Installation and maintenance
LSA 49.1 - 4 POLES
ALTERNATORS
3007en -
• Connection checks
Electrical installations must comply with
the current legislation in force in the
country of use.
Check that:
- The residual circuit-breaker conforms to
legislation on protection of personnel, in
force in the country of use, and has been
correctly installed on the alternator power
output as close as possible to the alternator.
(In this case, disconnect the wire of the
interference suppression module linking
the
neutral).
- Any protection devices in place have not
been tripped.
- If there is an external AVR, the connections
between the alternator and the cabinet are
made in accordance with the connection
diagram.
- There is no short-circuit phase-phase or
phase-neutral between the alternator
output terminals and the generator set
control cabinet (part of the circuit not
protected by circuitbreakers or relays in the
cabinet).
- The machine should be connected with the
busbar separating the terminals as shown
in the terminal connection diagram.
- The alternator earth terminal inside the
terminal box is connected to the electrical
earth circuit
- The earth terminal (ref 28) is connected to
the frame.
The connections inside the terminal box
must never be subjected to stress due to
cables connected by the user.
3.4 - Commissioning
The machine can only be started up and
used if the installation is in accordance
with the regulations and instructions
defined in this manual.
The machine is tested and set up at the
factory. When first used with no load, make
sure that the drive speed is correct and stable
(see the nameplate). With the regreasable
bearing option, we recommend greasing the
bearings at the time of commissioning (see
section 4.3).
On application of the load, the machine
should achieve its rated speed and voltage;
however, in the event of abnormal operation,
the machine setting can be altered (follow
the adjustment procedure in section 3.5). If
the machine still operates incorrectly, the
cause of the malfunction must be located
(see section 4.4).
3.5 - Setting up
The various adjustments during tests
must be made by a qualified engineer.
Ensure that the drive speed specified on
the nameplate is reached before
commencing adjustment.
After operational testing, replace all
access panels or covers.
The AVR is used to make any adjustments
to the machine.