
5
Notes to the instruction.
1. Assembly sequence is specified by the ordinal number in the left bottom corner of each
picture of the assembly operation.
2. Type and quantity of the mounting products for the assembly operation are specified in
the left upper corner of its picture.
Recommendation for trolley exploitation.
1. It is recommended to begin filling the trolley from the lowest drawer.
2. It is recommended to evenly spread weight over the drawer’s bottom for the optimal
load of ball-bearing slides.
Attention:
3. When you move fully filled trolley it is not allowed to overcome obstacles with height of
more than 10 mm, because it can lead to trolley damage.
4. When using the trolley, pull out the drawers STRICTLY one by one, because pulling out
of two or more loaded drawers simultaneously can lead to trolley dumping.
Notes
1. Constructive changes, not noted in this instruction, are possible.
1. Check operability of the wheel’s stopper.
2. Check whether all the drawers are blocked when the lock is closed.
Page 2/2