
Lucent Technologies Galaxy Power System 4804AP H569-450
4 - Table of Contents Issue 1 June 2000
596 Rectifiers (48V, 50A) 11 - 10
Illustrations 11 - 10
AC Cable Routing 11 - 10
Completing the AC Connection 11 - 11
Addition of Second Rectifier Shelf at Site 11 - 13
Rectifier Shelf Kit 11 - 15
DC Distribution Assembly and Connections 11 - 16
DC Distribution Panels 11 - 16
Connecting Loads 11 - 17
Cable Routing Strategy 11 - 17
Large Circuit Breakers 11 - 17
Connecting Load Termination Cables 11 - 17
Installing a Miniature Circuit Breaker 11 - 18
Low Voltage Disconnect Feature 11 - 19
Alarm Card 11 - 19
Remote Peripheral Monitoring 11 - 20
Introduction 11 - 20
Connection Units 11 - 20
Current Limiting Resistors 11 - 20
RPM Installation 11 - 21
Mounting Locations 11 - 27
Battery Connection Panels 11 - 28
Overview 11 - 28
Options 11 - 28
Connecting (+) and (-) Conductors 11 - 32
Installing Battery Connection Panels 11 - 32
Thermal Probe Connections 11 - 34
Safety 11 - 34
Making Connections 11 - 34
Connecting Thermal Probe Cable Assembly to a BLJ Board 11 - 35
Connecting a 210E Module to a BLJ Board 11 - 36
Connecting Thermal Probe Cable Assembly to Ring Type or
Paddle Type Probes 11 - 39
Connection of Office Alarms 11 - 40
Power Up and Installation Completion 11 - 44
Initial System Checkout and Preparation for Power Up 11 - 44
Initial Power Up of the System 11 - 46
Lamp Test 11 - 48
Voltage Calibration 11 - 49
Setting the System Float Voltage 11 - 50
Setting the System Shunt 11 - 50
Setting the Low-Voltage Battery Disconnect Configuration 11 - 51
Connecting Batteries 11 - 51
Testing Rectifiers and Load Share 11 - 52
Testing Temperature Compensation (Optional Feature) 11 - 52
Testing Additional Alarms 11 - 53