Skipper DB-100-SA User manual

SKIPPER Electronics AS
Enebakkveien 150 www.skipper.no
P. O. Box 151, Manglerud E-mail: support@skipper.no
0612 Oslo, Telephone: +47 23 30 22 70
Norway Co. reg. no: NO-965378847-MVA
Document no: DM-BDB100
Rev 2013
Date: 2020-03-25
100mm
Double Bottom Sea Valve
Installation and operation Manual
DB-100-SA
DB-100-SB

Page 2 of 23 Date: 2020-03-25
SKIPPER Electronics AS DB-100-SB Operation and Installation Manual
Weitergabe sowie vervielfältigung dieser unterlage,
verwertung und mitteilung ihres inhaltes nicht gestattet,
soweit nicht ausdrücklich zugestanden. Zuwiderhandlungen
verpichten zu schadenersatz.
Toute communication ou reproduction de ce document,
toute exploitation ou communication de ou son contenu sont
interdites, sauf autorisation expresse. Tout manquement à
cette règle est illicite et expose son auteur au versement de
dommeges et intèrèts.
Copying of this document, and giving it to others and the use
or communication of contents thereof, are forbidden without
express authority. Oenders are liable to the payment of
damages.
Sin nuestra expresa autorización, queda terminantemente
prohibida la reproducción total o parcial de este documento,
asì como su uso Indebido y/o su exhibición o comunicación
a terceros. De los infractores Se exigirá el correspondiente
resarcimiento de daños y perjuicios.

Page 3 of 23 Date: 2020-03-25
Contents
1. INTRODUCTION........................................................................................................................4
2. SPACE CONSIDERATIONS.....................................................................................................6
Space considerations DB-100-SB............................................................................ 6
Space considerations DB-100-SA............................................................................ 7
3. INTERMEDIATE TUBE............................................................................................................8
4. BLANKING PLATE....................................................................................................................9
5. WELDING THE BOTTOM FLANGE...................................................................................10
6. SEA VALVE ASSEMBLY .........................................................................................................12
7. ASSEMBLING OF FIRST EXTENSION TUBE AND SENSOR......................................13
8. SENSOR INSTALLATION......................................................................................................14
9. CLAMP UNIT MOUNTING....................................................................................................15
10. EXTENSION TUBE MOUNTING ORDER .......................................................................16
11. FINAL ASSEMBLY .................................................................................................................18
12. SENSOR REMOVAL...............................................................................................................19
13. RE-INSTALLATION...............................................................................................................20
14. PART LIST ................................................................................................................................21
DB-100-SB............................................................................................................. 21
DB-100-SA............................................................................................................. 22
DB-100-SB-M-KIT................................................................................................ 23
SKIPPER Electronics AS DB-100-SB Operation and Installation Manual

Page 4 of 23 Date: 2020-03-25
SKIPPER DB (Double Bottom) Sea Valve 100 mm
1. Introduction
The SKIPPER DB Sea Valve 100 mm is used for installation of SKIPPER speed log sensors and echo
sounder transducers tted with adaptor for XB-100-XX.
DB-100 is available in two versions:
DB-100-SA. Main element being gate valve type.
DB-100-SB. Main element being ball valve type.
The installation procedure is the same. The DB-100-SB is however higher than DB-100-SA so the space
consideration is dierent.
Caution!
Be aware that the Sea Valve contains high precision parts and therefore proper
handling when mounting is essential for the nal result.
When handling the Sea Valve, all lifting devices must be attached on the outside of the
valve. It is very important to not insert any chains, wire, rope or any other device into
the valve chamber. This to avoid damaging and any kind of pollution of the Sea Valve.
Caution must be taken when mounting seavalves that all parts are aligned correctly, and that the inside is
clean. DO NOT use liguid sealants, and DO NOT paint the inside of a valve.
The SKIPPER DB Sea Valve 100 mm is delivered partly assembled for transport. The parts necessary for
nal assembly will be found packed in a box delivered with the Sea Valve. First of all, it must be decided
where the Sea Valve should be installed. Normally, this will be in the fore part of the ship, in the centerline,
or as close to the centerline as possible. Optimal system operation is achieved by tting the transducer/
sensor as deep as possible on the hull.
• The active surface of the sensor must be installed with front face a maximum of +/-1 degree to the ships
horizontal plane. (Speed Logs).
• The active surface of the transducer must be installed with front face a maximum of +/-7 degree to the
ships horizontal plane. (Echo Sounder).
Do not mount transducers close to the bow thruster propeller outlets, or aft of other hull installations (outlets,
vents or other protruding details) who may create aeration or turbulence.
It is necessary to select a part of the hull that is submerged and free from turbulence and aeration under all
load and speed conditions, and to avoid positions where air is trapped in heavy weather.
If a at, horizontal section is not available for transducer tting, the shipyard must construct a suitable bed.
Welding seams in this area should be smoothed and rounded o, in order not to create turbulence or aeration
at speed.
SKIPPER Electronics AS DB-100-SB Operation and Installation Manual

Page 5 of 23 Date: 2020-03-25
Protect the active element of the transducer/sensors during transport and installation, and
do not paint the surface.
The Sea Valve should be placed in a service accessible place, large enough for installation and disassembly
of the sensor unit. See drawing: “Space considerations”.
Important
Sensors for Speed Log and Echo Sounder are delivered with a xed cable. Needed attention must be
taken to allow easy replacement/pulling of new cable during maintenance.
SKIPPER Electronics AS can help recommend installation positions if GA-drawings (General
arrangements), lines drawings and frame drawings are made available for study.
Condition.
The welding to hull structures and structural support of the items may be subject to separate approval by
classication societies for each installation on board a ship.
Note: All “Item (X)” references on the following pages, can be found on the drawing “100 mm Double
Bottom Ball Valve” .
SKIPPER Electronics AS DB-100-SB Operation and Installation Manual

Page 6 of 23 Date: 2020-03-25
The Sea Valve should be placed in a service accessible place large enough for installation and disassembly
of the transducer/sensor unit.
2. Space considerations
72 35
380
200
190
Space considerations DB-100-SB
SKIPPER Electronics AS DB-100-SB Operation and Installation Manual

Page 7 of 23 Date: 2020-03-25
Space considerations DB-100-SA
180
0
54
226
377
597
Max. 446
Min. 1600 free height
E
F
C
1
2
3
4
B
A
3
2
1
5
C
D
4
6
7
8
A
B
D
E
ISO2768m
1 : 8
Gen. tolerance
Eur. projection
N/A
Material
2020.01.29
Checked by
XX-XXX XX
Date
CN
Drwg. no.
Name
GT 2020.01.31
Edition date
Sheet
03
Revision
DB-100-xA Dim
Scale
Outline Dimensions
1 of 1
Designed by - date
TLO
ST 2020.01.29
Approved by - date
Electronics AS
SKIPPER Electronics AS DB-100-SB Operation and Installation Manual

Page 8 of 23 Date: 2020-03-25
3. Intermediate Tube
A
A
139,7
-
0
1,4
113 max.
155 max.
27
+
0,1
0
27
+
0,1
0
90°
±0,5°
90°
±0,5°
139,7
-
0
0,3
Depend on Bulkhead level
Real view
Scale: 1 : 20
ID: Max. 113mm Min.108mm
* Yard supply
Surface treatment: Red Industrial primer
Flugger 1240 or equal
Basic tube measurements:
OD: Max. 155mm Min.138,5mm
Minimum wall thickness: 12mm
C
2
3
1
4
B
A
D
E
F
Approved by - date
VF 2008.09.10
ST
Designed by - date
1 of 1
Intermediate Tube
Scale
DB-2029
Revision
01
Sheet
Edition date
GT 2015.07.02
Name
Drwg. no.
CN
Checked by
2015.07.01
Material
Steel DIN17121/St52.3N or equal
Eur. projection
Gen. tolerance
1 : 3
ISO2768m
Electronics AS
SKIPPER Electronics AS DB-100-SB Operation and Installation Manual

Page 9 of 23 Date: 2020-03-25
4. Blanking plate
SKIPPER Electronics AS DB-100-SB Operation and Installation Manual

Page 10 of 23 Date: 2020-03-25
5. Welding the bottom ange
• When the position has been decided, a hole for the 170 mm bottom ange is cut in the hull, and a 200
mm hole is cut in the bulkhead (tanktop).
• The bottom ange, Item (1) is welded into the hull. Standard welding practice, methods and procedures
should be observed, but may vary. (See welding notes).
WELDING NOTES!
All bottom parts and anges for welding are precisely machined parts. During welding of these parts
to the ship’s hull plates, careful attention must be paid to avoid construction strain on the bottom
parts and anges.
• Let parts cool down during welding.
• Over heating may change t and form and result in non-conformity with intended sensor/
transducer.
• Welding to thick hull steel plates will exert high stress on bottom parts and anges.
• Especially care must be taken during welding of stainless steel anges.
• Work must be performed by a qualied and certied welder.
Attention:
The bottom ange is a part of the Sea Valve that is machined with high accuracy and it should be
protected after mounting to avoid damage to the bottom ange surfaces. This to avoid leakage. If the
valve is pre-mounted, be sure to protect the valve from being polluted by welding debris.
SKIPPER Electronics AS DB-100-SB Operation and Installation Manual

Page 11 of 23 Date: 2020-03-25
6
8
8
6
• Intermediate ange Item (11) is welded into intermediate tube Item (10). (*Yard supply). Standard welding
practice, methods and procedures should be observed. (See welding notes).
• Blanking plate Item (9) (*Yard supply) is placed over the 200 mm hole in the bulkhead.
• Intermediate tube Item (10) is tread into the blanking plate Item (9) and through the 200 mm hole in the
bulkhead.
• Standard welding practice, methods and procedures should be observed. (See welding notes).
SKIPPER Electronics AS DB-100-SB Operation and Installation Manual

Page 12 of 23 Date: 2020-03-25
Sea Valve Assembly (Orientation not necessary).
• Place a 1.5 mm Klingersil gasket, Item (23) on top of intermediate ange Item (11).
• Then place the valve element on top of the intermediate ange. (The main valve element is ball valve for
DB-100-SB and gate valve for DB-100-SA)The 16 mm nuts and washers should be mounted and tight-
ened. (Align parts before tighten nuts).
• Place a 1.5 mm Klingersil gasket Item (23) on top of the valve element.
• Mount the intermediate element, Item (12) on top of the valve element.
• All 8 screws, nuts and washers should be mounted, and tightened. (Align parts before tighten nuts).
6. Sea Valve Assembly
SKIPPER Electronics AS DB-100-SB Operation and Installation Manual

Page 13 of 23 Date: 2020-03-25
7. Assembling of rst extension tube and sensor
Sensor type with 11mm cable diameter:
• Echo sounders:
• ETN050G, ETN050XG,
ETN200SG, ETN200SXG
• Speed logs:
• DL2SG-SA, DL21SG-SA,
DL850S27G-SB, EML224SDB-SD,
DL1SDB-SA
2
1
5
4
?
3
Assembled view
POS.
PART NR.
DESCRIPTION
QTY.
1
ETS50200-SA
Transducer 50/200kHz in 100mm housing w/25m cable
1
2
DB-2039
Nut M28 Brass
1
3
DB-2026
Extension Tube 0,5m SB-100
1
4
DB-2020
Gasket Ø25,9x15 ø8
2
5
DB-2019
Washer Brass Ø25,9 ø9 x2,5mm
4
C
2
3
1
4
B
A
D
E
F
Approved by - date
ST 2018.05.11
Designed by - date
1 of 2
50200kHz Transducer for 100mm
Sea Valve w/25m cable
Scale
ETS50200G-SA
Revision
00
Sheet
Edition date
GT 2018.05.11
Name
Drwg. no.
CN
All sharp edges to be
broke or deburred
2018.05.11
Material
N/A
Eur. projection
Gen. tolerance
ISO2768m
Electronics AS
Sensor type with 7mm cable diameter:
• Echo sounders:
• ETS50200G-SA, ETS50200XG-SA.
Gaskets and washers inside the extension tubes are dierent depending on the cable thickness.
Gaskets and washers for one extension tube are supplied as part of Speed log sensors/Echo sounder trans-
ducers.
The Sea valve mounting kit for double bottom will include kits with 6 x gaskets and 12 x washers for 11mm
cable and 7mm cable.
SKIPPER Electronics AS DB-100-SB Operation and Installation Manual

Page 14 of 23 Date: 2020-03-25
• Place the O-ring, Item (36) in the groove on top of the
intermediate element. Apply grease to the O-ring.
• Insert the 2 thread bolts Item (16) through the ange
and secure with 2 x M16 counternuts, Item (28).
Torque 130 Nm.
• Lower the sensor housing carefully down to the top of
the valve piston.
8. Sensor installation
SKIPPER Electronics AS DB-100-SB Operation and Installation Manual

Page 15 of 23 Date: 2020-03-25
Mount top ange Item (13). Secure with 8 each washers and nuts. Torque: 130 Nm.
Mount in following order:
• 2 x gasket, Item (17).
• Washer, Item (22).
• Nut M50, Item (18).
• 2 x M16 nuts, Item (28).
• Clamp unit, Item (15).
• 2 x M16 nuts, Item (28) with spring washer, Item (29).
9. Clamp Unit mounting
SKIPPER Electronics AS DB-100-SB Operation and Installation Manual

Page 16 of 23 Date: 2020-03-25
• The extension tubes and coupling must
be mounted with a torque between 15
and 30 Nm.
• The countersunk head screw must be
mounted with a torque 1.5 Nm.
10. Extension tube mounting order
SKIPPER Electronics AS DB-100-SB Operation and Installation Manual

Page 17 of 23 Date: 2020-03-25
• Open Sea Valve, lower sensor unit and
rst Extension Tube.
• Rotate the Extension Tube to align the
sensor to point forward (ahead), (only
needed for Speed Log).
• Use the attened area on the Extension
Tube to nd correct direction. (See g. 11
Final Assembly.
• Tighten up the 2 x screw M8 before
mounting next Extension Tube.
SKIPPER Electronics AS DB-100-SB Operation and Installation Manual

Page 18 of 23 Date: 2020-03-25
Check that the transducer/sensor housing, when fully inserted, is ush with the lower surface of the bottom
ange.
• After the ship is aoat, is it necessary to let the air out of the Sea Valve.
• Loosen the M50 nut, let the air out and tighten nut again.
Protect sensor!
• When launching ship, lift sensor 50 mm.
• When dry docking ship, lift sensor 50 mm.
Forward (Ahead)
11. Final assembly
SKIPPER Electronics AS DB-100-SB Operation and Installation Manual

Page 19 of 23 Date: 2020-03-25
12. Sensor removal
SKIPPER Electronics AS DB-100-SB Operation and Installation Manual

Page 20 of 23 Date: 2020-03-25
Forward (Ahead)
13. Re-installation
SKIPPER Electronics AS DB-100-SB Operation and Installation Manual
This manual suits for next models
1
Table of contents
Other Skipper Control Unit manuals
Popular Control Unit manuals by other brands

Toa
Toa AT-4060 AS installation manual

Infineon
Infineon GPT12 Timer Concatenation 1 Training

Allen-Bradley
Allen-Bradley SLC 500 BASIC installation instructions

INOXPA
INOXPA OVERFLOW VALVE Installation, service and maintenance instructions

David Clark
David Clark U3816 Installation & operating instructions

Clack
Clack Water Specialist WS1TC Operation and instruction manual