Launch TLT235SBA User manual

LAUNCH
TLT235SBA/TLT240SBA
TLT235SBA(E)
TLT240SCA/TLT235SCA(U)
Electronic Two Post Lift User’s
Manual
(C) Diagtools; www.diagtools.eu; [email protected]; Pernavas 43A, Riga, Latvia, LV-1009; +37129416069

LAUNCH Electronic Two-post User’
s Manual
i
Copyright reserved! Without the written agreement of
Launch Shanghai Machinery Co., Ltd. (hereinafter called
“Launch ), no company or individual is allowed to copy and
backup this manual in any form (electronic, mechanical,
photocopy, recording or other forms). This manual is
specifically designed for the use of Launch product, and
our company doesn’t undertake any responsibility for
various consequences caused as a result of applying it to
the guidance of operating other equipment.
In case of the equipment damage or loss due to the
accident of the user himself or third party, abuse or misuse
of this equipment, unauthorized change and repair of this
equipment, or not conforming to the operation and
maintenance requirement of Launch, Launch and its
branches won’t undertake any responsibility for the
expenses and expenditures generated.
For the equipment damage or problem caused as a result
of using other optional accessories or consumables instead
of original Launch product or its recognized product,
Launch won’t undertake any responsibility.
Official statement: The purpose of other- product- names
mentioned in this manual is to describe how to use this
equipment. Their registered trademarks still belong to the
original companies.
This equipment is for the use of professional technical
personnel or maintenance personnel.
Registered Trademark
Launch has registered its trademark in China and several
foreign countries, with the symbol of LAUNCH. Other
trademarks, service symbol, domain name, icon, and
company name of Launch mentioned in this manual belong
to the property of Launch and its subsidiary companies. In
the countries where Launch’s trademark, service symbol,
domain name, icon and company name haven’t been
registered, Launch declares its ownership on such
unregistered trademark, service symbol, domain name,
icon and company name. The trademarks of other products
and company names mentioned in this manual still belong
to the originally registered companies. Without prior written
agreement of the owner, nobody can use the trademark,
service symbol, domain name, icon and company name of
Launch and other companies mentioned in this manual. If
you have any question, please visit website of Launch:
http://www.cnlaunch.com or write to Sales Dept. of Launch
Shanghai Machinery Co., Ltd. at No. 661 Baian Road,
International Automobile City Auxiliary Parts Park, Anting
Town, Jiading District, Shanghai City to contact Launch.
Insured by PICC
(C) Diagtools; www.diagtools.eu; [email protected]; Pernavas 43A, Riga, Latvia, LV-1009; +37129416069

LAUNCH Electronic Two-post User’
s Manual
ii
WARNING
This instruction manual is an essential integral part of
this product. Please read all instructions.
Properly keep this manual for use during the
maintenance.
Use only as described in this manual. Use only
manufacturer’s recommended adapters.
This equipment is only used for its clearly designed
purpose, and never use it for other purposes.
The manufacturer is not responsible for any damage
caused by improper use or other purposes of use.
PRECAUTION
Only the qualified personnel having undergone
special training can operate this machine. Without the
permission of the manufacturer or not following the
requirement of the manual, any changes in the
machine part and in the usage scope may cause
direct or indirect damage to the machine.
Don’t keep the lift in the extreme temperature and
humidity environment. Avoid installation beside the
heating equipment, water tap, air humidifier or stove.
Prevent the lift from contacting large amount of dust,
ammonia, alcohol, thinner or spray adhesive, and
prevent it from rain shower.
During the machine operation, non-operators should
be kept away from the machine.
Inspect machine daily ,do not use lift with damaged
parts or being damaged .Use original components to
replace damaged parts
The lift can’t be overloaded. The rated load of the lift
is already marked on the nameplate.
Please don’t raise the lift when there are people in the
vehicle. During the operation, the customer and
spectators shouldn’t stand in the lifting area.
Keep the lifting area free from obstacle, grease,
machine oil, garbage and other impurities.
Position the swing arm of the lift, making it contact the
lifting point as recommended by the manufacturer.
Raise the carriage and confirm the lifting pad and
vehicle are closely contacted. Raise the carriage to
the appropriate working height.
For some vehicles, the parts dismantling (or
installation) will cause severe deviation of the center
of gravity, leading to unstable vehicle. The support is
needed to keep the balance of the vehicle.
Before moving the vehicle away from the lifting area,
please position the swing arm and lifting pad back
away to avoid blockage during the movement.
Use appropriate equipment and tools as well as
safety protection facilities, e.g. working uniform, safety
boot, etc.
Pay special attention to various safety marks attached
to the machine body.
Keep hair, loose clothing, fingers, and all parts of
body away form moving parts
Pay special attention not to dismantling the safety unit
of the machine or making it not functioning.
The hydraulic oil used for this lift is N32 or N46.
Please refer the safety data of grease and oil shown
in the manual.
Let components cool down before storage, loosen
component cables completely in storage
Do not install lift in the open air or expose to
rain ,special requirements should be offered to
manufacturer if it can’t be avoided.
Carefully check equipment list before
installation .Immediately connect distributor or Launch
for any question.
Launch Shanghai Machinery Co., Ltd. is dedicated
to continuously improving the product quality and
upgrading the technical spec. They are subject to
change without notice.
(C) Diagtools; www.diagtools.eu; [email protected]; Pernavas 43A, Riga, Latvia, LV-1009; +37129416069

LAUNCH Electronic Two-post User’
s Manual
iii
Caution Labeling E emplification
(
1
)
Read operating and safety manuals before using
lift!
(
2
)
Proper maintenance and inspection is necessary for
safe operation!
(
3
)
Don not operate a damaged lift
!
(
4
)
Lift can be used by trained operators ONLY!
(
5
)
Only Authorized personnel can be in the lift area!
(
6
)
Use LAUNCH commend lifting points!
(
7
)
Use bracket to help disassembly or installation!
(
8
)
Auxiliary adapters would reduce load capacity!
(
9
)
Area should be unimpeded in case of vehicle
overturn!
(
10
)
The central of gravity should be between two arms!
(C) Diagtools; www.diagtools.eu; [email protected]; Pernavas 43A, Riga, Latvia, LV-1009; +37129416069

LAUNCH Electronic Two-post User’
s Manual
iv
(
11
)
Keep area clear when lifting and lowering machine!
(
12
)
Do not shake the vehicle on the lift !
(
13
)
Do not lift single side of vehicle!
(
14
)
Keep feet away when lowering lift!
(
15
)
Do not stand under carrying arms or other load
carrying device while lift is being operated with load!
(C) Diagtools; www.diagtools.eu; [email protected]; Pernavas 43A, Riga, Latvia, LV-1009; +37129416069

LAUNCH Electronic Two-post User’
s Manual
v
Table of Contents
1. OUTLINE.................................................................................................................1
1.1
M
ODEL
D
ESCRIPTION
.................................................................................................................................... 1
1.2
P
URPOSE
....................................................................................................................................................... 1
1.3
F
UNCTIONS AND
F
EATURES
.......................................................................................................................... 1
1.4
T
ECHNICAL
S
PECIFICATIONS
........................................................................................................................ 1
1.5
E
NVIRONMENTAL
R
EQUIREMENT
.................................................................................................................. 2
2. LIFT STRUCTURE..................................................................................................2
2.1
L
IFT STRUCTURES ARE SHOWN AS BELOW
:
::
:
............................................................................................... 2
2.2
M
AIN STRUCTURE PRINCIPLES
:..................................................................................................................... 8
3 OPERATION DESCRIPTION...................................................................................9
3.1
P
RECAUTIONS FOR VEHICLE REPAIR WORK
.................................................................................................. 9
3.2
P
REPARATION BEFORE
O
PERATION
............................................................................................................. 9
3.3
I
NSPECTION BEFORE OPERATION
.................................................................................................................. 9
3.4
L
IFTING THE
V
EHICLE
.................................................................................................................................. 10
3.5
L
OWERING THE
V
EHICLE
............................................................................................................................. 10
4 HYDRAULIC AND ELECTRICAL SYSTEM OF THE EQUIPMENT......................11
4.1
H
YDRAULIC
S
YSTEM OF THE
L
IFT
............................................................................................................... 11
4.2
E
LECTRICAL
S
YSTEM OF THE
L
IFT
............................................................................................................. 13
5.
..
.SOLUTIONS TO FAQ........................................................................................14
6. REPAIR AND MAINTENANCE.............................................................................15
7. STORAGE AND SCRAP ......................................................................................16
7.1
S
TORAGE
..................................................................................................................................................... 16
7.2
S
CRAP
.......................................................................................................................................................... 16
8. TOOLS FOR INSTALLATION AND ADJUSTMENT ............................................17
9. UNPACKING.........................................................................................................17
10. INSTALLATION ..................................................................................................17
10.1
I
MPORTANT NOTICE
................................................................................................................................... 17
10.2
I
NSTALLATION
P
ROCEDURE
...................................................................................................................... 17
10.2.1 Selecting installation site........................................................................................................................... 17
10.2.2 Base plate layout...................................................................................................................................... 18
10.2.3 Install the power side column..................................................................................................................... 21
10.2.4 Install the floor plate, top beam .................................................................................................................. 23
10.2.4.1 Install the floor plate............................................................................................................................... 23
10.2.4.2 Install the top beam ............................................................................................................................... 23
10.2. Install the offside column........................................................................................................................... 24
10.2.6 Install and adjust the balancing steel cables................................................................................................ 24
10.2.7 Install the power unit and hydraulic lines..................................................................................................... 26
(C) Diagtools; www.diagtools.eu; [email protected]; Pernavas 43A, Riga, Latvia, LV-1009; +37129416069

LAUNCH Electronic Two-post User’
s Manual
vi
10.2.8 Install the swing arm................................................................................................................................. 27
10.2.9 Install the electric control box..................................................................................................................... 28
10.2.10 Adjust the Steel chain ............................................................................................................................. 29
10.2.11 Install and adjust the electromagnet safety mechanism .............................................................................. 30
11. LIFT ADJUSTMENT ...........................................................................................31
11.1
P
REPARATION BEFORE THE ADJUSTMENT
............................................................................................................. 31
11.2
A
DJUSTMENT PROCEDURE
................................................................................................................................. 31
12 LIST OF THE LIFT COMPONENTS ....................................................................32
13. SAFETY RULES OF ELECTRICAL SYSTEM....................................................50
14 Packing…………………………………………………………………….51
GREASE AND HYDRAULIC OIL FOR LIFT ............................................................54
(C) Diagtools; www.diagtools.eu; [email protected]; Pernavas 43A, Riga, Latvia, LV-1009; +37129416069

LAUNCH Electronic Two-post User’
s Manual
1
1. Outline
1.1 Model Description
Model Description
TLT235SBA
floor-plate 2-post lift
3.5T Electronic symmetric floor-plate 2-post lift (Fig1a
、
Fig2a)
TLT240SBA
floor-plate 2-post lift
4.0T Electronic symmetric floor-plate 2-post lift (Fig1a
、
Fig2a)
TLT235SBA(E)
floor-plate 2-post lift
3.5T Electronic symmetric wide floor-plate 2-post lift(Fig1b
、
Fig2b)
TLT240SCA
clear-floor 2-post lift
4.0T Electronic clear-floor 2-post lift (Fig1c
、
Fig2c)
TLT235SCA(U)
clear-floor 2-post lift
3.5T Electronic clear-floor 2-post lift (Fig1d
、
Fig2d)
TLT240SBA
floor-plate 2-post lift
4.0T Electronic symmetric floor-plate 2-post lift (Fig1a
、
Fig2a)
1.2 Purpose
This machine is applicable for the lifting of various small
and medium-sized vehicles with total weight below 3.5t/4.0t
in garage and workshop.
1.3 Functions and Features
The cable and oil pipe are fully concealed, with
decent and elegant appearance.
Designed based on the international standard,
meeting the demand of the garage and workshop.
Electromagnetic full-scope high-safety lock.
Lowering electrically, safe and simple in operation.
Dual hydraulic cylinder and high strength chain drive,
stable lifting and lowering.
Cover for chain and chain wheel, protects safety of
vehicle repair personnel
.
Adopt two steel cables for equalization, force two
carriages to move synchronously, and effectively
prevent the vehicle from tilting.
Lowest height of lifting pad is 110mm, good for
repairing low chassis or low profile car.
1.4 Technical Specifications
Basic parameters of the equipment:
Model Rated
load
Lifting
height
Rising
time
Desce
nding
time
Net
weight
Passing
width
Machine
width
Machine
height
TLT235SBA
3500 kg
7875 lb
1850
mm
72.8 in
≤
50s
≥
20s
≤
40s
620 kg
1367 lb
2486 mm
97.9 in
3370 mm
132.7 in
2860 mm
112.6 in
TLT240SBA
4000 kg
9000 lb
1850
mm
72.8 in
≤
50s
≥
20s
≤
40s
655 kg
1444 lb
2486 mm
97.9 in
3370 mm
132.7 in
2860 mm
112.6 in
TLT235SBA(E)
3500 kg
7875 lb
1850
mm
72.8 in
≤
50s
≥
20s
≤
40s
735 kg
1620 lb
2486 mm
97.9 in
3400 mm
133.9 in
2900 mm
114.2 in
TLT240SCA
(
Symmetric
installation
)
2486 mm
97.9 in
3420 mm
134.6 in
TLT240SCA
(Asymmetric
installation)
4000 kg
9000 lb
1850
mm
72.8 in
≤
50s
≥
20s
≤
40s
700kg
1543 lb
2415 mm
95.1 in
3563mm
140.3 in
3840 mm
151.2 in
(C) Diagtools; www.diagtools.eu; [email protected]; Pernavas 43A, Riga, Latvia, LV-1009; +37129416069

LAUNCH Electronic Two-post User’
s Manual
2
TLT235SCA(U)
(Symmetric
installation)
2424 mm
95.4 in
3392 mm
133.5 in
TLT235SCA(U)
(Asymmetric
installation)
3500 kg
7875 lb
1850
mm
72.8 in
≤
50s
≥
20s
≤
40s
670kg
1477 lb
2378 mm
93.6 in
3544mm
139.5 in
3840 mm
151.2 in
Noise:
Working noise: ≤ 75dB
(
A
)
Power unit:
Working pressure: 16MPa (TLT235SBA)
16Mpa (TLT235SBA(E))
16Mpa(TLT235SCA(U))
18MPa
(
TLT240SBA
)
18MPa
(
TLT240SCA
)
1.5 Environmental Requirement
Working temperature
:
-5
℃~
+40
℃
Relative humidity: Temperature +30
℃,
relative humidity 80%
Transport/storage temperature
:
-5
℃~
+40
℃
Height above sea level
:
No more than
2000m
2. Lift Structure
2.1 Lift structures are shown as below:
::
:
Model Description
TLT235SBA
floor-plate 2-post lift
3.5T Electronic symmetric floor-plate 2-post lift (Fig1a
、
Fig2a)
TLT240SBA
floor-plate 2-post lift
4.0T Electronic symmetric floor-plate 2-post lift (Fig1a
、
Fig2a)
TLT235SBA(E)
floor-plate 2-post lift
3.5T Electronic symmetric wide floor-plate 2-post lift(Fig1b
、
Fig2b)
TLT240SCA
clear-floor 2-post lift
4.0T Electronic clear-floor 2-post lift (Fig1c
、
Fig2c)
TLT235SCA(U)
clear-floor 2-post lift
3.5T Electronic clear-floor 2-post lift (Fig1d
、
Fig2d)
Electrical parameters of the machine
:
::
:
Motor (optional)
Voltage
:
According to client’s requirement
Single phase: 110V/60Hz 2.2kW
;
220V/50Hz 2.2 kW
Single phase: 200V/60Hz 2.2 kW
Three phase 380V/50Hz 2.2 kW
(C) Diagtools; www.diagtools.eu; [email protected]; Pernavas 43A, Riga, Latvia, LV-1009; +37129416069

LAUNCH Electronic Two-post User’
s Manual
3
1
1
0
m
m
(
4
.
3
i
n
)
Control box
Electromagnet
Power unit
Offside column
Lifting pad
Carriage
Arm assembly
3370mm(132.7in)
2750mm(108.3in)
Powerside column
2
8
6
0
m
m
(
1
1
2
.
6
i
n
)
Fig 1a
Fig 1b
(C) Diagtools; www.diagtools.eu; [email protected]; Pernavas 43A, Riga, Latvia, LV-1009; +37129416069

LAUNCH Electronic Two-post User’
s Manual
4
3
8
4
0
m
m
(
1
5
1
.
2
i
n
)
m
i
n
=
1
1
0
m
m
(
4
.
3
i
n
)
Powerside column
Top beam
Offside column
Carriage
Arm assemblyLifting pad
Extension column
2750mm(108.3in)
3420mm(134.6in)
Control box
Electromagnet
Power unit
Fig 1c
Fig.1d
(C) Diagtools; www.diagtools.eu; [email protected]; Pernavas 43A, Riga, Latvia, LV-1009; +37129416069

LAUNCH Electronic Two-post User’
s Manual
5
Fig 2a
3
0
0
m
m
(
1
1
.
8
i
n
)
2
7
2
8
m
m
(
1
0
7
.
4
i
n
)
2586mm(101.8in)
Passing width 2486mm(97.9in)
Drive-in
direction
8
0
0
m
m
(
3
1
.
5
in)
1200mm
(47.2
in)
Fig 2b
(C) Diagtools; www.diagtools.eu; [email protected]; Pernavas 43A, Riga, Latvia, LV-1009; +37129416069

LAUNCH Electronic Two-post User’
s Manual
6
3420mm(134.6in)
Passing width 2486mm(97.9in)
Three-section arm
min=580mm(22.8in)
max=1120mm(44.1in)
T
w
o
-
s
e
c
t
i
o
n
a
r
m
m
i
n
=
8
5
5
m
m
(
3
3
.
7
i
n
)
m
a
x
=
1
3
6
5
m
m
(
5
3
.
7
i
n
)
Three-section arm
min=580mm(22.8in)
max=1120mm(44.1in)
T
w
o
-
s
e
c
t
i
o
n
a
r
m
m
i
n
=
8
5
5
m
m
(
3
3
.
7
i
n
)
m
a
x
=
1
3
6
5
m
m
(
5
3
.
7
i
n
)
3563mm(140.3in)
Passing width2415mm(95.1in)
Fig 2c
(C) Diagtools; www.diagtools.eu; [email protected]; Pernavas 43A, Riga, Latvia, LV-1009; +37129416069

LAUNCH Electronic Two-post User’
s Manual
7
3392mm(133.5in)
Passing width 2424mm(95.4in)
Three-section arm
min=580mm(22.8in)
max=1120mm(44.1in)
T
w
o
-
s
e
c
t
i
o
n
a
r
m
m
i
n
=
8
5
5
m
m
(
3
3
.
7
i
n
)
m
a
x
=
1
3
6
5
m
m
(
5
3
.
7
i
n
)
Three-section arm
min=580mm(22.8in)
max=1120mm(44.1in)
T
w
o
-
s
e
c
t
i
o
n
a
r
m
m
i
n
=
8
5
5
m
m
(
3
3
.
7
i
n
)
m
a
x
=
1
3
6
5
m
m
(
5
3
.
7
i
n
)
3544mm(139.5in)
Passing width 2378mm(93.6in)
Fig 2d
(C) Diagtools; www.diagtools.eu; [email protected]; Pernavas 43A, Riga, Latvia, LV-1009; +37129416069

LAUNCH Electronic Two-post User’
s Manual
8
2.2 Main structure principles:
Lifting mechanism
:
Each column is installed with
a hydraulic cylinder, when hydraulic oil is
pressed from power pack into the lower
chamber of main cylinder, piston rod moves
upwards to drive the upward movement of
carriage through leaf chain.
Load supporting mechanism
:
When vehicle
drives into the working area, adjust the angle
and telescopic length of arms to make lifting
pads at the effective load supporting position
that contact with vehicle, then adjust the lower
screw ’s height of lifting pad to make it
applicable for vehicles with different chassis.
Balance mechanism
:
In order to keep machine
balanced during lifting and lowering, two
carriages are interconnected and forced to move
synchronously by two wire ropes. If the right and
left carriages and arms are not at the same level,
adjust the end nut of wire rope and pull wire
ropes tight to make arms leveled.
Electromagnet safety lock mechanism: Each
column is installed with two safety lock devices,
when they start to work, this dual safety
mechanism can make the machine stop reliably
without falling during lifting process.
Principles of electromagnet safety lock
mechanism
:
The upper end of safety plate
always attaches to the safety orifice closely.
When the carriage rises, the safety orifice
utilizes its inclined angle to push away the safety
plate and rises progressively. In case of failure
during the moving of the carriage, the rapid
falling will occur, then the safety plate will block
into the safety orifice, preventing the falling of
the carriage (Fig. 3). When the electromagnet is
actuated, the safety plate is released for
carriage lowering (Fig.2e
、
2f)
To prevent the vehicle slip, the swing arm is
installed with positioning mechanism, making
the swing arm capable of automatic locking
during operation.
Safety lock scope: Safety lock mechanism works
when the front end of carriage is between
450mm and 1900mm high above the ground.
Fig 2e
(C) Diagtools; www.diagtools.eu; [email protected]; Pernavas 43A, Riga, Latvia, LV-1009; +37129416069

LAUNCH Electronic Two-post User’
s Manual
9
Fig 2f
3 Operation Description
3.1 Precautions for vehicle repair
work
Different vehicles have different center of gravity
positions. First understand the position of center
of gravity, and when the vehicle enters into the
lift, make its center of gravity close to the plane
formed by two columns. Adjust the swing arm,
and make the lifting pad support onto the lifting
point of the vehicle.
Carefully read the warming symbol.
The hydraulic valves have been adjusted before
ex-factory, and the user can’t make
self-adjustment, otherwise it will be responsible
for all the consequences generated.
Based on the production needs, some
specifications in the instruction manual are
subjected to change without notice
3.2 Preparation before Operation
Lubricate contact surface of the carriage with
general-purpose lithium grease
(
GB7324-87
)
.
All sliding surface should be coated evenly from
the top to bottom.
Fill hydraulic oil N32 or N46 to the oil reservoir of
the power unit.
3.3 Inspection before operation
Check to see if the motor power is installed properly.
Check to see if all the connection Bolt s are fastened.
Note: Don’t operate the lift with damaged
cables or damaged and missing part, until it is
inspected and repaired by the professionals.
(C) Diagtools; www.diagtools.eu; [email protected]; Pernavas 43A, Riga, Latvia, LV-1009; +37129416069

LAUNCH Electronic Two-post User’
s Manual
10
3.4 Lifting the Vehicle
Keep work area clean, don’t operate the lift in
cluttered work area.
Lower the carriage to the lowest position.
Reduce the swing arm to the minimum length.
Swing the arm along the route of the vehicle
Move the vehicle to the location between the two
columns
Swing the arm and put the lifting pad below the
recommended lifting point, and adjust the height
of lifting pad to touch lifting point of vehicle
Press the UP button on the electric control box,
slowly lift the vehicle to ensure the load balance,
and then raise the lift to the required height.
Release the UP button and the carriage will
stop.
Press the DOWN button to engage the safety
lock of carriage. At this time, the vehicle can be
repaired.
Note:
Before operation, the safety locking devices
must be Inspected. ) The gear blocks of the
arm end must engage the gear block of the
restraint shaft.2)No broken strand in the steel
cable. 3)No deformation in the arm pad.
When lifting the vehicle, all the swing arms
must be used.
Before lifting the vehicle, check all the
hydraulic hose and fittings for oil leakage. In
case of leakage, please don’t use the lift.
Remove the fitting with leakage and re-seal.
Re-install the fitting and check if oil leakage
still exists.
After the vehicle is lifted, when adding or
removing any major heavy object, use jack
stand to maintain the balance of the vehicle.
3.5 Lowering the Vehicle
Clean the work area before lowering the vehicle.
First press the UP button to raise the vehicle a
little, then press and hold the UNLOCK button to
disengage the safety lock, and then press
DOWN button to lower the vehicle.
Lower the vehicle till the swing arm down to the
bottom and the lifting pads leave the vehicle
chassis, and then release the two buttons.
The swing arms under the vehicle must be fully
shrunk
Note: When the lift doesn’t work, you must
switch off the power.
(C) Diagtools; www.diagtools.eu; [email protected]; Pernavas 43A, Riga, Latvia, LV-1009; +37129416069

LAUNCH Electronic Two-post User’
s Manual
11
4 Hydraulic and Electrical System of the Equipment
4.1 Hydraulic System of the Lift
Diagram of the hydraulic system of clear-floor 2-post lift
11
2
3
1
4
10
57
6
8
9
8
9
Fig 3a
The working principle of the hydraulic system is as
follows:
When the UP button is pressed, the motor is started,
driving the oil pump, sucking the hydraulic oil from the oil
tank into the oil cylinder 9, forcing the piston rod move. At
this time, the safety valve 5 is closed, and the Max working
pressure is already adjusted before ex-factory. The safety
valve can ensure the capacity of the rated load, but when
the pressure in the system exceeds the limit, automatically
overflow will be happened inside safety valve to protect the
hydraulic system. Release the UP button to stop the oil
supply and the lifting will stop. For lowering, press and hold
the UNLOCK button, the electromagnetic safety lock
mechanism will be released, meanwhile press the DOWN
button, the solenoid valve 6 is actuated, the hydraulic oil
flows back from the hydraulic cylinder into the oil tank
through the solenoid valve 6 and flow-control valve 7, and
the lift starts the lowering.
1- Gear pump, 2- Motor, 3- Oil filter, 4- Check-valve, 5- Safety valve, 6- Solenoid valve,
7- Servo flow-control valve, 8- Hose, 9- Hydraulic cylinder, 10- Level gauge, 11- Air filter
(C) Diagtools; www.diagtools.eu; [email protected]; Pernavas 43A, Riga, Latvia, LV-1009; +37129416069

LAUNCH Electronic Two-post User’
s Manual
12
Diagram of the hydraulic system of floor-plate 2-post lift
2
3
1
457
6
88
99
10 11
1- Gear pump, 2- Motor, 3- Oil filter, 4- Check-valve, 5- Safety valve, 6- Solenoid valve,
7- Servo flow-control valve, 8- Hose, 9- Hydraulic cylinder, 10- Level gauge, 11- Air filter
Fig 3b
The working principle of the hydraulic system is as
follows:
When the UP button is pressed, the motor is started,
driving the oil pump, sucking the hydraulic oil from the oil
tank into the oil cylinder 9, forcing the piston rod move. At
this time, the safety valve 5 is closed, and Max working the
pressure is already adjusted before ex-factory. The safety
valve can ensure the capacity of the rated load, but when
the pressure in the system exceeds the limit, automatically
overflow will be happened inside safety valve to protect the
hydraulic system. Release the UP button to stop the oil
supply and the lifting will stop. For lowering, press and hold
the UNLOCK button, the electromagnetic safety lock
mechanism will be released, meanwhile press the DOWN
button, the solenoid valve 6 is actuated, the hydraulic oil
flows back from the hydraulic cylinder into the oil tank
through the solenoid valve 6 and flow-control valve 7, and
the lift starts the lowering.
(C) Diagtools; www.diagtools.eu; [email protected]; Pernavas 43A, Riga, Latvia, LV-1009; +37129416069

LAUNCH Electronic Two-post User’
s Manual
13
4.2 Electrical System of the Lift
Diagram of the electrical system
(C) Diagtools; www.diagtools.eu; [email protected]; Pernavas 43A, Riga, Latvia, LV-1009; +37129416069
This manual suits for next models
4
Table of contents
Other Launch Lifting System manuals
Popular Lifting System manuals by other brands

AAQ
AAQ AutoLift AL-167251 Installation manual & operation instructions

KAPTARLIFT
KAPTARLIFT MCHW user manual

Maco
Maco HS Salamander evolution Drive 82 Assembly instructions

morse
morse 510SS-114 Operator's manual

human care
human care Altair 55200H user manual

Locomotor
Locomotor Kelly Stand 124 user manual

Discount Equipment
Discount Equipment SKYJACK SJ3013 Operation manual

Lippert Components
Lippert Components Level-Up manual

Tractel
Tractel tirfor TU-8 Operating and maintenance instruction

Ravaglioli
Ravaglioli RAV232 NF manual

Draper
Draper AeroLift 35 Installation & operating instructions

AGM
AGM ASCENSION PROTEGE 5442F Series product manual