1

Other Little Cottage Greenhouse Kit manuals

Little Cottage Octagon Installation guide

Little Cottage

Little Cottage Octagon Installation guide

Little Cottage Octagon Greenhouse Installation guide

Little Cottage

Little Cottage Octagon Greenhouse Installation guide

Little Cottage Colonial 8x8 Installation guide

Little Cottage

Little Cottage Colonial 8x8 Installation guide

Little Cottage Colonial Gable Greenhouse Installation guide

Little Cottage

Little Cottage Colonial Gable Greenhouse Installation guide

Popular Greenhouse Kit manuals by other brands

Dancover TITAN Arch 196 manual

Dancover

Dancover TITAN Arch 196 manual

ACD PRESTIGE MR3 H manual

ACD PRESTIGE

ACD PRESTIGE MR3 H manual

Vitavia VA0040-TRP Assembly instructions

Vitavia

Vitavia VA0040-TRP Assembly instructions

VegTrug Nursery manual

VegTrug

VegTrug Nursery manual

Riverstone Networks Monticello 041315V Assembly instructions

Riverstone Networks

Riverstone Networks Monticello 041315V Assembly instructions

CLIMA POD Spirit V7 Series Assembly instructions

CLIMA POD

CLIMA POD Spirit V7 Series Assembly instructions

Vitavia GAIA JUMBO Assembly instructions

Vitavia

Vitavia GAIA JUMBO Assembly instructions

Palram Harmony 6'x4' Assembly instructions

Palram

Palram Harmony 6'x4' Assembly instructions

ClearSpan Storage Master 104598 instruction manual

ClearSpan

ClearSpan Storage Master 104598 instruction manual

Sproutwell GRANGE - 5 Assembly instructions

Sproutwell

Sproutwell GRANGE - 5 Assembly instructions

STC Easy Grow 6x12 Greenhouse Assembly instructions

STC

STC Easy Grow 6x12 Greenhouse Assembly instructions

Growhouse Lean To 6 x 8 Erection and Glazing Instructions

Growhouse

Growhouse Lean To 6 x 8 Erection and Glazing Instructions

Riverstone Networks Grower's 181010V Assembly instructions

Riverstone Networks

Riverstone Networks Grower's 181010V Assembly instructions

GrowSpan 500 Series manual

GrowSpan

GrowSpan 500 Series manual

Stocker 9641/2 manual

Stocker

Stocker 9641/2 manual

Outsunny 845-421V02 manual

Outsunny

Outsunny 845-421V02 manual

ACD Piccolo 03 manual

ACD

ACD Piccolo 03 manual

Riverstone Networks MONT-8 Assembly instructions

Riverstone Networks

Riverstone Networks MONT-8 Assembly instructions

manuals.online logo
manuals.online logoBrands
  • About & Mission
  • Contact us
  • Privacy Policy
  • Terms and Conditions

Copyright 2025 Manuals.Online. All Rights Reserved.

Little Cottage Co.
PO Box 455
Berlin, OH 44610
330-893-4212
www.cottagekits.com
© 2011 Little Cottage Co.
Octagon Greenhouse Manual
®
Tools Needed:
-Cordless Drill (12V or higher)
-#2 Square Drive Bit
-Hammer
-6’ Step Ladder
-Tape Measure
-Utility knife
w/ blade & hook blade
-Speed Square
-5/16” Wood Drill bit
Octagon Greenhouse Manual
Construction Manual © 2011 Little Cottage Co. Page 1
12
3 4
56
Locate 4x4 runners for 8x8 Octagon Green-
house. Layout 4x4’s as shown.
Next locate the 8 pieces of rim and
joist.
Here you see the 8 pieces of rim. The rims are numbered as shown. Make
sure matching numbers are connected.
Continue with rim and make sure all
numbers match.
Next secure rim with 2 1/2” Zinc
screws as shown. Make sure all points
are ush as shown.
Octagon Greenhouse Manual
Construction Manual © 2011 Little Cottage Co. Page 2
78
9 10
11 12
Next layout the oor joist. The rims are also marked off where
the joist need to go. Secure joist with 2
1/2” Zinc screws.
Next check oor framing for square as
shown. Next place oor on top of 4x4’s as
shown.
The 2 longest 4x4’s need to be in the
center. Keep 4x4 ush with rim and se-
cure with 2 1/2” Zinc Screws as shown.
Next place shorter 4x4’s as shown.
Next picture will be more detailed.
Octagon Greenhouse Manual
Construction Manual © 2011 Little Cottage Co. Page 3
13 14
15 16
17 18
Hang tape over 4x4 and measure to
corner of rim. Both reveels need to be
the same.
Secure all corners of 4x4s with 2 1/2”
Screws. Next measure oor for square
as shown.
Once oor is square secure all the joist to
the 4x4 runners as shown. Angle 2 1/2”
screws thru joist into 4x4 runner. One on
each side.
Next locate 5/8” plywood ooring.
The plywood is all cut. You may have to
lay the ooring out before you fasten any-
thing to make sure the pieces are placed
properly.
Next secure plywood to joint and rim
as shown using 1 1/4” Zinc Screws.
Octagon Greenhouse Manual
Construction Manual © 2011 Little Cottage Co. Page 4
19 20
21 22
23 24
Continue with fastening oor. Secure 1
1/4” screw every 8” to 10”.
Securing the last piece of ooring.
Next locate wall panels. Start with panel A and continue thru
panel H.
Secure wall panel A with 2 1/2” screws as
shown. make sure corners line up and put
pressure on the outside pushing in so wall
is tight against oor as shown.
Repeat on opposite end.
Octagon Greenhouse Manual
Construction Manual © 2011 Little Cottage Co. Page 5
25 26
27 28
29 30
Continue with walls. Secure all corners with 2 1/2” Zinc
Screws.
Continue with walls. Make sure the inside corner is in place
and secure with 2 1/2” Zinc screws as
shown.
Installing walls. All walls are installed except door wall.
Octagon Greenhouse Manual
Construction Manual © 2011 Little Cottage Co. Page 6
31 32
33 34
35 36
Next locate wall with door and install. Install barrel bolt.
Secure with 1 1/4” screws. Use ham-
mer and tap on top of bolt as shown to
locate hole to drill.
Use 3/16” bit and drill hole in bottom
of door as shown.
Barrel bolt is installed and 3/16” hole is
drilled. This is what it looks like when
completed.
Locate door latch which will be in a
white box.
Octagon Greenhouse Manual
Construction Manual © 2011 Little Cottage Co. Page 7
37 38
39 40
41 42
Install door latch as shown. Use 1 1/4” black headed screws to
secure door latch.
Next secure D-lever on inside. Secure D-lever with 1 1/4” black
headed screws.
Install L-bracket to keep door closed.
Use 1 1/4” blackhead screws to secure
L-bracket.
Door latch is completed.
Octagon Greenhouse Manual
Construction Manual © 2011 Little Cottage Co. Page 8
43 44
45 46
47 48
Locate 2x6 top plate with trim attached. Install top plates as shown. Keep ush
on the inside and make sure corners
line up. Secure with 2 1/2” screws.
Continue with top plates as shown. Insert 2 1/2” screws in an angle to tie top
plates together.
Next locate all the rafters and roof
parts.
Install rst rafter to Octagon as shown
at pencil marked as shown.
Octagon Greenhouse Manual
Construction Manual © 2011 Little Cottage Co. Page 9
49 50
51 52
53 54
Secure with 2 1/2” screws. Next install second rafter and repeat.
Now partial rafter is ready to install. have 2 guys pickup the rafter as shown
and set on top of building.
Secure rafter to top plate and make sure
corners of rafters line up with the edge
of the top plate as shown.
Secure 2x3 that is attached to rafters
into 2x6 top plate with 2 1/2” screws.