manuals.online logo
Brands
  1. Home
  2. •
  3. Brands
  4. •
  5. LP
  6. •
  7. Lighting Equipment
  8. •
  9. LP Supalite User manual

LP Supalite User manual

1949319 V1.4 June 2019
Clevertest and Clevertest Plus
Refer to the supplementary operation guide supplied with the Product.
After Power ON, the Status LED on a Clevertest Plus enabled fitting will display a rapid
Green or Red flashing for a period up to 2 minutes.
Zoneworks and DATA Monitored Options
Supalites with part numbers –ZW and -DATA are fitted with Zoneworks communications
modules (nodes).These fittings are monitored using either Powerline Carrier Technology that
utilising the power cable to provide data communication or a dedicated data cable to/from data
routers installed on a dedicated data trunk connected to a central Server (can also be
connected via Ethernet/Internet/Fibre). Zoneworks software on the server is used to monitor,
coordinate testing and collate test data from each fitting. Zoneworks Supalites can be
commissioned by a single push of the test switch or scanning of the supplied barcode. The
LED Test Switch indicator provides a multifunction indication of the status of the ‘Supalite
during testing and normal operation:
State
LED Operation
Commissioned
LED on Solid (GREEN)
Un-commissioned
LED flashes at 0.5Hz (0.5s GREEN, 0.5s Yellow)
Emergency Light Test In
Progress
LED flashes at 3s On (Yellow) & 0.5s Off
In the case of the DATA version a 2-way “figure 8” cable and terminal block facilitates the
connection to the DATA network via a multi-drop bus (daisy chain connection). For further
information of installation of a Zoneworks system, please refer to the Zoneworks Users
Guide and Commissioning Guide (incl. DATA version)
DALI EM Option
Supalites with part numbers -DALI are fitted with DALI modules (nodes) that facilitate
connection and integration to 3rd Party Lighting Control Systems. Before installing the -DALI
Supalite, please confirm that the Lighting Control System has the capability to monitor DALI
Emergency Luminaires. The Supalite will be addressed and configured into the control system
by the Lighting Control System Commissioning Technicians and not Clevertronics.
State
LED Operation
Commissioned/ Un-
commissioned
LED on Solid (GREEN)
Emergency Light Test in
progress
LED flashes at 1s On (Yellow) & 1s Off
“IDENTIFY COMMAND”
Fitting goes into emergency mode for 10 seconds
A 2-way “figure 8” cable and terminal block facilitates the connection to the DALI network OR
a 5/6way “structured wiring system” lead and plug facilitating the power and DALI
connection. DALI connections are marked as Da Da.
LP™ Supalite Weatherproof Emergency Luminaire
With Remote Lamp Heads
Installation & Maintenance Instruction Leaflet
Designed in Australia to comply with the
requirements of AS2293.3: 2005 and AS CISPR15:
2017.
NOTE: Standard product codes with this symbol are
enabled with Clevertest Plus capability. Please referto the
operation guide supplied with the product for details.
Victoria (Head Office & Manufacturing)
195 Chesterville Rd
Moorabbin VIC 3189
Phone: +61 3 9559 2700
Fax: +61 3 9559 2799
News South Wales
Phone: +61 2 8805 6400
Fax: +61 2 8805 6444
Queensland
Phone: +61 7 3442 9700
Fax: +61 7 3442 9777
South Australia/Northern Territory
Phone: +61 8 8301 8800
Fax: +61 8 8351 8286
Western Australia
Phone: +61 8 9248 3720
Fax: +61 8 9248 3725
New Zealand
Phone: +64 800 548 448
Models: CWFLED-xx-2IPREM-yy
Testing:
Options:
Manual Test
xx = Blank
Black
yy = BLK
Zoneworks
xx = ZW
Zoneworks
DATA
xx = DATA
DALI
Compatible
xx = DALI
Clevertest
xx = CT (NOTE: Products supplied with the Clevertest Plus Symbol are
activated with Clevertest PLUS capability. Please refer to the operation guide
supplied with the product for details).
Spare Parts:
1550290
BATT: LP 6.4V 3.2Ah.200mm lead.Stick.Brkt
1100550
WP Led Head, c/w Led's & Loom
1100551
WP Led Head, c/w Led's & Loom, Gland, BLK
CCPLED-WP-18V625C-CKIT
LED Power Pack, 18V 625mA, IP Loom, LP
Important:
It is illegal for anyone, except for a licensed electrician to install or maintain this product. Before
installation, ensure that the electricity supply has been switched off and isolated. Installation
must be carried out in accordance with the relevant Australian and International Standards.
1949319 V1.4 June 2019
Installation:
The LP Weatherproof Supalite (CWFLED-IPREM) is Surface Mounted. The Control gear and
Lamp Heads are housed in weatherproof enclosures. The enclosures are attached to the wall
using screws installed through the 4 isolated holes. Please follow the steps belowto install the
Weatherproof fitting.
Control Gear
•Remove the Control Gear cover.
•Remove the gear tray.
•Determine power entry.
•Drill power access hole in the box base.
•Position the box base in the mounting position.
•Mark the 4 holes for mounting. Install the base using appropriate fixings (not supplied).
•Connect the 240VAC supply to the terminal block on the Gear Tray.
•Reinstall the gear tray.
Remote Lamps
•Remove the enclosure cover.
•Determine cable entry point for LED cable from the Control Gear.
•Drill appropriate hole and install an appropriate cable gland.
•Position the box and mark out the mounting holes. Install the box using appropriate
fixings.
•Route and connect the LED drive cables from the Control Gear (LED+, LED-) using
appropriate weatherproof glands between the Control Gear and the Lamp Heads to
maintain the IP65 rating.
•If the CTP capabilities are activated, please affix the CTP status Label to a visible
surface
Networking:
When installing the product on a monitored network, (ZONEWORKS, DATA, DALI) simply
insert the relevant Smart Node PCA.
Images and Dimensions:
Testing:
When the Supalite unit is connected to the un-switched active, it must be allowed to charge
the battery for at least 24 hours. The emergency lamp only illuminates during a power fail.
Conduct the following tests:
•The emergency lamps must illuminate for at least 2 hours after disconnection from the
mains. The results of all tests are required to be recorded in a service logbook, which is
to be kept on-site at all times. If the unit fails to illuminate for the requisite time, remedial
action must be taken to repair the situation and once completed, the unit must pass a
subsequent test.
•Press and hold Test Button or switch Off Mains Supply, check that the emergency
lamps are On.
•Release the Test Button or Switch On Mains Supply, check that the emergency lamps
are Off (Non-maintained operation).
Below are a list of common problems and their possible causes:
Fault: The Green LED indicator is not illuminated.
Check: A.C. is connected and is turned on.
Battery is connected.
Test Switch for damage.
Fault: Lamp does not illuminate in emergency mode.
Check: A.C. is connected.
Lamp is correctly inserted.
Battery is connected
Fault: Lamp illuminates in emergency mode, but only stays on for a short period.
Check: Battery has been allowed to charge for at least 24 hours.
Battery for damage.
Rated Emergency Lumen Output in accordance with AS2293.1 (refer
to spacing tables for installation positions):
N/A –refer to the IES file when doing computer aided design or request spacing guidance
from Clevertronics.
Caution:
On many building sites, power circuits may be cut off in an uncontrolled and repetitive basis
during construction. As a result, any Supalite Units on these circuits, will have their batteries
discharged or “cycled”. The battery in the Supalite has been selected to give excellent long-
life performance in a controlled IEC 60598-2-22 testing environment. Excessive battery
cycling will reduce through-life performance and may lead to premature battery failure.
Battery warranty claims, as a result of such abuse, are specifically EXCLUDED from
Clevertronics warranty terms.
Warranty:
For Product Warranty information and Terms and Conditions of Sales please refer to our
website http://clevertronics.com.au/terms-conditions-sale-australia-nz/

Other LP Lighting Equipment manuals

LP Cleverfit Pro GEN II LED Exit Maintenance and service guide

LP

LP Cleverfit Pro GEN II LED Exit Maintenance and service guide

LP ELECTRALUME Instructions for use

LP

LP ELECTRALUME Instructions for use

Popular Lighting Equipment manuals by other brands

e-conolight E-WPD Series installation instructions

e-conolight

e-conolight E-WPD Series installation instructions

Shehds LED Flat Par 54x3W VIOLET user manual

Shehds

Shehds LED Flat Par 54x3W VIOLET user manual

ADJ EVENT BAR PRO user manual

ADJ

ADJ EVENT BAR PRO user manual

Yeelight A2001 user manual

Yeelight

Yeelight A2001 user manual

American Lighting CL-CSA Series installation instructions

American Lighting

American Lighting CL-CSA Series installation instructions

ADJ PinPoint Go WW Plus user manual

ADJ

ADJ PinPoint Go WW Plus user manual

PSL OMNIPAR manual

PSL

PSL OMNIPAR manual

GE Tetra miniMAX MS GEMS71-1 installation guide

GE

GE Tetra miniMAX MS GEMS71-1 installation guide

EuroLite Tourlight 200 user manual

EuroLite

EuroLite Tourlight 200 user manual

LIGMAN KWH 8 installation manual

LIGMAN

LIGMAN KWH 8 installation manual

DTS SCENA COMPACT LED 50 user manual

DTS

DTS SCENA COMPACT LED 50 user manual

Nicols GLAM LASER user manual

Nicols

Nicols GLAM LASER user manual

V-TAC VT-1140 instruction manual

V-TAC

V-TAC VT-1140 instruction manual

Blumfeldt 10030254 quick start guide

Blumfeldt

Blumfeldt 10030254 quick start guide

Clas Ohlson JY-7028B quick start guide

Clas Ohlson

Clas Ohlson JY-7028B quick start guide

EuroLite 52500200 user manual

EuroLite

EuroLite 52500200 user manual

Excelitas Technologies XLED1 quick start guide

Excelitas Technologies

Excelitas Technologies XLED1 quick start guide

Probrite ARC50-PC-4K-WH INSTALLATION, USAGE, & CARE GUIDE

Probrite

Probrite ARC50-PC-4K-WH INSTALLATION, USAGE, & CARE GUIDE

manuals.online logo
manuals.online logoBrands
  • About & Mission
  • Contact us
  • Privacy Policy
  • Terms and Conditions

Copyright 2025 Manuals.Online. All Rights Reserved.