
This guide is non specific to timber or concrete floors, it may refer to timber floors but in general the process of installation is the same
regardless of floor type. In both cases great care must be taken when either lifting floor board or excavating the floor for waste installation.
Concrete floors, excavate suficient
concrete to install trap and waste pipe.
Measure and cut the required length of fabric tile
up-stand. The length will be the determned by measuirng
the sides of the tray the are against a wall.
Place the tray in the desired location and mark position
of shower trap.
Using a suitable saw, remove enough floor boards to
receive the shower trap and any drainage pipework.
Use extreme care whilst cutting the floor as there
may be hidden pipes and cables.
Position the trap so that it aligns with the hole in the
shower tray and connect it to the waste pipe. Remove
internal parts of the trap and place to one side, as
they will be required later.
Mantis Shower Tray
Installation Guide
Do not stretch as you apply.
3. 4.
5.
2.
6.
1.
Determine which corner the tray is to be fitted into.
This will establish which edges the fabric up stand
will be attached to.
First remove the backing paper. Carefully position against
the tray and press firmly into place ensuring there are no
bubbles or creases.
We recommend using a roller to do this.
Page 2