
For more information visit www.marcobeveragesystems.com
FRIIA LITE CS & FRIIA LITE CS TALL
FRIIA LITE COLD/SPARKLING
COUNTER CUT-OUT WITH DRIP TRAY FRIIA LITE CS 5000206
FRIIA LITE CS TALL 5000207
VENTILATION REQUIREMENTS
FRONT VENTILATION: Ventilation grilles cut out of standard cabinet door.
SIDE VENTILATION: Ventilation grilles cut out of standard 600mm
cabinet. Grilles may be fitted on either side as long as they ventilate
into an open unobstructed area.
BASE VENTILATION: Ventilation grilles cut in base panel and base
plinth, a grille must also be cut out at the top of the cabinet.
• At least 2 x vents 260mm/10.2” w x 65mm/2.5 h
UNPACKING INSTRUCTIONS
> The chiller must be handled only in a vertical position. Transporting
the appliance in a horizontal position can cause severe damage to
the refrigerator.
> Remove the exterior and interior packing. Packing materials
(especially any plastic bags) should be stored out of the reach
of children, as a potential source of danger. When disposing
packaging parts, please follow current regulations on the matter,
separating carton from plastic parts.
> Always check that the equipment that is delivered corresponds to
the model indicated in the accompanying document.
> The equipment is shipped in a cardboard box. Once the packaging
has been removed, check the equipment has not been damaged in
transit; if damage is found, notify the carrier.
ELECTRICAL INSTALLATION PROCEDURE
When installing the machine, always observe the local regulations and
standards. The appliance is supplied with a moulded power cord. A
suitable mains power supply socket should be available within easy
access of the appliance so that it can be disconnected easily after install.
The standard machines are supplied with a UK 3-pin plug. For
EU models a 2-pin CEE-7 plug will be supplied. US models will be
supplied with the suitable plug. A suitable mains power supply socket
should be available within easy access of the appliance so that it
can be disconnected easily after install. The wires from the font are
terminated in a Mini Fit connector which will plug into a similar Mini Fit
connector mounted on the top lid of the undercounter boiler.
PLUMBING INSTALLATION PROCEDURE
> Ensure that the equipment is installed according to local plumbing
& water regulations.
> Fit a stop valve on a cold water line and attach a 3/4” BSP male
fitting, (eg. 3/4” x 1/2” 311 or washing machine type stop valve).
Suitable fittings are supplied with the kit to attach to the 3/4” BSP
fitting to connect the supplied 3/8” hose.
> Connect water supply lines following the installation drawings,
as per installation guide (starting page 14).
> In case filter systems are used verify that they satisfy the
requirements of the legislation in force.
> If the filter is new, turn on water and flush at least 10 litres
(2.5 gallon) through the filter before to connect it to the cooler;
if the filter is a used one, connect water inlet to the chiller.
> To ensure that the maximum value of pressure of 3 Bar is not
exceeded the chiller integrates a pressure reducer.
> Turn on the water to flush any impurities, dust etc from the inlet hose and
water pipe. Allow several litres through. Especially for new installations.
BEFORE USING CHILLER
> Before connecting the chiller to the power source, let it stand upright for
approximately 2-3 hours, this will reduce the possibility of a malfunction.
> Check that all installation procedures have been carried out.
> Ensure water inlet is open.
> Ensure CO2 valve is full stop.
> Before supplying power to the chiller check water and CO2 lines
do not leak.
> Plug the chiller into a suitable socket and turn the Cooling Switch
on the rear of the chiller to the ON position.
> When the unit is on, the carbonation pump starts to fill. The
carbonation device stops when it reaches the maximum level.
> If using an external CO2 Cylinder, on the pressure reducer knob, adjust
CO2 pressure to a value between 50 and 65 PSI (350 and 450 kPa) (3.5 -
4.5 bar).This value depends on the temperature of the water and on the
ambient temperature. The temperatures correspond to the CO2 pressure.
> The chiller will take aproximatly 70-120 minutes to get down to
temperature depending on the temperature of your incoming water.
The blue light on the front of the chiller remains flashing during
chilling.
> Once the blue light stops flashing and remains solid the chiller is
down to temperature and at this point you can dispense water.
> To enable the filling of lines, push the font buttons in the following order:
sparkling water, cold water & hot water until the flows appear.
> At this point you can dispense water.
4”/100mm
For drip-tray only
1.25”/32mm
3.25”/82.5mm
6.6”/168mm
COLD
(1/4”)
ELECTRICAL
(FONT CONNECTION)
287mm
412mm