PLEASETICK APPROPRIATECOLUMNFOREACHITEM UNDERTAKEN
Dealer pre customer delivery / installation / commissioning
Checks OK
Adjusted
Ensure the Cubicle bedder is correctly mounted to the tractor or handler.(see
section 2.4)
Check hydraulic flow on the tractor or handler to ensure the optimum size
conveyor motor is fitted.
Ensure the hoses are not taught when the Cubicle bedder is connected to the
prime mover vehicle.
Check the agitator tine configuration suits the recommended setting for the
material being spread.(see section 5.14)
Check the internal metering plates are set at the recommended distance for the
material being spread.(see section 5.13)
Lubricate all grease points.(see section 7.1)
Check hydraulic system for leaks.
Check operation of hydraulic services.
Ensure that all safety guards & decals are fitted.
Check paintwork & finish.
Check in general that nuts & bolts are tight.
Ensure that an Operator’s manual is supplied with the machine.
Additional Comments:
Dealer Representative’s Name:
Date:
Customer Instruction
Actioned
Explain the correct setting & operation of the machine to the customer.
Ensure the maintenance schedule is explained to the customer.
Ensure all spare agitator tines are handed to the customer for storage.
Ensure the lubrication & grease points are indicated to the customer.
Ensure all safety precautions & safety signs are explained to the customer.
Ensure the warranty policy is explained to the customer.
Ensure that the operator’s manual is handed to the customer.
Additional Comments:
Dealer Representative’s Name:
Date:
For specific details please refer to the operator’s manual
Dealer’s pre-delivery/installation check
IMPORTANT
All items listed on the left must be checked, and adjusted if necessary. The person conducting the
inspection should tick each item in the space provided, indicating whether or not adjustments were
required. In the event of additional work being needed, details should be given in the additional work /
discrepancy box, located at the bottom of this sheet, or on a separate sheet if required.
When the inspection is complete, THIS FORM MUST BE COPIED & RETURNED TO:- Shelbourne
Reynolds within 30 days of delivery to customer, otherwise the invoice date to the dealer will be
deemed to be the start date for the warranty period.
Dealer Pre-delivery / Installation check and warranty registration –Cubicle Bedder
Additional work / discrepancies:
SERIAL NUMBER: ______________________ MACHINE NUMBER: ________________________
MODEL: _______________________________
This page must be faxed or e-mailed to Shelbourne Reynolds Engineering ltd.
Dealer signature: _________________________________________________________________
Print Name: _________________________________________Date: ________________________
Customer’s Signature: _____________________________________________________________
Print Name: __________________________________________Date:_______________________
The customer’s signature certifies that the machine was delivered in a satisfactory condition
and that adequate instruction was received as to its correct operation, safety requirements,
and maintenance as stated in the operator’s manual, and that the customer has read,
understood, and agrees to the Terms and Conditions of Sale and Warranty (including the
disclaimers and limitations) contained in Section 1.5 of the operator’s manual.
Dealer Name:___________________________________________________________________
Address:_______________________________________________________________________
_____________________________________________ Post / Zip code: ____________________
Dealer Salesman Name:___________________________________________________________
Customer Name: _________________________________________________________________
Business Name (if different from above):_______________________________________________
Address:________________________________________________________________________
_______________________________________________________________________________
_____________________________________________Post / Zip code:_____________________
Email Address:___________________________________________________________________
Tel No. Home / Office:__________________________ Cell / Mobile:_________________________
Issue 1 21/03/2016


Dear Customer,
Parts manuals are not supplied with this machine, but they can be ordered from your
Shelbourne Reynolds dealer. Alternatively they can be downloaded from the Shelbourne
Reynolds website www.shelbourne.com by clicking on the Parts and Service section of the
website, and then selecting manuals followed by Cubicle Bedder Manuals.
The Machine and Parts Manual Number for your machine is -
Tick
Machine No.
Manual No.
Machine Description
269902 01
MAN-13000
Cubicle Bedder 100
269902 02
MAN-13000
Cubicle Bedder 150
269902 03
MAN-13000
Cubicle Bedder 300
269903 02
MAN-13000
Cubicle Bedder 150 (Straw Rotor)
Cubicle Bedder Serial Number
ORDERING SPARE PARTS
To ensure that you order the correct part from your SRE dealer please use the following
procedure.
ALWAYS QUOTE THE MACHINE AND SERIAL NUMBERS WHEN ORDERING.
Refer to the Parts Manuals front page/s, listing the machine numbers. Select the correct
machine number which is printed in the top left corner of the page (starting with 2699_
_01).
The machine number is listed above or can be found printed on the identification plate,
which is located on the rear of the tub.
Scan down the page, and select the relevant sub assembly your required part falls within.
Sub-assemblies start from 2690_ _ 01. Note the year or serial number of the machine may
determine a correct sub assembly if more than one is listed.
Continue through the manual and find the relevant sub assembly parts listing. Again the
number will be printed in the top left corner; the sub-assemblies are in numerical order.
Having found the correct parts list, you will find the corresponding drawing by either looking
at the facing page or progressing through the manual to the next drawing.
The drawings indicate the components by item numbers, which you will find, are repeated
in the left-hand side of your parts listing, and therefore referring to the correct part.
Please note that if certain parts cannot be found listed below the sub-assembly numbers,
they are likely to form part of a specific optional kit. These kits will be found in numerical
order further through the manual and start with KIT- _ _ _ _ _
CUB
This manual suits for next models
2
Table of contents
Other Shelbourne Farm Equipment manuals
Popular Farm Equipment manuals by other brands

Schaffert
Schaffert Rebounder Mounting instructions

Stocks AG
Stocks AG Fan Jet Pro Plus 65 Original Operating Manual and parts list

Cumberland
Cumberland Integra Feed-Link Installation and operation manual

BROWN
BROWN BDHP-1250 Owner's/operator's manual

Molon
Molon BCS operating instructions

Vaderstad
Vaderstad Rapid Series instructions