INSTALLATION OF ZHJS + ZHJCFOOT ASSEMBLY
This guideline describes how to install the ZHJS + ZHJCfoot
assembly onto the machine or component for which it is intended
to support.
0a. Prior to installation of the foot ensure that the incline
of the oor area intended to support the foot pad
does not exceed 10 degrees relative to horisontal.
0b. Assure that the foot pad will not span over cracks,
grout lines or other oor imperfections when
mounted. If unavoidable the cavity between the
load bearing foot and the oor must be sealed with
injecting bonding material under and around the edge
of the load bearing foot.
1a. Lift/Jack up the machine for free access to mount
foot assembly.
1b. Ensure that sealing is correctly mounted on top of
the sleeve. Grease external thread with FoodLube
Universal Grease. Make sure to remove any excess of
grease from external surfaces after installation.
2. Mount the machine foot on the machine and use a
wrench to adjust the vertical position. Make sure not
to exceed the max adjustable height and that the
length of engagement is correct.
Complete step 0-2 for all feet supporting the machine.
Lower the machine so that the feet rest on the floor.
Perform height adjustment if needed and ensure that
the machine is placed corretly and levelled
horizontally.
3. Use a wrench to rotate and tighten the sleeve up
against the bottom of the machine or component for
which the foot is used. Make sure that the sleeve is
properly tightened to secure the foot assembly and to
prevent dirt from accessing the thread.
NB. If the sleeve does not cover the thread, the leg is not
correctly installed and will neither meet hygienic
guidelines nor load specications.