7-Segment Display
Operation
State 0 When power supply is turned on at startup, hot gas valve energizes. After 30 seconds, State 1 starts.
State 1 After compressor energizes at startup or freeze cycle ends, water tank opens until cam switch detects cam location while water is supplied for harvest cycle.
If evaporator has no ice, water plate switch turns off, compressor keeps running, and water tank fully opens.
* The above operation is also made at high ambient temperatures where ice is easy to harvest.
State 2 If freeze c
cle ends and eva
orator has ice, water tank o
ens until cam switch detects cam location, but water
late does not se
arate, and actuator moto
and compressor de-energize (*1).
State 3 When water plate switch turns off, inlet water valve de-energizes and water tank starts to open again.
If water temperature is 55.4°F (13°C) or higher, water tank starts to open again in 1 minute (*2).
If water temperature is lower than 55.4°F (13°C), water tank starts to open again in 5 minutes (*2). --- Water temperature is
lower than 55.4°F (13°C) in initial cycle after startup.
However, if water plate switch turns off within 1 or 5 minute(s), water tank starts to open again.
* When water
late switch or cam switch turns off, water tank starts to o
en a
ain
State 4 When water tank opens and actuator motor's internal position sensor indicates water tank is fully open, hot gas valve energizes.
When 5 minutes have passed after compressor de-energizes in State 2 and actuator motor's internal position sensor indicates water tank is fully open,
compressor energizes (*3).
State 5 When evaporator thermistor temperature reaches harvest cycle termination temperature, water tank starts to close and inlet water valve energizes to start
water supply. Fan motor energizes at the same time.
State 6 When water tank closes and actuator motor's internal position sensor indicates water tank is fully closed, pump motor energizes, and inlet water valve and hot
gas valve energizes for 15 seconds.
State 7 After 15 seconds, inlet water valve and hot gas valve de-energizes to start freeze cycle.
State 8 When evaporator thermistor reaches target integrated value, State 1 starts (see details).
Harvest Cycle - Bin Control (1): Bin control while water tank is closing
State 5 Bin control trips while water tank is closing. After 10 seconds, water tank starts to open again, and actuator motor's internal position sensor indicates water tank is fully open. Then, icemaker shuts down.
(When bin control is ON for 10 seconds, inlet water valve de-energizes. Then, after water tank fully opens, compressor and hot gas valve de-energize.)
When bin control is ON for 50 seconds, hot gas valve energizes. When bin control is ON for 80 seconds, State 5 in harvest cycle - normal starts followed by freeze cycle.
Harvest Cycle - Bin Control (2): Bin control after water tank opens
State 5 Water tank opens and actuator motor's internal position sensor indicates water tank is fully open. When bin control trips, water tank does not close even if harvest cycle termination temperature is reached.
After 10 seconds, icemaker shuts down.
When bin control is ON for 50 seconds, hot gas valve energizes. When bin control is ON for 80 seconds, State 5 in harvest cycle - normal starts followed by freeze cycle.
Freeze Cycle Termination
Rate
Evaporator Thermistor
Temp.
Bin Control Switch
Inlet Water Valve
Actuator Motor
Close
OFF
Open
Hot Gas Valve
Pump Motor
Fan Motor
34 5
Water Plate Switch
Cam Switch
Compressor 30 sec
Harvest Cycle - Bin Control (2)
0 3 5 3 4 5 34 5
Startup Initial Cycle Freeze Cycle Harvest Cycle - Normal Freeze Cycle Harvest Cycle - Bin Control (1)
Freeze Cycle Termination Temp.
Harvest Cycle Termination Temp.
32°F(0°C)
*3 *3 *3
10 sec 10 sec
80 sec
50 sec
80 sec
50 sec
1) Target integrated value for freeze cycle termination is determined by
CB Settings 2 and 3.
2) After evaporator thermistor senses 32°F (0°C), freeze cycle termination
temperature and freeze cycle termination time are integrated ev
3) When target integrated value is reached, freeze cycle ends.
State 8 (details)
IM-50BAA-Q