___Red draw bar holder and tie-down bracket removed from header. - page 39
___Set front reel bats to operational position (reinstalled from transport position). - page 38
___Remove reel tie-downs installed from factory.
___Install crop dividers.- page 38
___Check draper tension as per decal on back panel. Adjust if necessary. - page 94
___Walk around the header, checking belts, bolts and shields to ensure everything is tight and in good working order.
Install Automatix Lite harness on the combine, note if the electrical system is positively or negatively switched, hook up the battery
___leads accordingly. - page 42
___Install Automatix Lite control panel in combine cab & connect to electrical harness. - page 42
___Unlock the transport cart and draw bar, lift header with the combine then remove the cart and draw bar. - page 39
___Attach multicoupler and electrical connection(s) - page 42
___Attach the drive shafts to the left and right hand sides of the combine feeder house. - page 44
___Check the clearance between the feed auger drum, stripper plate and feeder house. - page 52
___Check feed auger nger timing, ensure adjustment arm is in middle hole with ngers in fully forward position. - page 51
___Set header to rigid mode & pressurize to 90-115psi, ensure all tabs on ex sensing rod are in proper position. - page 117
___Set the faceplate angle using adjustment bolts on the combine’s feeder house (if possible) - page 47
___Set reel nger pitch to a starting point of 5. - page 59
___Ensure reel ngers clear cutter bar by minimum of 1 1/2”. Adjust reel height if necessary. (In order to fully extend RH reel lift cylinder
the header reel must be running. - page 50
___Ensure the reel is centered on the header. - page 51
___Set Auto Header Height parameters in combine control panel (Combine and Sensitivity Settings)
___Calibrate combine (In FLEX mode)
___Run header and ne tune drive belt to minimize vibration and get it running smoothly.
___Walk around the header while it is running to ensure everything is running smoothly
___If possible test in the eld or lot and ne tune sensitivity settings if needed
___Ensure Optional equipment as per sales order is installed and functioning.
Revision: 1.1
Honey Bee Manufacturing Ltd.
SDX Delivery Inspection Report
1 - SDX Pre Delivery Inspection
TO THE DEALER: This form must be completed and returned to Honey Bee Manufacturing Ltd. along with the Warranty Registration Form.
(please print)
Model: Serial #:
Check Completed By: Signature:
Dealer Name: Date:
(White - Return to Honey Bee) (Yellow - Dealer Copy) (Pink - Customer Copy)
Upon Receipt of Header:
As soon as you receive this machine, inspect it thoroughly to be certain that it is in good order and complete. Finish a pre-delivery
inspection, paying special attention to the steps listed below, prior to delivery to the customer. Indicate with a tick mark in the left-hand
column when correct/complete.
Refer to the page numbers listed below in the operator manual for detailed instructions.
Before Transporting:
___Tilt cylinder retracted.
___Drive shafts in storage position. - page 129
___Header in rigid mode (air system pressurized to 100 psi). - page 64
___Hydraulic & electrical connectors/lines in storage positions.
___Reel lowered, retracted, tied down and prevented from rotating.
___Transport cart & front draw bar axle properly installed. - page 128
___Automatix Lite display and electrical harness, dividers, extensions & accessories securely stored.
___Warning lights, decals, reectors & signs all legible and in place. - page 27
___Front reel ngers dropped into transport position. - page 127