
3.5X9.5
3.5X9.5
4.8X13
4.8X13
M8X12
M8X60
A
B
C
D
E1
2
2
3
4
5
myone S.r.l - Via T. Abbate, 52 - 30020 Quarto d’Altino (VE) - ITALY Tel. +39 0422 824384 - Fax +39 0422 824384
www.myoneautomation.com
E
D
L.
D,E = L-10mm
E
D
B
1. Fissare le staffe “A” (dx / sx) a parete, in modo robusto mediante viti TCEI M8.
2. Fissare le piastre “B” alla trave “D” ogni 800 mm circa, mediante le viti 4,8x13.
3. Inserire le staffe “C” nella trave “D” (dx / sx).
4. Fissare la trave “D” alla staffa “A”, mediante le viti M8x12.
5. Fissare il prolo “E” alla trave “D”, mediante le viti 3,5x9,5.
1. Fix the “A” brackets (right/left) on the wall, sturdy using TCEI M8 screws.
2. Fix the “B” brackets to the “D” beam every 800 mm circa, using the screws 4,8x13.
3. Insert the “C” brackets into the “D” beam (right/ left).
4. Fix the “D” beam to the “A” bracket, using the screws M8x12.
5. Fix the “E” prole to the “D” bracket, using the screws 3,5x9,5.