
1. 6 support posts and screws
2. 2 Finish Bolts/Washers
3. Retrofit mounting plate if 2 1/8” hole
4. Spindle and spring
5. Battery mounting plate
6. 2 trim screws for battery cover
7. Battery cover
8. Battery pack
9. Allen wrench
10. Classroom mode driver (optional)
11. Dual wires for dry contact (optional)
Prep Lock for Install
Screw in 5 support posts into the keypad side backplate.
Prep Door for 7i-PK Install
Using the drilling template, prep your door to fit the 7i-PK mounting hole requirements. Door
pictured here was previously fitted with a lever and deadbolt, so a cover plate will be utilized to
cover old cross bore holes.