
Table of Contents 3
© Travis Industries 12/17/20 - 1528 PB24 CF Install (AUST)
Overview ................................................................... 2
Installation Options.................................................. 6
Heating Specifications............................................. 6
Dimensions............................................................... 6
Packing List .............................................................. 7
Additional Items Required....................................... 7
Recommended Installation Procedure................... 7
Optional Equipment Installation............................. 7
Fireplace Placement Requirements ....................... 8
Clearances ......................................................................8
Raised Fireplaces............................................................8
Minimum Framing Dimensions............................... 9
Minimum Vent “Bump Out” application................. 10
Nailing Brackets ....................................................... 11
Standard vs. Extended Position ............................. 12
Header and Pipe Shield Installation ....................... 13
Corner Installations.................................................. 16
Televisions Placed Above the Fireplace................ 17
Outdoor fireplace installations ............................... 18
Gas Line Requirements........................................... 19
Fuel .................................................................................19
Gas Line Connection.......................................................19
Gas Inlet Pressure...........................................................19
Gas Line Location............................................................20
Electrical Connection............................................... 21
Vent Requirements................................................... 22
Vent Clearances..............................................................22
Vent Firestop or Thimble .................................................22
Altitude Considerations....................................................22
Approved Termination.....................................................22
Approved Vent.................................................................22
Vent Installation...............................................................23
Exhaust Restrictor Position..............................................23
Diffuser............................................................................24
Intake Restrictor Position.................................................25
Vent Configurations................................................. 27
Minimum Vent Configuration ...........................................27
Vent Configuration: Vertical Termination.........................28
Vent Configuration: Horizontal Termination with
Vertical Rise ....................................................................29
Termination Requirements...................................... 30
Hearth Requirements............................................... 31
Lower Trim (Optional).............................................. 32
Removing the lower trim..................................................32
Facing Requirements............................................... 33
Standard vs. Extended Position.......................................34
Thick Facing Guide..........................................................35
Thick Facing (Facing Thicker than 1-1/2” (38mm)).....36
THICK FACING GUIDE SIZE..........................................37
Thin Facing (1/2” (13mm) to 1-1/2” (38mm)) ...................38
Screen Assembly Mounts................................................38
Mantel Requirements...............................................39
Mantel Column Clearances.............................................39
Use of a Non-Combustible Mantel Below Listed
Mantel Clearances....................................................40
Finalizing the Installation ........................................41
Pilot Flame Inspection.....................................................41
Air Shutter Adjustment ....................................................42
Location of Controls ........................................................43
Glass Frame Removal and Installation............................44
Barrier Screen Visual Deflector Adjustment ....................46
Log Set Installation ..................................................47
Ember bed Glass and Ember Material
Installation.................................................................54
Ember bed Glass Installation...........................................54
Ember Material Installation..............................................55
Ember Installation............................................................55
Rock Wool Placement (All Models).................................55
LP Conversion Instructions ....................................56
Wiring Diagram – GSR2...........................................59
CoolSmart TV – Installation Overview
(Optional)...................................................................60
CoolSmart TV – Installation Requirements......................61
CoolSmart TV – Framing the Chase ...............................62
CoolSmart TV – Fireplace Preparation............................63