Wind
speed
[km/h]
Ground Weight / Anchor for each
foot
Anchor for rope mounted
under 45°
< 50
Concrete
substrate 2×27,5kg** –
Ground
substrate 3×steelanchor34cm* Twistedsteelanchor,
length34cm*
50–100
Concrete
substrate
3×standardsegmentanchor
HSA-RM6×8530/40***
Sleeveanchor(closed
eyebolt)HLC-EC16×100***
Ground
substrate 3×steelanchor34cm* Steelanchorlength45cm
*Tent’sstandardequipment
**Non-standardtentequipmentaccessory
***Art.oeredbyHil(Poland)Sp.zo.o.hps://www.hil.pl/)
Table1.Waystoanchoratent
snowgatheringontheroof,ifthelayerofthesnowis2cmorhigher.
4. Waterlingeringontheroofshouldbeimmediatelyremoved.
5. Withrecurringgustsofwind,anchoringshouldbecheckedsystemacally.
6. Producerdeclaresthatthestasccalculaonsforthetentwerecarriedoutin
accordancewithPN-EN13782:2005normconcerningTemporaryobjects,tents,
safety.Thetentmaybeusedinazonewithwindupto28m/s(100km/h)provided
itisprotectedagainstwindgustsasdescribedintableno.1.Duringstrongwindthe
productshouldbefoldedimmediately.Mechanicaldamageresulngfromfailureto
followtheaboverecommendaonsarenotcoveredbythewarranty.
ASSEMBLY SEQUENCE
1. Takeoutthecomponentsofthetentfromthebagandlayonevenground.
2. Theprolesareedwithcordstokeepthemtogether.
3. Connectintoarchestheproleswhichmaketheentrancess.Connectintoarches
theprolesoftheload-bearingstructure.
4. Inserttheproleoftheload-bearingstructureintothe5-wayconnector.
5. Litheframe(werecommendusingaladder).Releasebuonswillplace
themselvesinproleholes.
6. Settheprolesontheotherfeet.
7. Settheprolesthatmaketheentrancesonthesidetubesofthefoot.