Schier GB-50 User manual

Contents
Special Precautions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-3
Getting to Know the GB-50 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4
Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-10
INSTALLATION GUIDE
GB-50 50/75 GPM Great Basin™Indoor/Outdoor Grease Interceptor
913-951-3300 | schierproducts.com
© Copyright 2023 Schier Products Company, 01/01/23
LIFETIME GUARANTEED GREASE INTERCEPTORS

Schier | GB-50 Installation Guide
page 2 of 10
Install interceptor as close as possible to
fixtures being served
SPECIAL PRECAUTIONS
Do not install this unit in any manner
except as described in these instructions.
Doing so may result in property damage, personal injury or death.
DO NOT AIR TEST UNIT OR RISER SYSTEM!
For Schier Grease Interceptor Installations - Failure to follow this guidance voids
your warranty
Installation Instructions
Installation instructions and additional
components are included with the interceptor.
Read all instructions prior to installation. This
interceptor is intended to be installed by a
licensed plumber in conformance with all local
codes.
High Temperature Kitchen Water
If water is entering the interceptor at excessive temperature (over 150º F), a
drain water tempering valve (DTV) and approved backflow prevention assembly
must be installed. Most state and local plumbing codes prohibit water above
150º F being discharged into the sanitary sewer. Water above 150º F will
weaken or deform PVC Schedule 40 pipe, poly drainage fixtures like
interceptors and erode the coating of cast iron (leading to eventual failure).
ODOR ALERT!
Interceptor is not a
sewer gas trap.
All upstream fixtures
must be trapped
ODOR ALERT!
Do not install air
gap on outlet side
of interceptor.
Provide at least 12" clearance
above unit for routine
maintenance.
12" min.
Fully Support Base of Unit
Install unit on solid, level surface in contact with
the entire footprint of unit base
When Installing
Interceptor Inside
If your dishwashing sink(s)
discharges into a floor
drain/sink (drain), you may
regulate the flow into the drain
to avoid an overflow of water
onto the kitchen floor. This can
be done by installing a valve or
flow restriction cap on the sink
piping that discharges into the drain. See drawing for guidance. For detailed
guidance on indirect connections, go to:
webtools.schierproducts.com/Technical_Data/Indirect_Connections.pdf
Fernco or similar
rubber flow
restriction end
cap
Support Inlet and Outlet Piping
For above grade installations ensure heavy
inlet and outlet piping (such as cast iron or
long runs) is properly supported or
suspended during the entire installation
process to prevent connection failure or
damage to bulkhead fittings.
pipe supports

Schier | GB-50 Installation Guide
page 3 of 10
DO NOT USE CAST IRON
COVERS IN ABOVE GRADE OR
INDOOR INSTALLATIONS
Use composite cover C24BC for above
grade installations
SPECIAL PRECAUTIONS
For Schier Grease Interceptor Installations - Failure to follow this guidance voids your
warranty
High Water Table Installations
Interceptors and risers are not designed
to withstand water table height in
excess of the top of the unit when
buried (see figure). If it is possible for
this to occur, install the interceptor and
risers in a water-tight concrete vault or
backfill with concrete or flowable fill (wet
concrete and flowable backfill should
be poured in stages to avoid crushing
the interceptor). At risk areas include
but are not limited to tidal surge areas,
floodplains and areas that receive storm
water. Great Basin™models that are direct buried in high water table scenarios must
be installed with an anchor kit. Model GB-50 uses model AK1 anchor kit.
max water table height for
direct burial
model AK1
anchor kit
Suspended Installations
Design trapeze to support the wet weight
of the unit. Do not partially support unit or
suspend unit using metal U-channel to
create a trapeze.
concrete floor
Hydrostatic/
Pressure Slabs
When installed under a
hydrostatic slab (slab designed
to withstand upward lift, usually
caused by hydrostatic pressure)
interceptor must be enclosed in
a watertight concrete vault.
concrete slab subject to hydrostatic pressure
watertight
concrete
vault
DO NOT
COMPACT BACKFILL
MECHANICALLY
Compact by
hand only
Below Grade Installation Slab Requirements
A concrete slab to finished grade with rebar is required when installing
interceptor below grade.
Pedestrian Trac or
Greenspace Areas
Vehicular Trac Areas
4" min. slab 8" min.
slab
RebarRebar
Max Water Level
Risers are not designed
to retain water
Installations with Risers
Corrugated Riser Pipe
Requirements
Riser adapter model CA2 must be used
when installing interceptors using 24"
diameter corrugated pipe as a riser.
This will adequately embed the cover
adapter in the concrete slab, preventing
cover/cover adapture failure under
trac rated loads.
CA2
6 - 94"6 - 94"
94"94"
3 FCR2 Risers Max
Secure Cover Adapters
Cover adapters must be secured to
base units in above grade installations
with increased head pressure
conditions. Use cover adapter tie-down
kit model ATD1.

GETTING TO KNOW THE GB-50
1. Pickable cast iron cover (standard)
2. Cover gasket
3. Safety Star® access restrictor
4. Safety Star® tether
5. Cover adapter
6. Cover adapter gasket assembly with
upper and lower stainless steel band
clamps
7. 4" cleanout plug (x2)
8. Outlet bulkhead connection (optional) 4"
FPT (x2)
9. Bulkhead connection gasket
10. Bulkhead connection retaining nut
11. Inlet diuser cover (white)
12. Inlet diuser
13. Inlet diuser retaining nut
14. Inlet diuser foot retaining nut
15. Inlet diuser (foot)
16. Inlet bulkhead connection 4" FPT
17. 4" plain end fitting (x2)
18. Composite cover bolts
and washers (x4)
19. Bolted composite cover (optional)
20. Air relief/visual access
21. Outlet diuser retaining nut
22. Outlet diuser
23. Outlet diuser foot retaining nut
24. Outlet diuser (foot)
25. Outlet bulkhead connection (standard)
4" FPT
26. 7/16" nut driver bit
1 18
19
20
21
22
23
24
10
9
8
7
2
3
5
6
7
8
9
10
13
12
11
14
10
9
16
17
26
4
10
17
9
25
15
Schier | GB-50 Installation Guide
page 4 of 10
Inlet diuser
cover (white)

Schier | GB-50 Installation Guide
page 5 of 10
1a 1b
1c
Have a Leak?
Call customer care at 913-951-3300
Hours 8am-5pm CST, M-F
1Test tank for water tightness
Cap all connection points with 4" cleanout plugs using
pipe thread sealant or tape approved for use with
plastics.
Remove covers. For base unit testing fill with water to just
above the highest connection.
Inspect unit, connections and gaskets for leaks. Check water
level at specific time intervals per local code.
Fill Line
Excavate hole at least 12" larger than interceptor on all sides and 6" deeper than tank bottom. Lay a level bed of well-packed,
crushed aggregate (approximately 3/4" size rock or sand, with no fines) in the base of hole.
12" 12"
6" 6" or more
2 Excavate Burial Pit

Schier | GB-50 Installation Guide
page 6 of 10
3 Set Up Outlet Diuser and Install Cleanout Plugs
Screw in provided 4" cleanout plugs using pipe thread sealant or
tape approved for use with plastics. Do not cap the inlet or outlet
connections attached to the diusers.
3a Choose outlet location.
3b Reposition outlet diuser (side outlets only)
3c Cap unused connections(all configurations)
Side Outlet:
Go to Step 3b.
Straight
Through:
Go to Step 3c.
Remove safety star insert, leave tethered to unit. Unscrew diuser retaining nut and remove outlet diuser.
Unscrew diuser foot retaining nut and remove outlet diuser foot. Rotate diuser toward chosen outlet, replace
foot ensuring it will point to the back wall of the unit and hand tighten foot retaining nut. Insert diuser into chosen
outlet and hand tighten retaining nut.

This unit is supplied with a white inlet diuser cover to
prevent the unit from swamping in high flow/ increased head
pressure conditions.
• If dimension "A" is 13 feet or less, the inlet diuser cover is
not needed, go to Step 5, Connect Piping.
• If dimension "A" is more than 13 feet, or a high flow/in-
creased head pressure condition exists, follow Steps
below.
4 Install Inlet Diuser Components
Schier | GB-50 Installation Guide
page 7 of 10
Remove Safety Star® insert and remove inlet diuser cover from the parts bag. Slide inlet diuser cover into
top of inlet diuser and rotate clockwise until cartridge drops onto inlet diuser cover retainer pins.
Continue rotating clockwise until pins are fully seated.
inlet diuser cover
retainer pin
cartridge receiver
slot
4a Install inlet diuser cover
For easy inlet diuser cover removal
in deep burial installations, 1-1/2"
PVC SCH. 40 pipe may used as an
extension handle. Before risers
have been installed, cut pipe to
length and attach to top of cover
using PVC primer/cement.
Extension handle length should be
about 12" shorter than total riser
height.
4b OPTIONAL: install extension handle
Finished installation
showing optional
extension handle

Schier | GB-50 Installation Guide
page 8 of 10
5a Install plain end fittings
5b Connect interceptor to drain lines
5 Connect Piping
4" Plain End
Screw plain end fittings (included) into bulkhead fittings using pipe thread sealant or tape approved for
use with plastics. 6" connection types come pre-installed from the factory.
Place unit into final position and set level. Mechanically couple inlet and outlet drainage lines to unit. Do not
solvent weld. Ensure all upstream fixtures are trapped. Vent per local code. Installation of 2-way cleanout tees to
grade (by others) is recommended for buried installations.
Outlet
2-way
cleanout tee
Inlet
BURIED INSTALLATION
COUPLING DETAIL
Drain line
Flexible coupling
Plain end fitting
Bulkhead fitting
4" FPT4" FPT
Kitchen floor
Add this vent if unit is installed one
or more floors below the fixtures
being served
Vent per local code
FLOOR BELOW INSTALLATION

6 Wet or Air Test Piping Per Local Code
Doing so may result in property damage, personal injury or death.
DO NOT AIR TEST UNIT OR RISER SYSTEM! Have a Leak?
Call customer care
at 913-951-3300
Hours 8am-5pm CST, M-F
Schier | GB-50 Installation Guide
page 9 of 10
7 Bring Covers Flush-to-Grade
The GB-50 is ready for burial depth of 28-1/2" from finished grade to bottom of tank (or 10-1/2" to centerline of inlet).
Deeper burials will require extending the cover adapters and possibly adding risers.
Measure dimension X to determine riser height needed.
7a
See instructions included with FCR2.
Loosen the cover adapter upper band clamp
using 7/16" nut driver bit. Adjust cover adapter
heights as needed. Maintain a minimum
2-1/2" insertion depth. Tighten upper band
clamp to 5 -8 ft. lbs. of torque using 7/16" nut
driver bit. If required, cover adapters may now
be tilted up to 10º in any direction using gasket
flexibility.
7c Make final cover adapter adjustments
7b Install risers if required
COVER ADAPTER ADJUSTMENT DETAIL
2-1
/
2" minimum
Cover
Safety Star
access restrictor
Cover adapter
Gasket
Upper band clamp
Lower band clamp
Interceptor accessway
Riser Height Risers
Needed Required
0" - 4" None (use adapter)
>4" - 34" FCR2 (x1)
>34" - 64" FCR2 (x2)
>64" - 94" FCR2 (x3)

DO NOT COMPACT BACKFILL
Schier | GB-50 Installation Guide
page 10 of 10
8 Install Anti-Flotation Anchor Kit
9 Backfill and Finished Grade
Fill unit with water for stabilization and float-out prevention. Backfill evenly around tank using crushed aggregate (approximately 3/4" size
rock or sand with no fines)or flowable fill. Do not compact backfill around unit.
9a Backfill
If the installation location is in a high
water table or at risk area (including but
not limited to tidal surge areas,
floodplains and areas that receive storm
water) the GB-50 must be installed with
Schier model AK1 anchor kit.
Max water table height for direct burial
Vehicular Trac Areas:
Minimum 8" thick concrete slab with rebar required. Thickness of concrete around covers to be determined by
specifying engineer. If trac loading is required the concrete slab dimensions shown are for guideline
purposes only. Concrete to be 28 day compressive strength to 4,000 PSI. Use No. 4 rebar (ø 1/2") grade 60
steel per ASTM A615: connected with tie wire. Rebar to be 2-1/2" from edge of concrete and spaced in a 12"
grid with 4" spacing around access openings.
Pedestrian Trac or Greenspace Areas:
Minimum 4" thick concrete slab with rebar required.
9b Pour concrete slab to finished grade
Rebar
Model AK1 anchor kit
TOP VIEW 18"
min
45º
18"
min
18"
min
18"
min
Concrete slab
Rebar
Other manuals for GB-50
2
Table of contents
Other Schier Plumbing Product manuals

Schier
Schier GB-1000-L User manual

Schier
Schier GB-500-500HF User manual

Schier
Schier GB-500 User manual

Schier
Schier GB-500-B User manual

Schier
Schier SI-75 User manual

Schier
Schier GB-500-500HF User manual

Schier
Schier GB-250 User manual

Schier
Schier GB2 User manual

Schier
Schier FCR2 User manual

Schier
Schier SI-250 User manual