
T. 1300 222 445 | www.melec.com.au For further information about our warranties please go to: melec.com.au/legal/warranties
INSTALLATION GUIDE
1. B
2.
3.
4.
5. Power on, test and commission.
PLEASE NOTE
•
• Disconnect power before installing or servicing
• This fitting is for outdoor use and should not be used in areas with limited ventilation or high ambient temperatures
•
•
•
• 000
•
•
corrosive agents such as moisture, condensation and other harmful elements
Power Selection:
1. Unscrew the cap accessing to the PE cell and power switch.
2.
to the labelled output position.
3. Screw the cap back on after selection to maintain IP65 rating.
PE Cell Activation:
1. Unscrew the cap accessing to the PE cell and power switch.
2.
Position.
3. Screw the cap back on after selection to maintain IP65 rating.
L
N