
6
Please read the Operating Manual carefully before use and keep them for future
reference.
Prefabrication wagon for GEOSTAR G5/G7
Before installing the prefabrication wagon, the automatic welder must cool down.
Before installing the prefabrication wagon, the automatic welder must be discon-
nected from the electrical network.
The prefabrication wagon can be used to set the overlap width of the membranes.
Warning
Application
Installation
A. Press the locking clamping lever (1) and swing clamping lever (2) upwards until the locking clamping
lever (1) engages and use your other hand to accomplish this by holding the automatic welding machine
firmly by the handle (3).
Place the automatic welder as shown.
B. Undo the 4 x cheese head screws (4) and remove the two track rollers (5/6).
C. Position the prefabrication wagon (7) and fasten it with the 4 x cheese head screws (8) included in the
scope of delivery. Screw the 4 x cheese head screws (8) into the respective middle thread (9).
The 2 x cheese head screws (8) of the bottom stop (10) must be tightened first.
Place the prefabrication wagon on a horizontal,
fireproof support and secure it against rolling
away.
Operating Manual (translation of original operating manual)
GB
A
12
3
CB
4
5
6
4
8
7
10
9
8