1/3
18000 With
21000 MAX-ER
Luffing Jib Raising Procedure
Luffing Jib No. 79A on Boom No. 55 or No. 55A
with 140 ft (42,7 m) Mast No. 56
Hanging Counterweight
Manitowoc Cranes
Manitowoc, Wisconsin 54220 U.S.A.
EN 13000
Recommended boom and luffing jib raising and lowering procedure.
Machine must be equipped with 492,000 lb (223 170 kg) crane counterweight,
320,000 lb (145 150 kg) carbody counterweight and 0 lb (0 kg), 247,800 lb
(112 400 kg), 467,800 lb (212 190 kg), or 599,800 lb (272 060 kg) hanging
counterweight. Refer to luffing jib rigging assembly No. A08238 for boom and luffing jib
make-up of inserts, straps, struts, strut raising procedure, jib stop positioner setup and
operation, jib stop raising and lowering procedure and miscellaneous parts, etc.
Boom and luffing jib combinations must be raised and lowered using jack-knife
method.
Release swing brake (disengage swing lock) and slowly raise boom while jib point
dolly is allowed to roll on ground. Tension should be applied to luffing jib hoist to keep
jib strut off luffing jib during boom raising. Boom up until boom to luffing jib angle
reaches 140 degrees. Extend jib stop positioner cylinders (see procedure). Continue
to boom up until boom to luffing jib reaches value specified in table. Tighten luffing jib
suspension with luffing jib hoist. Boom and luffing jib are then raised together using
boom hoist until boom reaches desired boom operating angle. Luffing jib radius must
be within capacity chart before swinging over side of machine when raising over end
of blocked crawlers.
Position boom at 85 degrees prior to lowering luffing jib. Lower luffing jib until boom
to luffing jib angle reaches value specified in table. Lower boom until luffing jib point
is just above ground. Position dolly under upper jib point, then lower upper jib point
onto dolly. Release swing brake (disengage swing lock) and continue to lower boom
while luffing jib rolls along ground until boom to luffing jib angle reaches 140 degrees.
Keep enough tension on luffing jib hoist to keep jib strut off luffing jib. Retract jib stop
positioner cylinders (see procedure). Continue to lower boom while luffing jib rolls
along ground.
CAUTION: Do not under any condition allow boom to luffing jib angle to become less
than 70 degrees.
REFERENCE ONLY!
9253-A, 2013-03-19
2/3
18000 With
21000 MAX-ER
Luffing Jib Raising Procedure
Luffing Jib No. 79A on Boom No. 55 or No. 55A
with 140 ft (42,7 m) Mast No. 56
Hanging Counterweight
Manitowoc Cranes
Manitowoc, Wisconsin 54220 U.S.A.
EN 13000
WITH OR WITHOUT BOOM AND/OR JIB CATWALKS
Maximum Boom and Luffing Jib Lengths Lifted Unassisted Using Jack-Knife Method
Boom
Length
Over End of Blocked Crawlers Over Side of Crawlers
0 lb (0 kg) Hanging Counterweight
Luffing Jib No. 79A
Boom to
Luffing Jib
Angle Luffing Jib No. 79A
Boom to
Luffing Jib
Angle
Feet Meters Feet Meters Degrees Feet Meters Degrees
160 48,8 90 - 130 27,4 - 39,6 140 90 - 110 27,4 - 33,5 140
150 - 270 45,7 - 82,3 90 130 - 210 39,6 - 64,0 90
290 - 310 88,4 - 94,5 70 230 - 310 70,1 - 94,5 70
180 54,9 90 - 210 27,4 - 64,0 90 90 - 110 27,4 - 33,5 90
230 - 310 70,1 - 94,5 70 130 - 270(a) 39,6 - 82,3 70
200 61,0 90 - 190 27,4 - 57,9 70 — ——
Load blocks, hook and weight ball on ground until boom and luffing jib are erected.
(a) Machine must equipped with optional upperworks jacking cylinders.
REFERENCE ONLY!
9253-A, 2013-03-19
3/3
18000 With
21000 MAX-ER
Luffing Jib Raising Procedure
Luffing Jib No. 79A on Boom No. 55 or No. 55A
with 140 ft (42,7 m) Mast No. 56
Hanging Counterweight
Manitowoc Cranes
Manitowoc, Wisconsin 54220 U.S.A.
EN 13000
WITH OR WITHOUT BOOM AND/OR JIB CATWALKS
Maximum Boom and Luffing Jib Lengths Lifted Unassisted Using Jack-Knife Method
Over Side or End of Unblocked Crawlers
Boom
Length
247,800 lb (112 400 kg)
Hanging Counterweight
at 59 ft (18 m) Position
467,800 lb (212 190 kg)
Hanging Counterweight
at 59 ft (18 m) Position
599,800 lb (272 060 kg)
Hanging Counterweight
at 59 ft (18 m) Position
Luffing Jib No. 79A
Boom to
Luffing Jib
Angle Luffing Jib No. 79A
Boom to
Luffing Jib
Angle Luffing Jib No. 79A
Boom to
Luffing Jib
Angle
Feet Meters Feet Meters Degrees Feet Meters Degrees Feet Meters Degrees
160 48,8 90 - 230 27,4 - 70,1 140 90 - 290 27,4 - 88,4 140 90 - 310 27,4 - 94,5 140
250 - 310 76,2 - 94,5 90 310 94,5 90 — — —
180 54,9 90 - 190 27,4 - 57,9 140 90 - 270 27,4 - 82,3 140 90 - 310 27,4 - 94,5 140
210 - 310 64,0 - 94,5 90 290 - 310 88,4 - 94,5 90 — — —
200 61,0 90 - 150 27,4 - 45,7 140 90 - 230 27,4 - 70,1 140 90 - 290 27,4 - 88,4 140
170 - 310 51,8 - 94,5 90 250 - 310 76,2 - 94,5 90 310 94,5 90
220 67,1 90 - 110 27,4 - 33,5 140 90 - 210 27,4 - 64,0 140 90 - 270 27,4 - 82,3 140
130 - 270 39,6 - 82,3 90 230 - 310 70,1 - 94,5 90 290 - 310 88,4 - 94,5 90
290 - 310 88,4 - 94,5 70 — — — — — —
240 73,2 90 - 210 27,4 - 64,0 90 90 - 170 27,4 - 51,8 140 90 - 230 27,4 - 70,1 140
230 - 310 70,1 - 94,5 70 190 - 310 57,9 - 94,5 90 250 - 310 76,2 - 94,5 90
260 79,2 (a)90 - 190 27,4 - 57,9 70 90 - 130 27,4 - 39,6 140 90 - 190 27,4 - 57,9 140
(b)210 - 250 64,0 - 76,2 — 150 - 310 45,7 - 94,5 90 210 - 310 64,0 - 94,5 90
280 85,3 — — — 90 - 110 27,4 - 33,5 140 90 - 170 27,4 - 51,8 140
———
130 - 250 39,6 - 76,2 90 190 - 310 57,9 - 94,5 90
— — — 270 - 310 82,3 - 94,5 70 — — —
300 91,4 — — — 90 - 110 27,4 - 33,5 90 90 - 130 27,4 - 39,6 140
———
130 - 230 39,6 - 70,1 70 150 - 270 45,7 - 82,3 90
— — ————
290 - 310 88,4 - 94,5 70
320 97,5 — — ————90 27,4 140
— — ————
110 - 170 33,5 - 51,8 90
——
———— 190 - 270 57,9 - 82,3 70
Load blocks, hook and weight ball on ground until boom and luffing jib are erected.
(a) Machine must be equipped with upperworks jacking cylinders.
(b) Raising reserve is less than 10% tip weight. When equipped with boom and/or jib catwalks, 250 ft (76,2 m) luffing jib on
260 ft (79,2 m) boom cannot be raised with 247,800 lb (112 400 kg) hanging counterweight.
REFERENCE ONLY!

Other manuals for 18000

3

This manual suits for next models

1

Other Manitowoc Construction Equipment manuals

Manitowoc GROVE GMK3060 User manual

Manitowoc

Manitowoc GROVE GMK3060 User manual

Manitowoc 18000 User manual

Manitowoc

Manitowoc 18000 User manual

Manitowoc Shuttlelift CD5520 User manual

Manitowoc

Manitowoc Shuttlelift CD5520 User manual

Manitowoc Grove GMK 4100L-1 User manual

Manitowoc

Manitowoc Grove GMK 4100L-1 User manual

Manitowoc Grove RT765E-2 Installation and user guide

Manitowoc

Manitowoc Grove RT765E-2 Installation and user guide

Manitowoc M-250 2 Series User manual

Manitowoc

Manitowoc M-250 2 Series User manual

Manitowoc GROVE GMK3060 User manual

Manitowoc

Manitowoc GROVE GMK3060 User manual

Manitowoc Grove RT530E-2 User manual

Manitowoc

Manitowoc Grove RT530E-2 User manual

Manitowoc Grove GRT655 User manual

Manitowoc

Manitowoc Grove GRT655 User manual

Manitowoc 16000 User manual

Manitowoc

Manitowoc 16000 User manual

Manitowoc 16000 User manual

Manitowoc

Manitowoc 16000 User manual

Manitowoc Grove RT770E User manual

Manitowoc

Manitowoc Grove RT770E User manual

Manitowoc MLC300 User manual

Manitowoc

Manitowoc MLC300 User manual

Manitowoc MLC165-1 User manual

Manitowoc

Manitowoc MLC165-1 User manual

Manitowoc National Crane NBT30H-2 User manual

Manitowoc

Manitowoc National Crane NBT30H-2 User manual

Manitowoc Grove GRT9165 User manual

Manitowoc

Manitowoc Grove GRT9165 User manual

Manitowoc National Crane NC1400H User manual

Manitowoc

Manitowoc National Crane NC1400H User manual

Manitowoc MLC300 User manual

Manitowoc

Manitowoc MLC300 User manual

Manitowoc MLC80A-1 User manual

Manitowoc

Manitowoc MLC80A-1 User manual

Manitowoc MLC165 User manual

Manitowoc

Manitowoc MLC165 User manual

Manitowoc Grove CD3340B User manual

Manitowoc

Manitowoc Grove CD3340B User manual

Manitowoc GHC 55 Operating instructions

Manitowoc

Manitowoc GHC 55 Operating instructions

Manitowoc Grove GMK 5250L User manual

Manitowoc

Manitowoc Grove GMK 5250L User manual

Manitowoc 777 User manual

Manitowoc

Manitowoc 777 User manual

Popular Construction Equipment manuals by other brands

Fayat Group BOMAG BC 672 RB-4 Service manual

Fayat Group

Fayat Group BOMAG BC 672 RB-4 Service manual

Dynapac CA 512 Series instruction manual

Dynapac

Dynapac CA 512 Series instruction manual

zarges PAXTower 3T 5535122 instruction manual

zarges

zarges PAXTower 3T 5535122 instruction manual

Smiley Lifting Solutions SPYDERCRANE PC094 Operator's manual

Smiley Lifting Solutions

Smiley Lifting Solutions SPYDERCRANE PC094 Operator's manual

SFS intec isoweld 3000 Installing instructions

SFS intec

SFS intec isoweld 3000 Installing instructions

PROAIM JB-AS04-00 Assembly manual

PROAIM

PROAIM JB-AS04-00 Assembly manual

MSW MSW-ECF1-01 user manual

MSW

MSW MSW-ECF1-01 user manual

stellar labs 9000 owner's manual

stellar labs

stellar labs 9000 owner's manual

Baumr-AG BCX650 user manual

Baumr-AG

Baumr-AG BCX650 user manual

The Handy THLC29140 instruction manual

The Handy

The Handy THLC29140 instruction manual

HYVA AMCO VEBA 804FM WARNING, OPERATING AND MAINTENANCE MANUAL

HYVA

HYVA AMCO VEBA 804FM WARNING, OPERATING AND MAINTENANCE MANUAL

Innotech QUAD-11 manual

Innotech

Innotech QUAD-11 manual

Jancy Engineering JB2400 Operator's manual

Jancy Engineering

Jancy Engineering JB2400 Operator's manual

Komatsu XT430-2 Operation & maintenance manual

Komatsu

Komatsu XT430-2 Operation & maintenance manual

Fayat Group Dynapac CA25 instruction manual

Fayat Group

Fayat Group Dynapac CA25 instruction manual

Stone 1050PM Service & parts manual

Stone

Stone 1050PM Service & parts manual

Turbosol UNI 30 E Use and maintenance manual

Turbosol

Turbosol UNI 30 E Use and maintenance manual

ACO SERVOKAT GD Installation and maintenance manual

ACO

ACO SERVOKAT GD Installation and maintenance manual

manuals.online logo
manuals.online logoBrands
  • About & Mission
  • Contact us
  • Privacy Policy
  • Terms and Conditions

Copyright 2025 Manuals.Online. All Rights Reserved.