manuals.online logo
Brands
  1. Home
  2. •
  3. Brands
  4. •
  5. ITT
  6. •
  7. Controllers
  8. •
  9. ITT Bell & Gossett ZoneTrol II Z-1 Manual

ITT Bell & Gossett ZoneTrol II Z-1 Manual

This manual suits for next models

2

Other ITT Controllers manuals

ITT Conoflow GB50 Series Instructions for use

ITT

ITT Conoflow GB50 Series Instructions for use

ITT Advantage 2.0 User manual

ITT

ITT Advantage 2.0 User manual

ITT Hydrovar Installation and operating instructions

ITT

ITT Hydrovar Installation and operating instructions

ITT Advantage Actuator 2.0 User manual

ITT

ITT Advantage Actuator 2.0 User manual

ITT GFH45 Instructions for use

ITT

ITT GFH45 Instructions for use

ITT Engineered Valves Advantage 2.1 User manual

ITT

ITT Engineered Valves Advantage 2.1 User manual

ITT GFH20XT1767C Instructions for use

ITT

ITT GFH20XT1767C Instructions for use

ITT Engineered Valves Advantage 2.1 8 Series User manual

ITT

ITT Engineered Valves Advantage 2.1 8 Series User manual

ITT Lowara GENYO 16A / R15-25 User manual

ITT

ITT Lowara GENYO 16A / R15-25 User manual

ITT McDonnell & Miller PS-802 Series Installation and operating instructions

ITT

ITT McDonnell & Miller PS-802 Series Installation and operating instructions

ITT Goulds Pumps AquaBoost II 3 HP Owner's manual

ITT

ITT Goulds Pumps AquaBoost II 3 HP Owner's manual

ITT Conoflow HP400 Instructions for use

ITT

ITT Conoflow HP400 Instructions for use

ITT Bell & Gossett ZoneTrol II Z-2 Manual

ITT

ITT Bell & Gossett ZoneTrol II Z-2 Manual

ITT Conoflow GB 2800 Instructions for use

ITT

ITT Conoflow GB 2800 Instructions for use

Popular Controllers manuals by other brands

Sunricher SR-ZV9003T3-RGBW-US Installation

Sunricher

Sunricher SR-ZV9003T3-RGBW-US Installation

Ksenia intro Installation and configuration manual

Ksenia

Ksenia intro Installation and configuration manual

Inovance CAN200 Series manual

Inovance

Inovance CAN200 Series manual

Gauzy LC6 FLEX Controller Installation and operation guide

Gauzy

Gauzy LC6 FLEX Controller Installation and operation guide

Viking SLP-1 Technical practice

Viking

Viking SLP-1 Technical practice

CKD KBX-30E-U Series instruction manual

CKD

CKD KBX-30E-U Series instruction manual

Sharp Energy Sun Flux User manual & installation guide

Sharp Energy

Sharp Energy Sun Flux User manual & installation guide

Yamaha RCX40 user manual

Yamaha

Yamaha RCX40 user manual

AB Quality PowerFlex 400 Frames D-H Service bulletin

AB Quality

AB Quality PowerFlex 400 Frames D-H Service bulletin

Yamaha MJC8 owner's manual

Yamaha

Yamaha MJC8 owner's manual

AL-KO ATC operating instructions

AL-KO

AL-KO ATC operating instructions

Savant SmartControl 2 Deployment guide

Savant

Savant SmartControl 2 Deployment guide

GameSir T3S user manual

GameSir

GameSir T3S user manual

Kostal inveor operating manual

Kostal

Kostal inveor operating manual

Emerson Yarway 20-55 Operating and safety instructions

Emerson

Emerson Yarway 20-55 Operating and safety instructions

CoCo ACM-LV24 Quick installation guide

CoCo

CoCo ACM-LV24 Quick installation guide

Brooks SLA5810/20 Installation and operation manual

Brooks

Brooks SLA5810/20 Installation and operation manual

SIGMA TEK SR 011 Technical manual

SIGMA TEK

SIGMA TEK SR 011 Technical manual

manuals.online logo
manuals.online logoBrands
  • About & Mission
  • Contact us
  • Privacy Policy
  • Terms and Conditions

Copyright 2025 Manuals.Online. All Rights Reserved.

ELECTRICAL INSTALLATION
INSTRUCTIONS
1. Disconnect the electrical supply to the pump before
installing the controller.
2. Refer to the applicable wiring diagram
- Figure 1: Cold Start Boiler
- Figure 2: Tankless Coil
3. Verify that the circulator(s) do not exceed the electrical rat-
ing of the controller.
4. Make electrical connections according to the applicable
wiring diagram. Run the pump power through the holes in
the controller chassis to the applicable /N terminals. Keep
120 VAC and 24 VAC wiring separate. All 120 VAC wiring
should be 14 AWG (minimum) copper electrical. Perform all
wiring in accordance with applicable codes.
5. Run the thermostat wires through the grommet(s) in the
controller chassis and connect to the appropriate R/W ter-
minals. Keep 24 VAC wiring separate from 120 VAC wiring.
DESCRIPTION
The Bell & Gossett ZoneTrol II and McDonnell & Miller Zone-
Smart Pump Controllers are designed to control 120 VAC
circulating pumps in hydronic systems.
Max.
T-stat Number of Max.
Model Current Zones HP/Pump
Z-1 / ZS-1 0.085 1 1/3
LED DEFINITION
Power ED will illuminate when input power is applied to the
controller. Zone ED will illuminate when relay is energized.
MECHANICAL INSTALLATION
INSTRUCTIONS
The pump controller should be securely mounted on a wall
near the pumps using four #8 screws (not included).
Installation, Operation and Service Instructions
Bell & Gossett®ZoneTrol II™
Model Z-1
McDonnell & Miller ZoneSmart™
Model ZS-1
SAFET
INSTRUCTION
This safety alert symbol will be used in this manual and on the
unit safety instructions decal to draw attention to safety related
instructions. When used, the safety alert symbol means ATTEN-
TION! BECOME ALERT! OUR SAFET IS INVOLVED!
FAILURE TO FOLLOW THE INSTRUCTIONS MA RESULT
IN A SAFET HAZARD.
INSTALLER: P EASE EAVE THIS MANUA FOR THE OWNER’S USE.
Instruction Manual 210711
REVISION A1
WARNING: Electrical Shock Hazard
Electrical connections are to be made by a qualified
electrician in accordance with all applicable codes, ordi-
nances and good practices Disconnect and lock out the
power before making electrical connections. Failure to fol-
low these instructions could result in serious personal injury
and/or death.
WARNING: Electrical Shock Hazard
When wiring per the Tankless Coil Application, pump
controller and boiler aquastat must be on the same circuit
and have a common disconnect. Failure to follow these
instructions may introduce a secondary source of power
resulting in personal injury or death.
UL
®
CUS
LISTED
ITT
8200 N. Austin Avenue
Morton Grove, I 60053
Phone: (847) 966-3700
Fax: (847) 966-9052
www.bellgossett.com
www.mcdonnellmiller.com
© COPYRIGHT 2007 BY
ITT CORPORATION
PRINTED IN U.S.A. 9-07
THE ITT ENGINEERED B OCKS SYMBO AND
ENGINEERED FOR IFE ARE REGISTERED
TRADEMARKS OF ITT CORPORATION
}
}
To TT on boiler
To
circulator
Input
Power
120/1/60
Factory
Installed
Jumper
6
NO
56
NC 4
NC 4
NO 3HNG
}
}To
thermostat
T/W T/RC
To ZC
To
circulator
}
}Input
Power
120/1/60
Remove
Factory
Installed
Jumper
6
NO 6
NC 4
NC 4
NO 3HNG5
T PICAL WIRING SCHEMATICS
Thermostat Wiring
Figure 1: Cold Start Boiler
When a thermostat calls for heat, the corresponding
circulator will start and the 5-6 NO end switch will
close to enable the boiler.
Figure 2: Tankless Coil (Remove Jumper)
When a thermostat calls for heat, the corresponding
circulator will start when the boiler temperature
reaches the low limit setting