
en
4
1 Overview
• Pre-assembled with all electrical components and ready to plug in
for easy commissioning
• DHW heating to a set temperature
• Digital VFD 2 - 40 Fast Grundfos Direct Sensor™
• Quick reaction to changes in the draw-off ow rate
• Circulation function (temperature-, time- and demand-controlled)
Technical data
Inputs: 3 inputs for Pt1000, 2 digital Grundfos Direct Sensor™ (VFD 2 - 40 Fast)
Outputs: 2 semiconductor relays, 1 PWM output
Switching capacity: 1 (1) A (100…240 V~) (semiconductor relay)
Total switching capacity: 2 A 240V~
Power supply: 100 ... 240V~ (50…60 Hz)
Supply connection: typeY attachment
Power consumption: < 1 W (standby)
Mode of operation: type 1.Y
Rated impulse voltage: 2.5 kV
Data interface: RESOL VBus®
VBus®current supply: 35 mA
Housing: plastic, PC-ABS and PMMA
Mounting: wall mounting, mounting into patch panels is possible
Indication/Display: System-Monitoring-Display
Operation: 3 push buttons
Ingress protection: IP 20/ EN 60529
Protection class: I
Ambient temperature: 0…40 °C
Pollution degree: 2
Dimensions: 172 x 110 x 46 mm
2 Installation of the controller
2.1 Overview
WARNING! Electric shock!
Upon opening the housing, live parts are exposed!
ÎAlways disconnect the device from power supply
before opening the housing!
ATTENTION! ESD damage!
Electrostatic discharge can lead to damage to electronic com-
ponents!
ÎTake care to discharge properly before touching
the inside of the device!To do so, touch a grounded
surface such as a radiator or tap!
Note
Connecting the device to the power supply must always be the last step
of the installation!
Note
It must be possible to disconnect the device from the mains at any time.
ÎInstall the mains plug such that it is accessible at any time.
ÎIf this is not possible, install a switch that can be accessed.
Do not use the device if it is visibly damaged!
Mains connection (100 … 240 V~) is to be carried out by means of the pre-con-
nected mains cable. Only qualied electricians may carry out electrical works. At-
tention must be paid to the valid local standards, regulations and directives!
Make sure the hydraulic system is properly grounded!