16
START-UP
START-UP CYCLE
1. Open the water tap/valve and switch ON the
power on the electrical supply line.
2. The models NW 458, 608
enter in the Start Up mode with
the PC Board energized as well
as the Green LED of the
machine under power while the
models NW 1008 enter in 90
minutes delay time controlled by
a special Start-up Delay PC
Board.
The Green LED of machine in
operation is energized too,
blinking fast for 40 seconds.
3. During the Start Up cycle the
components in operation are:
• Hot gas valve
• Water Drain Valve
• Water Pump
FREEZING CYCLE
1. After the Start Up cycle the machine enters
directly into the Freezing cycle with the
following components energized:
• Water Inlet valve
• Compressor
• Fan motor (in continuous operation for the
first 3 minutes).
2. The LED energized are:
• Machine under power
• Machine in operation (steady)
3. Water is coming into the water through the
Water Inlet Solenoid Valve till the water
reservoir if filled up to the maximum level
controlled by a Water Level Sensor.
4. 30 seconds later, the Water Pump starts up.
5. After few minutes (3-5) from the start up of
the freezing cycle, the Water Inlet Solenoid
Valve is activated again for few seconds to re-
fill the water reservoir up to the maximum level
so to reduce any possibility of slush ice
formation.
6. In the meantime the condenser sensor
starts to transmit the current to the PC Board
keeping in operation the Fan Motor in ON-OFF
mode or continuously according to the
condenser temperature.
7. The machine remains in the freezing cycle
with the ice that become thicker till the two
metal plates of the Ice Thickness Sensor are
covered by the water cascading through the
front surface of the ice plate.
8. When the Power is transmitted back to the
PC Board continuously through the metal
plates of the Ice Thickness Sensor for more
than 6", the machine enters in the Pre-Harvest
or directly into the Harvest Cycle mode
according to:
• FAN MOTOR IN ON-OFF MODE DURING
THE PREVIOUS FREEZING CYCLE
RISE UP THE CUT IN TEMPERATURE OF
THE CONDENSER SENSOR TO 38 C (FAN
MOTOR OFF) AND EXTEND THE LENGTH
OF FREEZING CYCLE BY 30" MORE THEN
GO INTO HARVEST CYCLE
• FAN MOTOR ALWAYS IN OPERATION
DURING THE PREVIOUS FREEZING CYCLE
GO STRAIGHT TO THE HARVEST CYCLE
9. First freezing time will range between 15
and 20 minutes. Longer time for temperature
NOTE: Do not remove the evaporator
deflector cover as it will cause the switching
off of the machine at "STORAGE BIN
FULL".
NOTE: The models NW 1008 is equipped
with a compressor crankcase heater and a
Start up Delay PC Board set up at 90
minutes. During the first 90 minutes only
the compressor crankcase heater is
energized warning up the compressor.