manuals.online logo
Brands
  1. Home
  2. •
  3. Brands
  4. •
  5. Isimet
  6. •
  7. Controllers
  8. •
  9. Isimet LA User manual

Isimet LA User manual

ISIMET LA / LSP - CONTROLLER MAINTENANCE CHECKLIST
VERIFY THAT ALL MAINTENANCE PROCEDURES HAVE BEEN PERFORMED.
Refer to pcb Configuration Chart, Maintenance Slide & Maintenance Guide for Instructions in performing these tests.
Maintenance Instruction:
Maintenance should be performed only by a qualified service technician. ISIMET recommends that testing be
performed at least every six months, but always prior to utilizing the system when it has been left dormant or not
used for an extended period. Additionally, at least annually, service all solenoids following the recommended
procedures in the Solenoid Slide Presentation.
The start-up tests as described in the Product Operation & Maintenance Manuals and Slide Presentations should be
conducted periodically to insure that the control system operates as intended. Input and output interface is an
available option. Therefor, testing for proper interface between the input devices and automation systems, and
output notification monitoring devices and automation systems should be conducted to verify communication
between the Controller and these devices and integrated automation systems.
The output operators should be tested for correct voltage, amperage, and registered ohms. Ohms should be
registered using either an analog or digital meter with power OFF to the unit. So that the intended safety provided
for by optimum performance of the system, the proper operation of these operators should be periodically tested
and verified.
Complete the test summary on page two and the checklist found on page three for each independent control system.
A typical test sheet is provided on page four as an example and where system configuration and performance
matches this example, then it may be used as the completed test sheet. If using the example for test reporting and
where an specific application noted on the report does not apply to the tested system, strike through that portion of
the report.
If testing indicates that a component is failing or no longer operates as intended then that device should be repaired
or replaced immediately. If the communication test fails between the Controller and either a remote monitor or
system then steps should be taken immediately to determine the cause of this failure and then make needed repairs.
Warranty - Liability Criteria:
During the terms of warranty, the testing should be performed and transmitted to ISIMET by fax, e-mail or mail.
ISIMET does not warrant against or assume liability for failure of operation or lack of notification to secondary
integrated monitoring systems. Warranty excludes Solenoids or Electrical Contacts other than those provided by
ISIMET.
DOC# 13004
March 2014
Please mail, e-mail or fax the
Summary & Report Sheets to:
ISIMET, LLC
P.O. Box 129
Naples, TX 75568
Fax: (903) 897-0740
Customerservice@ISIMET.com
Service Technician
__________________________________________
Company
__________________________________________
Print Name
_________________________________________
Signature
______________
Date
Issue Date March 2014
Periodic Maintenance Checklist Summary
date of testing
______________
Site ______________________________________________
_____________________________________________________________________________________________
(full name & address)
All output circuits operate in correspondence with panel switches ? _______
All monitoring systems or devices function and receive signaling from the Controller ? ___________
Operators (solenoids and contacts) were provided by ISIMET ? ___________
Number of ISIMET LA Controllers tested during this maintenance procedure: ____________
Units are Style: Independent _______ Single source _________ Companion _________
Number of ISIMET LSP Controllers tested during this maintenance procedure: ____________
Number of ISIMET Solenoids or S-Series Enclosures: ____________
Number of ISIMET E-Series Enclosures: ____________
Number of ISIMET operators or monitoring devices included in all tested systems: ____________
Comments:
By signing this Report Summary, I certify that all tests as indicated in test pages ____ of ______ pages has been performed and
that results of tests are true and accurate. Further, failures of systems or components as indicated on these reports have been
resoled so as to not violate the operating integrity of the system.
Input Integration
Model # _______________ Serial # ____________ Location __________________ Date ________ page ____ of _____ pages
Function
Applied
Y/N
Voltage
5-vdc/24-v
Termination
point
pcb-Jumper
- Y/N
post config.
L/R
Functional
Y/N
Signal-IN
Y/N
Comments
“ems”
Con 4-C
JP-2
JP-2-A
alarm
Con 4-B
JP-1
Isolated “panic”
Aux. “panic”
Con 4-A
Emerg. Shower
Per O & M
Gas Sensors
Per O & M
Alarm Output
Con 5-A-B
JP-3
Note: Jumpers are required @ JP locations when input voltages are 5-vdc. Remove jumpers when input = 24 vac.
Termination points: Refer to Product Operation & Maintenance Manuals for connection points.
Output Circuit Function
Output
Circuit
Utility /
Service
Normal
ON/OFF
Key
ON/OFF
W/switch
ON
W/panic
OFF
W/panic
OFF
W/alarm
OFF
W/ems
Output
Voltage
ON
Transient
Voltage-
OFF
Ohms
Ω
Amps
pcb
LED’s
Panel
LED’s
CIR 1
CIR 2
Solenoid Test: LSP Units only
Solenoid coils adhere to specified ratings? ___________ Solenoid diaphragm has been examined and cleaned? ______________

This manual suits for next models

1

Other Isimet Controllers manuals

Isimet RLA-2 Installation manual

Isimet

Isimet RLA-2 Installation manual

Isimet KLA User manual

Isimet

Isimet KLA User manual

Isimet DLA Series Installation manual

Isimet

Isimet DLA Series Installation manual

Isimet LA Series Installation manual

Isimet

Isimet LA Series Installation manual

Isimet DLA Series Style 2 Installation manual

Isimet

Isimet DLA Series Style 2 Installation manual

Isimet RLA-1 User manual

Isimet

Isimet RLA-1 User manual

Popular Controllers manuals by other brands

Johnson Controls PENN P70 Series Product/Technical Bulletin

Johnson Controls

Johnson Controls PENN P70 Series Product/Technical Bulletin

Aveo MiraConnect user guide

Aveo

Aveo MiraConnect user guide

Weir Hopkinsons Fig 9050 Standard Operating & Maintenance Instructions

Weir

Weir Hopkinsons Fig 9050 Standard Operating & Maintenance Instructions

NEXTTEQ CBA instruction manual

NEXTTEQ

NEXTTEQ CBA instruction manual

Frigicoll AHUKZ-01B Installation & owner's manual

Frigicoll

Frigicoll AHUKZ-01B Installation & owner's manual

Niko 310-01100 manual

Niko

Niko 310-01100 manual

Velleman vellight CHLSC4 installation instructions

Velleman

Velleman vellight CHLSC4 installation instructions

Anton Paar Pico 3000 RC reference guide

Anton Paar

Anton Paar Pico 3000 RC reference guide

BARIX Barionet 1000 Quick install guide

BARIX

BARIX Barionet 1000 Quick install guide

Omron CK3M-CPU 1 Series Application guide

Omron

Omron CK3M-CPU 1 Series Application guide

ShowLed CONBOX quick start guide

ShowLed

ShowLed CONBOX quick start guide

ComAp IG-NT reference guide

ComAp

ComAp IG-NT reference guide

Jung FMST50UP operating instructions

Jung

Jung FMST50UP operating instructions

PowerTech LL00233 instruction manual

PowerTech

PowerTech LL00233 instruction manual

ABB C250 user guide

ABB

ABB C250 user guide

Apeks XL4 SECOND STAGE Maintenance manual

Apeks

Apeks XL4 SECOND STAGE Maintenance manual

Texas Instruments TMS320C6000 DSP reference guide

Texas Instruments

Texas Instruments TMS320C6000 DSP reference guide

BW Technologies Rig Rat III user manual

BW Technologies

BW Technologies Rig Rat III user manual

manuals.online logo
manuals.online logoBrands
  • About & Mission
  • Contact us
  • Privacy Policy
  • Terms and Conditions

Copyright 2025 Manuals.Online. All Rights Reserved.