
3
COMMERCIAL AND SWIM-N-DUNK PARTS LIST
NOTE: Two in-deck plastic anchors (AS-100P) for concrete decks are required to install the game.
ASSEMBLY INSTRUCTIONS
1. Begin by locating the basketball posts and the cross
brace as shown in FIGURE 1. This is simpler if the
vertical posts are already inserted in the anchors and
standing upright facing away from the pool. Attach the
cross brace to the posts with the stainless steel split tees
and hardware as shown in FIGURE 2.
2. Insert a 3/8” x 3.5” button head cap screw through
each hole drilled in the top of the backboard frame and
through a black flange bushing, as shown in FIGURE 3. A
7/32” allen wrench will be needed for tightening the button
head screws.
3. Attach the backboard to the posts by inserting
the 3.5” button head screws through the top holes of
the posts as shown in FIGURE 3 and fastening with
the 3/8” lock nuts. Do not completely tighten at this
time. Do not place the black nut caps over the lock
nuts until later in the assembly process, after all the
final tightening has occurred.
1 SPG-101 Basketball Rim & Net (Net alone SPG-106) 1 ea.
2 05-627 Flanged Bushing For 5/16" HDWR 4 ea.
3 05-628 Flanged Bushing For 3/8" HDWR 2 ea.
4 SPG-100 Basketball Backboard 1 ea.
5 20-110 or
20-132 Basketball Post Assembly
Commercial Basketball Post Assembly 2 ea.
6 20-104 Basketball Post Cross Brace 1 ea.
7 2019061 Split Tee Half 4 ea.
8 2020049 3/8” x 2-1/2” Carriage Bolt 4 ea.
10 5-139 3/8” Hex Nut S/S 4 ea.
11 5-662 7/16” x 1” Flat Washer Stainless Steel 8 ea.
12 5-658 5/16” Hex Flange Nut Stainless Steel 4 ea.
13 5-656 5/16”-18 x 2” Hex Flange Bolt Stainless Steel 4 ea.
14 5-250 3/8” x 3.5” Button Head Cap Screw Stainless S. (7/32” Allen Wrench) 2 ea.
15 5-141 3/8” Nylon Lock Nut Stainless Steel 2 ea.
16 05-608 3/8” x 1” Nut Cap, Black 2 ea.
17 6-630 5/16” Dual Plastic Spacer 2 ea.
18 SPG-102 Basketball (not pictured) 1 ea.
19 SPG-103 Basketball Needle (not pictured) 1 ea.
20 05-32-111 3/8” Nylon Washer 4 ea.
FIGURE 2
(8) (7)
(10)
(7)
(3)
(15)
(16)