QYSEA FIFISHV6 User manual

Quick Start for
Electrical Spool
(3 in 1)


Contents
Packing list·······································································································································01
Safety Rules·····································································································································05
Product specification······················································································································06
Usage instructions··························································································································07
Installation······································································································································08
Operation········································································································································18
Operation (Share screen & USB recording )···················································································22
LED color index (OPSS-PM)·············································································································29
Maintenance and after-sales support···························································································· 30
Disclaimer········································································································································31


01/Packing List and Introduction
01
Serial
Number
Item Name
Quantity
Unit
1
Eletric Spool
1
PCS
2
OPSS Power Management
1
PCS
3
Universal Power Adapter
1
PCS
4
AC Input Cable for OPSS-PM
1
PCS
5
E-Tank Mount on ROV
1
PCS
6
Mini USB to Ethernet cable
1
PCS
7
HDMI Cable
1
PCS
8
RC Cable
1
PCS
9
E-spool to OPSS-PM Cable
1
PCS
10
AC Input Cable for OPSS-PM
1
PCS
11
Quick Start
1
PCS

01/Packing List and Introduction
02
FIFISH E-Spool
1. ON / OFF
2. Battery Level
3. Start / Stop
4. Speed Switch
5. 3.5 mm Port (to RC)
6. Ethernet Port
7. U Disk Port
8. HDMI Output
9. OPSS Port
10. Charging Port for E-Spool
1
2
43
9
7
6 5
8
10

01/Packing List and Introduction
03
Onshore Power Supply System - Power Management (OPSS-PM)
1. AC Input socket (95~240 V in AC)
2. AC Output socket
3. ON/OFF
4. Status Indicator LED
1
2
43
2 1

01/Packing List and Introduction
04
1
2
3
Electric Power Tank (E-Tank)
1. E-Tank
2. Securing Loop
3. ROV Plug

Before operating FIFISH products, please be sure to receive relevant training and
take practices, and read this document thoroughly before performing underwater
operations. Operations in violation of QYSEA safety rules may result in the
consequence that your safety and interests cannot be guaranteed.
1.Unauthorized disassemble may cause the leakage problem, and damages on OPSS. Such type of safety issues
is not responded to QYSEA’s legal liability. In addition, the warranty will not valid for unauthorized
disassembled products.
2.ROV shall be OFF before plug in power outlet.
3.Check the tether, connecters and seals after every dive.
4.The tether external surface shall contact well. If you find any damages, such as, scratches, peel off or split,
stop using damaged tether and contact your local authorized service center or dealer for repair or replacing.
5.All connectors shall be clean and dry in all time to avoid shortages, and corrosions.
6.All seals and O-rings shall be contact and clean in all time, otherwise, replace it ASAP.
7.Keep the OPSS-PM OFF when deploy and retrieve.
8.It is NOT recommended to use OPSS when diver is operating underwater.
9.Do NOT touching OPSS’s tether and E-Tank underwater.
10.Monitoring the status indicator LED, the error color code index
11.No heavy objects left on OPSS-PM.
12.Do NOT put OPSS-PM inside water or wet floors, and avoid wave splashes.
02/Safety Rules
05

03/Product Specification
06
Item
Specification
OPSS Tether (Length)
200 m
Work Temperature
-10 to 60 ℃
Status Indicator
LED
Submersible Charge time (in Static Water)
less than 2 hours (20% to 100%)
HDMI Output resolution
1080P 60fps

04/Usage Instructions
Precautions before usage
1. Before usage, please check whether all accessory interfaces, plug-ins, and O-rings are damaged or missing,
and whether they are kept dry and clean.
2. Before connecting the Q-Camera with the underwater vehicle, the underwater vehicle shall be powered off.
3. Check the battery level of the underwater vehicle to ensure that there is sufficient and stable power.
4. Please check the completeness of the Q-camera accessories, and make sure that the accessories can work
normally when conducting electrical tests on land.
5. Before entering the water, please check the connectors of the accessories, in particular, the connector of the
underwater probe should be strictly sealed. Please also check the connectors already installed on the
underwater vehicle and prevent them from being damaged.
6. Check whether the underwater robot and remote control can work normally.
7. Check the batteries of mobile phones, tablet PCs and laptops.
07

05/Installation
08
1. Install the tail kits to the bracket

05/Installation
09
2. Install the bracket between the thrusters
需要换图

05/Installation
10
3. Place and lock the E-Tank to the bracket
Pull out and rotate 45° the Dowel Pin
to Lock/Unlock

05/Installation
11
4. Remove the proctective cap
Insert ROV plug and fasten the cap

05/Installation
12
5. Tie the securing loop around the rear wing
Note: Check whether the knot is locked. NO gap between the rings.

05/Installation
13
6. Connect the OPSS-PM to the electric spool

05/Installation
14
7. Insert power cord
Plug AC input Cable to the socket
Note: please keep the power outlet off for safety

05/Installation
15
8. Connect one end of the 3.5 mm cable to the remote controller
and the other end to the electric spool

05/Installation
16
9. Connect MINI USB-ethernet cable between the RC and electric spool
Table of contents
Other QYSEA Drone manuals