
FIELD CUT RISER (24 SERIES)
INSTALLATION GUIDELINES
Tools needed: 7/16" Nut driver tool/bit (included), marker
(included), tape measure and drill with 1/2" chuck. Jigsaw,
circular saw or reciprocating saw will be needed if risers need
to be cut.
NOTE: To remove a component or adjust its position, the
Upper Band Clamp needs to be loosened or removed using
nut driver bit. The Lower Band Clamp is factory set and
should not be removed. For proper fastening ensure clamps
are tightened to 5 - 8 ft lbs. of torque (same as a rubber
no-hub coupling) prior to installation.
Riser Assembly Instructions/Steps
1. Set unit so the pipe connections line up with job site
piping and measure riser height needed from top of cover
to finished grade. See Table 1 to select risers needed.
2. Remove covers from adapters. Remove adapters from
main unit. On a level surface, pre-assemble the risers and
adapters, adjusting the components upwards or
downwards to achieve the riser height needed. Make sure
to maintain minimum and maximum insertion depths as
shown in Figure 2. If components are too long, make a
circular line around the sidewall with marker and cut with
a power saw. The lowest cut line on the riser assembly will
be 6" beyond the riser height needed to allow for ideal
insertion depth (See Figure 1). An alignment mark should
be drawn 2" beyond the riser height needed which will
align with the top of the base unit gasket. DO NOT cut the
alignment mark. The Adapters and risers should sit level
with each other. Tighten upper clamps to keep
riser/adapter assembly from shifting. Make alignment
marks on the sidewalls at the top of all riser gaskets to aid
final assembly.
3. IMPORTANT: Before the next step, make sure both
diffusers are installed inside the main unit at the
appropriate locations. Check if there needs to be any flow
contropl adjustment at the inlet diffuser (see general
installation instructions).
4. Take apart riser assembly and clean all sidewalls and
insides of gaskets to remove dust/debris. Install
components into the main units starting from the lowest
riser and work your way up to finished grade. Ensure that
riser will not interfere with diffuser, allow min. 1" clearance.
Maintain minimum and maximum insertion depths for all
components (see Figure 2). Tighten Upper Clamps to specified torque after correctly positioning components. Riser assembly may need to
be supported during backfill.
5. If tilting of the adapter is required to be flush with grade, do so AFTER all clamps have been tightened with riser(s)/adapter in a vertical and
level position. Tilting is done using gasket flexibility. Tilting before tightening clamps may ruin a perfect gasket seal. Schier recommends
tilting only the adapter versus the entire riser assembly to make sure your riser height and proper tank access is maintained.
6. If riser height conditions change after completing above steps, there may be room for adjustment. As long as minimum and maximum
insertion depths are maintained (see Figure 2), the adapters/risers can be adjusted/cut as many times as necessary.When riser system
installation is complete, see Leak/Seal Testing procedure if required (pg 3 of 6).
Table 1
Riser Height Needed Risers Required
0 - 3-1/2" None (use adapter)
5" - 23" SR24
>23" - 38" LR24
Riser
Height
Needed
Adapter
Riser
Cut Line
Alignment Mark
6"
2"
4"
LR24
Long Riser
Adapter
SR24
Short Riser
Cover
Gasket
Field Cut Riser
Components
Figure 1 - Riser Measurements
Figure 2 - Insertion Depths
2-1/2" Minimum
Insertion Depth
4" Maximum Insertion Depth
(into GB unit only)
Adapter (shown)
or Riser
Upper Band Clamp
(field adjustable)
Lower Band Clamp
(factory set - do not
adjust or remove)
GB Unit (shown)
or Riser
INSTALLATION
Page 6 of 7
GB-50 Installation Guide