manuals.online logo
Brands
  1. Home
  2. •
  3. Brands
  4. •
  5. Hydro International
  6. •
  7. Water Filtration System
  8. •
  9. Hydro International Up-Flo User manual

Hydro International Up-Flo User manual

Other manuals for Up-Flo

1

Other Hydro International Water Filtration System manuals

Hydro International Up-Flo User manual

Hydro International

Hydro International Up-Flo User manual

Hydro International Downstream Defender 4-FT User manual

Hydro International

Hydro International Downstream Defender 4-FT User manual

Hydro International First Defense User manual

Hydro International

Hydro International First Defense User manual

Hydro International Hydro-Sludge Screen User manual

Hydro International

Hydro International Hydro-Sludge Screen User manual

Popular Water Filtration System manuals by other brands

Atlantic Ultraviolet Mighty Pure MP16A owner's manual

Atlantic Ultraviolet

Atlantic Ultraviolet Mighty Pure MP16A owner's manual

SunSun CBG-500 Operation manual

SunSun

SunSun CBG-500 Operation manual

Hayward XStream Filtration Series owner's manual

Hayward

Hayward XStream Filtration Series owner's manual

Contech DownSpout StormFilter Operation and maintenance

Contech

Contech DownSpout StormFilter Operation and maintenance

Teka Airfilter MINI operating instructions

Teka

Teka Airfilter MINI operating instructions

Wisy LineAir 100 Installation and operating instructions

Wisy

Wisy LineAir 100 Installation and operating instructions

Schaffner Ecosine FN3446 Series User and installation manual

Schaffner

Schaffner Ecosine FN3446 Series User and installation manual

Pentair FLECK 4600 SXT Installer manual

Pentair

Pentair FLECK 4600 SXT Installer manual

H2O International H20-500 product manual

H2O International

H2O International H20-500 product manual

Renkforce 2306241 operating instructions

Renkforce

Renkforce 2306241 operating instructions

Neo-Pure TL3-A502 manual

Neo-Pure

Neo-Pure TL3-A502 manual

STA-RITE VERTICAL GRID DE FILTERS S7D75 owner's manual

STA-RITE

STA-RITE VERTICAL GRID DE FILTERS S7D75 owner's manual

Applied Membranes W-G844EM Operation and maintenance manual

Applied Membranes

Applied Membranes W-G844EM Operation and maintenance manual

BEGA 116 Instructions for use

BEGA

BEGA 116 Instructions for use

WATA Standard operating instructions

WATA

WATA Standard operating instructions

Price FFU series Installation and service manual

Price

Price FFU series Installation and service manual

Gaggenau BRITA INTENZA 467873 manual

Gaggenau

Gaggenau BRITA INTENZA 467873 manual

Brita SAFF-100 user guide

Brita

Brita SAFF-100 user guide

manuals.online logo
manuals.online logoBrands
  • About & Mission
  • Contact us
  • Privacy Policy
  • Terms and Conditions

Copyright 2025 Manuals.Online. All Rights Reserved.

Up-Flo®Filter Operation and Maintenance Manual
Operation and Maintenance Manual
Up-Flo® Filter
Filtration System for Stormwater Treatment
Stormwater Solutions
94 Hutchins Drive
Portland, ME 04102
Tel: (207) 756-6200
Fax: (207) 756-6212
[email protected]
www.hydro-int.com
Up-Flo®Filter Operation and Maintenance Manual
3 Up-Flo®Filter
- Overview
- General Product Description
 
- Maintenance Services
4 Operation
- Introduction
- Pollutant Capture
 
 
- Best Practices

5 Inspection & Maintenance
- Overview
 
- Inspection
 
 
- Solids Disposal
13 Up-Flo®
14 Up-Flo®
16 Up-Flo®

COPYRIGHT STATEMENT:



Hydro International plc. Up-Flo®®
DISCLAIMER:                     
International plc’s Up-Flo®

IMPORTANT -  IMPORTANT


󰀩

Phone: 207-756-6200
Fax: 207-756-6212
Email: [email protected]

Up-Flo®Filter Operation and Maintenance Manual

󰀨󰀩
󰀨


®



A. Inlet Pipe
B. 
C. Filter Module
D. 
E. Bypass Hood/Siphon
F. Outlet Module
G. Outlet pipe
H. 
B
A
BF
G
D
C
E
a. Manhole 
Fig.2 The Up-Flo®®
Filter.

Fig.1 The Up-Flo®Filter - Media Filtration

Up-Flo®Filter Operation and Maintenance Manual
Fig.3 The Up-Flo®Filter - Ribbon Filtration

The Up-Flo®



The Up-Flo®
Fig.1󰀪


®

󰀨

®

®
󰀩
ensures optimal performance of the system.

Up-Flo®Filter Operation and Maintenance Manual


The Up-Flo®󰀨
®Filter.
®vessel and those that are performed



®vessel.
The Up-Flo®Fig.3).

®Filter vessel
is required
Fig.3.









The minimum required frequency for replacement of the
Media Ribbon is annually, whereas the minimum required
frequency for removal of accumulated sediment from the
sump is dependent on the Up-Flo®  
       
module will require less frequent removal of accumulated
       
         
removal is required.
Up-Flo®Filter Operation and Maintenance Manual




Up-Flo®Filter and its components prior to inspection.
   

®

• 



• 󰀩

• 
• 
• ®)
• Hydro International Up-Flo®
• 

         󰀩  
provide access to the Up-Flo®Filter. Safety equipment should notify
󰀩
2. Re
 



            

 ®, measure the depth
of sediment that has collected in the sump of the vessel.
Maximum sediment depth is 16 inches (41 cm).
 -


7. 

removed, and the depth of sediment measured. Also note any appar-
         

 
9. Remove safety equipment.
 -

 

Up-Flo®Filter Operation and Maintenance Manual
 


• Activities Not Requiring®Filter

removal of sediment from the sump.
• Activities Requiring®Filter

 ®



      

-
ment from the sump, and to dewater the vessel for replacement of


Completion of all the maintenance activities for a typical 4-ft (1.2m)
        -
3(0.5 m3) of sediment
           


International.



removal of sediment from the sump.

• 

• 



• 󰀩
• 
• 
• ®)
• 
• 
• Hydro International Up-Flo®

 󰀩®Filter. Safety equipment should
󰀩


4. 
3(0.2 m3
manhole Up-Flo®
5. Retract the vactor hose from the vessel.







Up-Flo®Filter Operation and Maintenance Manual

• 󰀩
• 
• Pole 
done with vactor hose)
• ®)
• 
• 
• Up-Flo®Filt
Hydro International)
• Hydro International Up-Flo®
• 



Up-Flo®Filter 

 

4

• NOTE:


.


7. Exit the Up-Flo®
__or lid.



•          

9. Remove safety equipment.
10. 






The access port located at the top of the manhole or vault provides access to the Up-Flo®vessel for maintenance personnel to enter the

®-

inside the vessel.
Up-Flo®Filter Operation and Maintenance Manual

Activity Frequency
Inspection 

 - Twice per year or as needed

Sediment Removal
®



- Once per year

activated after two consecutive storms




     


disposal requirements.

Up-Flo®Filter Operation and Maintenance Manual

®
®FILTER LOCATION:
SITE NAME:
SITE LOCATION:
OWNER: SITE CONTRACTOR:
CONTACT NAME: CONTACT NAME:
COMPANY NAME: COMPANY NAME:
ADDRESS: ADDRESS:
TELEPHONE: TELEPHONE:
FAX: FAX:

  
®
Hydro International (Stormwater), 94 Hutchins Drive, Portland ME 04102
