
4
3Installation Preparations
1. Prepare installation tools based on site requirements.
2. Prepare materials.
This type of materials is provided by Huawei,
and you can find them in the fittings delivered
with the equipment.
Materials in the packing list
Customers can purchase this type of materials
from Huawei or other vendors.
Refrigerant, pipe component,
and
Purchased from Huawei based on application
scenarios.
Low temperature component
and T/H sensor
Engineering
purchase material
This type of materials is not configured by
Huawei. Customers need to prepare by
themselves.
Drainpipe, pipe support, and
base
Gas pipe: R410A copper pipe; outer diameter: 7/8 in. (22.22 mm), wall thickness:
1.2 mm, operating pressure: ≥ 4.5
Liquid pipe: R410A copper pipe; wall thickness: 1.0 mm, operating pressure: ≥ 4.5
MPa
L ≤ 60 m: outer diameter of 5/8 in. (15.88 mm)
60 m < L ≤ 100 m: outer diameter of 3/4 in. (19.05 mm), connected using a
copper pipe reducer
Thermal insulation foam: thickness ≥ 9.2 mm
Oil trap, inverted trap, and pipe support
Humidifier water inlet pipe:
Rigid pipe connection: G 1/2 in. rigid pipe connector with external threads,
rigid pipe (such as PP-R pipe)
Hose connection: G 1/2 in. pagoda connector with external threads, hose (such
Rigid pipe connection: BSPT
1/2 in. rigid pipe connector with external threads,
rigid pipe (such as PP-R pipe)
Hose connection: BSPT 1/2 in. pagoda connector with external threads, hose
(such as EPDM pipe)
Thermal insulation foam: thickness ≥ 9.2 mm
Equipotential ground cable: 16 mm2outdoor copper cable
Indoor unit power cable: 5 x 10 mm2outdoor copper cable
Outdoor unit power cable: 5 x 2.5 mm2outdoor copper cable (The neutral
wire is not used and must be insulated.)
(Optional) Power cable for the low temperature component: 2 x 1.5 mm2
outdoor copper cable
(Optional) Signal cable (using the RS485 communications cable of the outdoor
unit (52273539) as an example): 3 x 1.5 mm2shielded outdoor cable
(Optional) Temperature and humidity (T/H) sensor cable, teamwork control
cable, and monitoring communications cable: CAT 5e or higher shielded
network cable
Prepare the base for the indoor unit, the support or concrete base for the outdoor
unit, and the concrete base for the low temperature component based on the
scenario.