Sakura HBK-18?23DS Manual

Sakura Air Conditioner
User-friendly, Earth-friendly
Evaporative Air Cooler
(Operation / Installation / Service Manual)
HBK-18・23DS / B
Ref, S- 116 / 03 / 10
HBK-18・23AS / B HBK-18・23BS / B
LCD wall-pad remote controller
Hand-held remote controller

CONTENTS
1 . SAFETY PRECAUTIONS…………..………………………… 1
2 . PRODUCT INTRODUCTION………………………………… 1
3 . SPECIFICATIONS……………………………..……………… 2
4 . APPLICABLE RANGE………………………………………… 3
5 . OPERATING ENVIRONMENT…………………..…………… 3
6 . UNIT PARTS IDENTIFICATIONS………………….………… 4
7 . PACKING LIST……………………………………….………… 4
8 .SAFETY CAUTION…………………………………………..… 4
9 .CIRCUIT DIAGRAM…………………………………………… 6
10 .MAIN CONTROL BOARD………………..…………………… 7
11 .OPERATING INSTRUCTIONS……………..………………… 7
12 .INSTALLATION INSTRUCTIONS……………….…………… 8
13 .CLEANING AND MAINTENANCE…………....……………… 13
14 .TROUBLE SHOOTING………………………………………… 14
SAKURA – Total Air Conditioning Solution
Please read this instruction carefully before using
PAGE

1.Do not put your hand or other stuff in the air outlet of the operatin machine.Otherwise,it may cause injury.
2.Do not place heavy object on the unit,keep child away from the unit
3.Do not put gas cooker in the place which the unit can blow directly. Otherwise,it may cause carbon
monoxide poisoning.
4.Do not disassemble or modify the unit since the wrong operation may cause water leakage,fire or electric
shock.
5.Do add water from the water inlet of the unit
6.Do not install the unit in the place full of explosive and flammable materials.
7.When not using the unit for a long time,please drain the water tank of all the water.Then keep the unit
operating in fan mode for 10 minutes to dry the cooling pad,then turn off the power switch.
8.Always ensure effective earthing.
The environment friendly air conditioner has following advantages:
Power saving:it can save over 80% compared with traditional air conditioner Environment friendly:No
harmful material,no freon during operating. High Efficiency:Use the min.power to make the max cooling
and purifing effect. Working Principle:The evaporative air cooler produces effective cooling by combining a
natural process-water evaporation-with a simple,reliable air-moving system.Fresh outside air is filtered
through the saturated evaporative media cooled by evaporation,and circulated by a blower wheel. Water
from the bottom pan of the unit is pumped to the top and allowed to flow down over the evaporation cooling
pads of the spot cooler,evenly saturating the pads. Then a powerful blower pulls air through the
pads,forcing the water to evaporate which decrease the ambient temp.The cool air is then blown by the unit
at a high velocity where you direct the cool air to go.
1
SAKURA – Total Air Conditioning Solution
1 SAFETY PRECAUTIONS
2 PRODUCT INTRODUCTION

Outdoor air
Fan
Cold air
Water
pump
Evaporation
heat exchanger
Water tank
Sketch Map of Operating Principle
Model No.HBK-18DS/B HBK-23DS/B HBK-18BS/B HBK-23BS/B HBK-18AS/B HBK-23AS/B
Max Air Volume 18000m³/h 23000m³/h 18000m³/h 23000m³/h 18000m³/h 23000m³/h
Voltage/Frequency 380V/50Hz
Current 2.2A 2.8A 2.2A 2.8A 2.2A 2.8A
Power 1.1KW
Motor High efficient and waterproof type
Fan Type axial
Water Tank Vloume 25L
Dimension(mm) 1100×1100×950 1100×1125×950 1100×1100×1040
Net Weight 69kg 71kg 78kg
Applicable Area 80~100 m²
Air Outlet Size 670×670 mm
Noise ≥60dB ≥70dB ≥60dB ≥70dB ≥60dB ≥70dB
Water Consumption 5-20 L/H
2
SAKURA – Total Air Conditioning Solution
3 SPECIFICATION

Due to the features of evaporative air cooler,like cooling,humidifing,air exchanging,it's mainly
applicable for the places need to be cooling and ventilating,like:
1.Electronic,shoes,printworks,plastic,clothes,printing,packing factories,etc.
2.Texitle,machine,ceramics,chemicals,glasses,hardware,leather factories,etc.
3.Hospital,school,waitingroom,internetbar,shopping mall,supermarkets,etc.
4.Some public places like kitchen,vegetable market,clubs,parking lot,bus station,etc.
5.Greenhouses,flowers and fowl farm,etc.
6.The room which has requirements of high humidifing.
1.Ambient temp.: 2 ~ 45
2.Ambient humidity: ≤90%
3.Atmospheric pressure:86KPa~106Kpa
4.Water should be processed with softening,water temp. 0 ~ 45, water pressure 0.15~0.6Mpa
5.Input voltage should be within 10% of rated voltage
6.No corrosive gas around.
SAKURA – Total Air Conditioning Solution 3
4 APPLICABLE RANGE
5 OPERATING ENVIRONMENT

ITEM NAME QTY.
1 Evaporative Air Cooler 1
2 USER'S MANUAL 1
To provent injury to the user or other people or property damage,the following instructions must be
followed:
This symbol indicates CAUTION
This symbol indicates NEVER DO THIS
This symbol indicates ALWAYS DO THIS
4
SAKURA – Total Air Conditioning Solution
6 STRUCTURE CHART
7 PACKING LIST
8 SAFETY CAUTIONS

5
SAKURA – Total Air Conditioning Solution

No using in the environment of explosive and flammable meterials
Keep the unit working in a flat place
Make the air outlet&inlet not close to wall,curtain,etc.,it may affect the performance
Only authorised service technician are allowed for repair or maintenance
6
SAKURA – Total Air Conditioning Solution
9 CIRCUIT DIAGRAM

1.Connect with the power, and the unit will be in stand-by condition.
, and press to stop .
2.To cool the air, press
3.To ventilate, press , press to stop.
4.To clean the unit, press , press to stop.
.5.Under the condition of ventilation or cooling, if need swing function,press
Press it again to stop swinging.(This function could only be used in the existence of electric
swing).
1.After water inflow,water inlet and water level will be controlled by floater automatically.
2.After power on, the unit will be in stand-by condition.
3.After power on,press to run in cooling mode,fan will start after submerged pump run for
4. minutes;If any water shortage,fan will start without delay,and will be shinning.The
submerged pump start when water level reach to a normal status.Press to stop.
5.After power on,press to run in ventilation mode,and fan will start.If fan not
run,ventilation light will be shining after several seconds,this may be caused by lack of
phase,please cut off immediately and ask professional technician for maintenance.
6.After power on,press to run in clean mode.Drainage pump start and run for 2 minutes.
.
7.Under the condition of ventilation or cooling,if need swing function,press
Press to stop swinging.(This function could only be used in the existence of electric
stop operating,press
o binet to affect the operation.
lck the air inlet and air
11 r out of the tank,and
12 e filter.If using in the dirty
7
swing).
8.If need to
9.Do not put any o n the top of the cabject
10.During operation, make sure that there’s no any object to cover or bo
outlet.Do not put your hand or other object to the air outlet and air inlet.
.If not using the unit for a long time or in the winter,please drain the wate
keep the unit running for 10 minutes in ventilation mode,to dry the cooling pads.Then cut off
the power and cover the cabinet by diaphragm for next time using.
.Suggest to drain the water out of the tank every week and clean th
environment,please drain the tank for more times.
SAKURA – Total Air Conditioning Solution
10 MAIN CONTROL BOARD
11 OPERATING INSTRUCTIONS

. Installation Methods: 1
Installation Drawing for Down Discharge Unit
8
SAKURA – Total Air Conditioning Solution
12 INSTALLATION

Installation Drawing for Side Discharge Unit
9
SAKUR Total Air Conditioning Solution A –

Installation Drawing for Up Discharge Unit
10
SAKURA – Total Air Conditioning Solution

Mounting Bracket Planform
Mounting Bracket Side View
11
SAKUR Total Air Conditioning Solution A –

2
Make sure to read th
. Important Notice for Installation
e use instructions and carry out the work by strictly complying with the
sed space, the air outlet should be installed, so as to keep the balance of air outlet
(2)B
stalled horizontally, and the space between machine and wall
(3)
23DS/B,23BS/B and 23AS/B,it is better to install air pipe.
ameter should be
(4)
ir volume, so as to make the air volume of the branch pipe reach the
(5)I
(6)L ent is required for the air pipe. As for the down discharge model, four
air
(7)W
nce ladder shall be installed near the unit (the ideal material is stainless steel),
(8)W
s an burglar mesh is installed on the windowl, try to
(9)
rity out
project plan.
(1)The equipment is suitable to use in an open space. If it is required to install the equipment
in a clo
volume and air inlet.
efore installing the bracket of the air conditioner, the level line shall be fixed with level bar.
The bracket shall be in
should be between 280 to 330mm. (It varies from different locations).The indoor controller
shall be at least 1.5m above the floor, and the soldering and installation of mounting
bracket shall be stable. It shall be installed horizontally. The unit shall be installed
outdoors, and the dynamic load of the mounting bracket shall be more than 250kg. If the
bracket is installed 3 meters above the ground, it shall be added with guard rail. The water
supply pipe and drainage pipe shall be properly installed. The water supply pipe shall be
installed with pipe filer, so as to keep the incoming water clean. The drainage pipe shall
be kept unblocked, which shall adopt PVC pipe and be connected and installed with
speed glue.
It is not recommended to install air pipe for model no., 18DS/B,18BS/B and 18AS/B;While
for model no.
When installing air pipe,the length should be within 30 meters,and the diameter of pipe
should be changed by every 10 meters.For the first 10 meters,the di
800*500 MM,for the second should be 700*500 MM,for the third should be 600*500MM.
The area of airflow outlet shall not be less than 1m2, or the length and size of the air pipe
shall be made according to the design standard. After the air pipe enters the wall, the
airflow outlet shall be not less than 2.2 meters above the ground (excluding special
circumstances).
If there is branch air pipe, the air deflector must be installed on the branch pipe to regulate
or balance the a
design value.
f need low noise, the silencing elbows shall be used, so as to meet the requirement.
eak-proof treatm
10mm drainage vents shall be left on the bottom of the waterproof elbow. When the
pipe is connected to the room through the top of the building, leak-proof treatment is
required for the top building, so as to avoid the rainwater running into the room along the
air pipe.
hen the outdoor unit is installed on the wall without window or far from window, an
maintena
so as to facilitate the maintenance.
hen the outdoor unit is installed under the window, the glass window shall be movable,
o as to open it when necessary. If
install a movable door with lock on the burglar mesh in case of any maintenance.
Before testing the machine, check whether the water level is between the normal range. If
the water level is too high or low, please adjust the float ball. Pull the dust and impu
of the water pipe, check the power supply and if there is any leakage on the water
inlet/outlet pipe, then the testing can be started.
12
SAKURA – Total Air Conditioning Solution

Clean cooling pad
Disconnect the power,unscrew the 6 screws on the shutter,then pulls the shutter slightly,and
ke off the cooling pads assy.
ta
Attention:
Do not make too high water pressure,not use acidity or alkalinity detergent
◆ r tank
utton after power on and power off after 2 minutes
nnect power,unscrew the screws on the shutterand take off the shutter
Cle t
which easy to create bubble and
13
Clean wate
Method:
1. Press "drain" b
2. Disco
3. Clean the bottom with soft brush
4. Clean the dirt from the water level sensor
5. Clean the water pump,drainage pump and filter with brush
an he cabinet
Clean the cabinet with soft detergent(Do not use the detergent
hard brush)
SAKUR Total Air Conditioning Solution A –
13 CLEAN AND MAINTENANCE

Problem Possible causes What to do
Air cooler does not start
1.The air cooler is unplugged
2.Swithch button does not work
4.Too low voltage
1.Check the power
2.Replace the main control board
phase
4.Check the voltage
3.Check the
3.Lack of phase
1.Submerged pump broken 1.Replace the pump
Fuse blown frequent 2.Cooling pad or filter blocked 2.Clean pads or filter
flat place
kage
n
. Broken
flat place
k
utlet assy.
let assy.
ute assy.
1.Keep the unit in a
1. Unit not in a
2.Repair the water tan
2. Water tank lea
3.Replace the water o
3. Water outlet assy. Broke
Water leakage 4.Replace the water in
4. Water inlet assy.broken
5.Adjust the float ball
5. Water level exceed
6.Check the water distrib
6. Water distribute assy
7.Clean the pads
7.Dirty cooling pads
1.Replace the fan blade
Noise
ut of shape
h
1. Fan blade demaged or o
2.Replace motor
2. Motor abrasire
3.Clean the bolcks
3.T ere sundries block the airout
d or too low wind
ng pad or filter pads and filter
oard
amaged or not
1.Clean or replace
1. Blocking on cooli
2.Replace main control b
2. Main control board damage
3.Check if motor d
3. Motor no working
No win
4.Check the phase
4.Lack of phase on motor
1.Add water
1. Lack of water
Air cooler does not cool as it
should
m
aged
ing
broken
trol board
in control board
2.Check water level sensor
2. Failure on water control syste
3.Replace submerged pump 3. Drainage pump dam
4.Replace main con
4. Cooling button no work
5.Replace ma
5.Main control board
White precipitate in cabinet ate1.Mineral substance exceed normal r 1.Increase drainaging rate
and filter
14
SAKURA – Total Air Conditioning Solution
14 TROUBLESHOOTING
SAKURA CORPORATION
Tel: (81)45-949-8550 Fax: (81)45-949-8551 E-mail: [email protected] URL: www.sakura-aircon.com
This manual suits for next models
11
Table of contents
Other Sakura Air Conditioner manuals