. Turn it to unlock it.
Electric safety : lifting and going-down are locked when Vertic 2 Fortissimo is connected
to charge battery.
Alarm : a red led lights on when the actuator is running while battery is low.
Emergency going-down (only use when patient is stuck above and that it is impossible to go down using the
remote control) : There are two actuator release systems:
1/ Electrical release :
To go down, push the blue switch located under the emergency stop.
2/ Manual release :
Push up the red ring of the actuator.
This function can be used if the electrical system is not efficient.
4.4. CONTROL BOX OPERATING, BATTERY CHARGE :
If the charging level is too weak, an alarm sounds (in a constant way) when the control box is activated. The charging of
the battery is then necessary.
The control box has its own integrated charger. To charge batteries, connect the control box to the 220 VAC
main power line, until the green led turn on indicating batteries are charged (approximately 12 hours).
A third person must assist the patient during the
entire emergency going-down process.
The Vertic 2 Fortissimo must be connected to a network which is in accordance with the
NFC 15-100 and NFC 15-211 ( 230 V Electric plug + ground connection) for France and
CEI 364 for other destinations.
Make sure that the power supply of the control box (you can find it on the label), is in
accordance with the establishment power supply.
It is advisable to connect the device on a power fitting protected by a differential circuit
breaker of 30 mA Maximum, in accordance with the CEI 364-5-53 publication.

16
VERTIC 2 Fortissimo user guide
Version 12/2018
Warning, the loading of the batteries works only if the emergency button is out of power (put it on the position
‘on’ to load the batteries).
To make batteries last longer, they must be recharged every night.
4.5. STORAGE INSTRUCTIONS:
Do not expose to moisture.
Store in a temperate dry place (5°C to 40°C).
Charge battery before using it after a long time off (maximum storage: 6 months).
Handling and stocking of the lift has to be done in order to avoid any impact, falling or damage of the material.
5. VERTIC 2 FORTISSIMO MAINTENANCE
5.1 WEEKLY MAINTENANCE
Sling :
Check the sling by looking at its seams condition : immediately replace a sling that starts to show any tear.
Electrical parts:
Test the emergency stop switch while lifting and lowering the support beam.
Look at the electrical cables cover.
Test crushing safety system by placing an item on the support beam going-down way.
Chassis :
Check the brake of the back wheels.
Look at the global geometry on the Vertic 2 Fortissimo (no bent item).
Make sure that the wheels are well positioned on the ground.
Make sure that there is no play between the support beam and the pole.
Sling cleaning instructions:
86°F (or 30°C) machine wash - Do not dry clean - Do not iron
Actuator connection
Remote control connection
Emergency stop
LED green color when the
control box is activated
vert / rouge
Orange charging LED
Emergency going down
Main cable connection

17
VERTIC 2 Fortissimo user guide
Version 12/2018
Cleaning of the Vertic 2 Fortissimo:
Before any intervention on the Vertic,2 fortissimo disconnect it from the power and take out the control box.
Follow this cleaning protocol.
5.2 ANNUAL MAINTENANCE
We recommend a complete annual check up on this type of device. Please find on page 9-12 the summary of
the necessary controls and checkups you need to perform on the hoist; as well as the maintenance sheet to
log in all interventions.
5.3 WARRANTY
Your Vertic 2 Fortissimo hoist has its own serial number. This number is on a label on the chassis and is
repeated on every electrical part. To make a claim using the warranty, you need to return the faulty part, with
its serial number label to your retailer who will contact us.
The warranty of this product is valid for 5 years (except battery: 1 year).
ANY RETURN WITHOUT SERIAL NUMBER LABEL WILL NOT BE COVERED BY THE WARRANTY.
The warranty does not cover any breakdown due to inappropriate or wrong use or maintenance, in spite of the
specifications and use instructions stated in this manual. (electrical shock, torn cables etc.)
Warranty does not cover any breakdown or malfunction due to parts being swapped over or replaced with
used or unapproved parts.
5.4 RECYCLING
Recycling must be done according to the type of materials and components and in compliance with the
current recycling regulations. Disposal and destruction of the faulty parts must be handled by an agreed
recycling company.
1-Use a non-woven fabric and a relevant
cleaning solution (ANIOS DETERGENT
DESINFECTANT SURFACES HAUTES
Or any similar product).
Apply the indicated dosage.
2-Clean all surfaces.
3-Let dry.
WARNING:
-Do not splash water onto the device
- Do not use high-pressure cleaning
STRICTLY FORBIDDEN:
-pure alcohol (PA)
-Acetone
-tetrachloroethylene and trichlorethylene
-any type of solvants
-abrasive cleaning products
-any type of wax

18
VERTIC 2 Fortissimo user guide
Version 12/2018

19
VERTIC 2 Fortissimo user guide
Version 12/2018

20
VERTIC 2 Fortissimo user guide
Version 12/2018
Cachet distributeur
www.hms-vilgo.com
Site de Lille : Parc Eurasanté –243 Rue Allendé
59120 LOOS LEZ LILLE
Tél : +33 (0)3 20 84 81 50 –Fax : + 33 (0)3 20 59 58 08
Site de Bergerac : Rte de Sainte Alvère - Creysse BP 212
24102 BERGERAC Cedex
Tel. : +33 (0)5 53 74 45 50 –Fax : +33 (0)5 53 63 06 07
2
2
F
Fo
or
rt
ti
is
ss
si
im
mo
o
Table of contents
Other HMS-VILGO Lifting System manuals
Popular Lifting System manuals by other brands

Lift King
Lift King 243156LK+P04 Installation, operation and maintenance manual

Peak
Peak SML-2500 Installation and service manual

Terex
Terex Genie SX-135 XC Operator's manual

Rotary
Rotary SL212i 400 Series Operation & maintenance manual

Sealey
Sealey MT680.V4 instructions

Crescent
Crescent C2000 Usage instructions