
NRD USA / 2937 Alt Boulevard / PO Box 310 / Grand Island, NY 14072-0310
NRD Asia Pte. Ltd / 114 Lavender Street #08-90 CT Hub 2 Singapore 338729
INST2001 – 1/19
Installation / Operation / Maintenance
Staticmaster Linear Ionizer
Models P-2001 and P-2001-I, and
Combination Bar Model P-2001/4275
Please Observe the Following
NOTICE:
Please review the information in this manual prior to operating the Nuclestat®in a work
environment.
Please keep this document in a convenient place to refer to as a guide
Description
This family of ionizers neutralizes the high
static charges developed in materials being
rocessed by providing ionized air to them.
Installation & Operation
1. Remove the protective cover shield by
sliding it off either end.
2. Determine a mounting location that will
satisfy the following requirements:
A) The ionizer will face the side of the
material that is statically charged.
B) The ionizer will be positioned after the
point where static is developed, e.g.,
after the last static generating roller o
friction point.
C) The distance between the ionizer (i.e.,
Nuclestat® grid or Induction Ba
rushes or points) and the charge
material will be pprox.. 1-1/8”(3
cm).
D) No part of the ionizer will contact the
charged material during normal
process operations.
E) If the Model P-2001-I is to be
installed, the processed material must
pass by the Induction Brushes without
contact.
F) If installing more than one ionizer for
single application, the ionizers will not
e positioned directly opposite each
other on both sides of the material
being processed.
3. Mount the ionizer to a rigid structure in the
selected location. Attachment hardware
(two #8-32 socket head cap screws) is
provided.
4. Ground the ionizer by attaching the eyele
at the free end of the grounding strap to
ground potential. (Attachment hardware is
not provided). Ensure that the process
machinery is also grounded. Verify that
the ionizer and machinery are grounded by
having them checked by a qualifie
electrician.
The ionizer is now ready for use.