
SP9
SP9 SINGLE-SERVE PRECISION BREWER
COUNTER CUTOUT CABINET CLEARANCE SP9 SINGLE 1000832
SP9 TWIN 1000833
ELECTRICAL INSTALLATION PROCEDURE
When installing the machine, always observe the local
regulations and standards. The standard machine is
supplied with a UK 3-pin plug. For EU models a 2-pin CEE-7
plug will be supplied. US models will be supplied with the
suitable plug. A suitable mains power supply socket should
be available within easy access of the appliance so that it
can be disconnected easily after install.
PLUMBING INSTALLATION PROCEDURE
• Ensure that the equipment is installed according to local
plumbing & water regulations.
• Mains water pressure required (limits): 14.5 - 145psi
(100 - 1000kPa, 0.1 - 1MPa).
• Requires inline water filter within your water
specifications.
• The machine is supplied with a 3/4“ BSP connection.
• Turn on the water to flush any impurities, dust etc
from the inlet hose and water pipe. Allow several litres
through. Especially for new installations.
• Connect the hose to the inlet valve of the boiler. Make
sure a sealing washer is fitted.
• Turn on water and check for leaks.
• The SP9 Head has a drip tray attached with a drain
outlet which should be plumbed to waste.
OPERATING BOILER FOR THE FIRST TIME
• Check that all installation procedures have been
carried out.
• Ensure the water valve is on.
• Plug in the SP9 Boiler to an appropriate electrical supply
and press the power button on the front of the machine.
• The light will glow green and the machine will fill to a
safe level, above the elements, before heating.
• The “Ready/Status” light will cycle two red flashes while
the machine is filling to the safe level.
• Whilst the machine is above the safe level and filling,
the “Ready/Status” light will remain blank.
• The “Ready/Status” light will glow green when the
machine is both full and up to normal operating
temperature.
• The SP9 Boiler takes 15 minutes to heat up initially.
• The SP9 Boiler is now ready for use.
NOTE: Because the machine is electronically controlled no
priming is necessary.
Plan View
2”/50mm*
2”/50mm
* Required for ventilation if the machine
is installed in an enclosed cabinet.
3.1”/80 mm
3.3”/ 83mm ±1
5.2”/131mm 3.9”/100mm 5.2”/131mm
3.1”/80 mm
3.1”/80 mm
3.1”/80 mm
22.3”/565mm
>27.6”/700mm
15.6”/396mm
2”/50mm
16.4”/416mm
* Hosing should be trimmed
to ensure continuous drop
from SP9 head to boiler
HEAD ONE
HEAD TWO
POWER
VENT
FEED TO HEAD
RETURN FEED
TO BOILER
2”/50mm*
2”/50mm
* Required for ventilation if the machine
is installed in an enclosed cabinet.
3.1”/80 mm
3.3”/ 83mm ±1
5.2”/131mm 3.9”/100mm 5.2”/131mm
7.6”/192.8mm
3.1”/80 mm
3.1”/80 mm
3.1”/80 mm
22.3”/565mm
>27.6”/700mm
15.6”/396mm
2”/50mm
16.4”/416mm
* Hosing should be trimmed
to ensure continuous drop
from SP9 head to boiler
HEAD ONE
HEAD TWO
POWER
VENT
FEED TO HEAD
RETURN FEED
TO BOILER
Plan View
2”/50mm*
2”/50mm
* Required for ventilation if the machine
is installed in an enclosed cabinet.
3.1”/80 mm
3.3”/ 83mm ±1
5.2”/131mm 3.9”/100mm 5.2”/131mm
7.6”/192.8mm
3.1”/80 mm
3.1”/80 mm
3.1”/80 mm
22.3”/565mm
>27.6”/700mm
15.6”/396mm
2”/50mm
16.4”/416mm
* Hosing should be trimmed
to ensure continuous drop
from SP9 head to boiler
HEAD ONE
HEAD TWO
POWER
VENT
FEED TO HEAD
RETURN FEED
TO BOILER