Skipper SB-100-SA User manual

SKIPPER Electronics AS
Enebakkveien 150
P. O. Box 151, Manglerud
0612 Oslo, Norway
www.skipper.no
Telephone: +47 23 30 22 70
E-mail: support@skipper.no Document no: DM-BSB100 Rev 2012
Edition: 12.08.2020
100mm
Single bottom sea valve
Installation and operation Manual
SB-100-SA
SB-100-SB

Page2 of 22 Date: 12.08.2020
SKIPPER Electronics AS SB-100-XX Operation and Installation Manual
Weitergabe sowie vervielfältigung dieser unterlage, verwertung
und mitteilung ihres inhaltes nicht gestattet, soweit nicht
ausdrücklich zugestanden. Zuwiderhandlungen verpichten zu
schadenersatz.
Toute communication ou reproduction de ce document,
toute exploitation ou communication de ou son contenu sont
interdites, sauf autorisation expresse. Tout manquement à
cette règle est illicite et expose son auteur au versement de
dommeges et intèrèts.
Copying of this document, and giving it to others and the use
or communication of contents thereof, are forbidden without
express authority. Oenders are liable to the payment of
damages.
Sin nuestra expresa autorización, queda terminantemente
prohibida la reproducción total o parcial de este documento,
asì como su uso indebido y/o su exhibición o comunicación
a terceros. De los infractores Se exigirá el correspondiente
resarcimiento de daños y perjuicios.

Page3 of 22
Date: 12.08.2020
Contents
1. INTRODUCTION........................................................................................................................4
2. SPACE CONSIDERATIONS.....................................................................................................6
Space consideration SB-100-SA...................................................................... 6
Space consideration SB-100-SB ...................................................................... 7
3. WELDING THE BOTTOM FLANGE.....................................................................................8
4. SEA VALVE ASSEMBLY. ..........................................................................................................9
Assembly SB-100-SA...................................................................................... 9
Assembly SB-100-SB .................................................................................... 10
5. ASSEMBLING OF EXTENSION TUBE AND SENSOR ...................................................11
6. SENSOR INSTALLATION......................................................................................................12
7. CLAMP UNIT MOUNTING....................................................................................................13
8. LOWER THE SENSOR............................................................................................................14
Lowering sensor in SB-100-SB ..................................................................... 14
Lowering sensor in SB-100-SA ..................................................................... 14
9. SENSOR FORWARD ORIENTATION .................................................................................15
10. FINAL ASSEMBLY .................................................................................................................16
11. SENSOR REMOVAL...............................................................................................................17
12. RE-INSTALLATION...............................................................................................................18
13. ILLUSTRATED PARTS LIST. SHIPMENT ......................................................................19
12. ILLUSTRATED PARTS LIST. ASSAMBLED...................................................................20
Part list SB-100-SA........................................................................................ 20
Part list SB-100-SB........................................................................................ 21
13. MAINTENANCE .....................................................................................................................22
Maintenance Tasks for inactive sensors......................................................... 22
Dry docking in temperatures below freezing point........................................ 22
SKIPPER Electronics AS
SB-100-XX Operation and Installation Manual

Page4 of 22 Date: 12.08.2020
SKIPPER SB (Single Bottom) Sea Valve 100 mm
The SKIPPER SB Sea Valve 100 mm is used for installation of: SKIPPER speed log sensors and echo
sounder transducers tted with adaptors for XB-100-XX
1. Echo Sounder transducer type (50, 200 and 50/200 kHz).
2. Speed log sensors: DL2, DL21, DL1, DL850(270kHz), EML224.
Caution!
Be aware that the Sea Valve contains high precision parts and therefore proper
handling when mounting is essential for the nal result.
When handling the Sea Valve, all lifting devices must be attached on the outside of the
valve. It is very important to not insert any chains, wire, rope or any other device into
the valve chamber. This to avoid damaging and any kind of pollution of the Sea Valve.
The SKIPPER SB Sea Valve 100 mm is delivered partly assembled for transport. The parts necessary for
nal assembly will be found packed in a box delivered with the Sea Valve. First of all, it must be decided
where the Sea Valve should be installed. Normally, this will be in the fore part of the ship, in the centerline,
or as close to the centerline as possible. Optimal system operation is achieved by tting the transducer/
sensor as deep as possible on the hull.
• The active surface of the sensor must be installed with front face a maximum of +/-1 degree to the ships
horizontal plane. (2 axis Speed Logs).
• The active surface of the transducer must be installed with front face a maximum of +/-7 degree to the
ships horizontal plane. (Echo Sounder).
Do not mount transducers close to the bow thruster propeller outlets, or aft of other hull installations (outlets,
vents or other protruding details) who may create aeration or turbulence.
It is necessary to select a part of the hull that is submerged and free from turbulence and aeration under all
load and speed conditions, and to avoid positions where air is trapped in heavy weather.
If a at, horizontal section is not available for transducer tting, the shipyard must construct a suitable bed.
Welding seams in this area should be smoothed and rounded o, in order not to create turbulence or aeration
at speed.
Protect the active element of the transducer/sensors during transport and installation, and
do not paint the surface.
The Sea Valve should be placed in a service accessible place, large enough for installation and disassembly
of the sensor unit. See drawing: “Space considerations”.
1. INTRODUCTION
SKIPPER Electronics AS SB-100-XX Operation and Installation Manual

Page5 of 22
Date: 12.08.2020
Important
”Sensors for Speed Log and Echo Sounder are delivered with a xed cable. Attention must be taken
to allow easy replacement/pulling of new cable during maintenance”.
SKIPPER Electronics AS will recommend installation positions if GA-drawings (General
arrangements), lines drawings and frame drawings are made available for study.
Condition.
The welding to hull structures and structural support of the items may be subject to separate approval by
classication societies for each installation on board a ship.
Note: All “Item numbers” references on the following pages, can be found on drawing “Illustrated parts list.
Assembled” (unless specied).
SKIPPER Electronics AS
SB-100-XX Operation and Installation Manual

Page6 of 22 Date: 12.08.2020
2. SPACE CONSIDERATIONS
The Sea Valve should be placed in a service accessible place, large enough for installation and disassembly
of the sensor unit.
Space consideration SB-100-SA
SKIPPER Electronics AS SB-100-XX Operation and Installation Manual

Page7 of 22
Date: 12.08.2020
Space consideration SB-100-SB
SKIPPER Electronics AS
SB-100-XX Operation and Installation Manual

Page8 of 22 Date: 12.08.2020
Welding the Bottom Flange in Ship`s Hull
8
3. WELDING THE BOTTOM FLANGE
• When the position has been decided, a hole for the 220 mm bottom ange is cut in the hull.
• The bottom ange, Item (1), is welded into the hull. Standard welding practice, methods and procedures
should be observed, but may vary. (See welding notes).
Attention:
The bottom ange is a part of the Sea Valve that is machined with high accuracy and it should be
protected after mounting to avoid damage to the bottom ange surfaces. This to avoid leakage. If the
valve is pre-mounted, be sure to protect the valve from being polluted by welding debris.
WELDING NOTES!
All bottom parts and anges for welding are precisely machined parts. During welding of these parts
to the ship’s hull plates, careful attention must be paid to avoid construction strain on the bottom
parts and anges.
• Let parts cool down during welding.
• Over heating may change t and form and result in non-conformity with intended sensor/
transducer.
• Welding to thick hull steel plates will exert high stress on bottom parts and anges.
• Especially care must be taken during welding of stainless steel anges.
• Work must be performed by a qualied and certied welder.
Welding the bottom ange in ship’s hull.
SKIPPER Electronics AS SB-100-XX Operation and Installation Manual

Page9 of 22
Date: 12.08.2020
4. SEA VALVE ASSEMBLY.
• Place 1.5 mm gasket, Item (18) on top of Bottom Flange, Item (1).
• Then place the Main element, Item (6) on top of the Bottom Flange. The 16 mm nuts and washers should
be mounted and tightened. (Align parts before tighten nuts).
• Place a 1.5 mm gasket (item 18) on top of the main element, Item (6).
• Mount the intermediate element, Item (15) on top of the main element.
• All 8 screws, nuts and washers should be mounted, and tightened. (Align parts before tighten nuts).
Assembly SB-100-SA
Caution must be taken when mounting seavalves that all parts are aligned correctly, and that the inside is
clean. DO NOT use liguid sealants, and DO NOT paint the inside of a valve.
SKIPPER Electronics AS
SB-100-XX Operation and Installation Manual

Page10 of 22 Date: 12.08.2020
Step 1
• Place 1.5 mm gasket, on top of Bottom Flange.
• Then place the Ball Valve element on top of the Bottom Flange. The 16 mm nuts and washers should be
mounted, not tightened.
• Place a 1.5 mm gasket on top of the Ball Valve element.
• Mount the intermediate element on top of the Ball Valve element. The track for o-ring to be upwards.
• All 8 nuts and washers should be mounted, not tightened.
Step 2
• Place the plastic alignment tube, all the way, into the sea valve.
• Tighten 8 nuts ball valve to bottom ange.
• Tighten 8 nuts Intermediate element to ball valve.
• Remove the plastic alignment tool.
Step 1 Step 2
Intermediate element
Ball valve
Plastic alignment tube
Bottom ange
Assembly SB-100-SB
SKIPPER Electronics AS SB-100-XX Operation and Installation Manual

Page11 of 22
Date: 12.08.2020
5. ASSEMBLING OF EXTENSION TUBE AND SENSOR
Sensor type with 11mm cable diameter:
• Echo sounders:
• ETN050G, ETN050XG,
ETN200SG, ETN200SXG
• Speed logs:
• DL2SG-SA, DL21SG-SA,
DL850S27G-SB, EML224SDB-SD,
DL1SDB-SA
2
1
5
4
?
3
Assembled view
POS.
PART NR.
DESCRIPTION
QTY.
1
ETS50200-SA
Transducer 50/200kHz in 100mm housing w/25m cable
1
2
DB-2039
Nut M28 Brass
1
3
DB-2026
Extension Tube 0,5m SB-100
1
4
DB-2020
Gasket Ø25,9x15 ø8
2
5
DB-2019
Washer Brass Ø25,9 ø9 x2,5mm
4
C
2
3
1
4
B
A
D
E
F
Approved by - date
ST 2018.05.11
Designed by - date
1 of 2
50200kHz Transducer for 100mm
Sea Valve w/25m cable
Scale
ETS50200G-SA
Revision
00
Sheet
Edition date
GT 2018.05.11
Name
Drwg. no.
CN
All sharp edges to be
broke or deburred
2018.05.11
Material
N/A
Eur. projection
Gen. tolerance
ISO2768m
Electronics AS
Sensor type with 7mm cable diameter:
• Echo sounders:
• ETS50200G-SA, ETS50200XG-SA.
(Item numbers below)
NOTE: Gaskets and washers are supplied as part of Speed log sensors/Echo sounder transducers
SKIPPER Electronics AS
SB-100-XX Operation and Installation Manual

Page12 of 22 Date: 12.08.2020
6. SENSOR INSTALLATION
Sensor installation
• Place the O-ring, Item (36) in the groove on top of the intermediate element, Item (7).
• Apply grease to the O-ring.
• Insert the 2 thread bolts, Item (11) through the ange and secure with 2 x M16 counter nuts, Item (28).
• Torque 130 Nm.
• Lower the sensor housing carefully down to the top of the valve piston.
SKIPPER Electronics AS SB-100-XX Operation and Installation Manual

Page13 of 22
Date: 12.08.2020
7. CLAMP UNIT MOUNTING
Clamp Unit mounting
Mount Top Flange, Item (8). Secure with 8 washers, Item (29) and nuts, Item (28). Torque: 130 Nm.
Mount in following order:
• 2 x gasket, Item (12).
• Washer, Item (17).
• Nut M50, Item (13).
• 2 x M16 nuts, Item (28 ).
• Clamp Unit, Item (10).
• 2 x M16 nuts, Item (28) with spring washer, Item (29).
SKIPPER Electronics AS
SB-100-XX Operation and Installation Manual

Page14 of 22 Date: 12.08.2020
8. LOWER THE SENSOR
• To ensure sensor is properly inserted completly into the bottom ange make a distance mark to indicate
when the sensor is at bottom.
• SB-100-SB/SB-100-LB distance from top of ball to bottom: 234mm
• SB-100-SA/SB-100-LA distance from top of gate to bottom: 180mm
• Before opening the sea valve. Lift up the sensor some cm to avoid scratches when valve opens.
• Open Sea Valve, lower sensor unit and Extension Tube.
180mm
Lowering sensor in SB-100-SA
Lowering sensor in SB-100-SB
SKIPPER Electronics AS SB-100-XX Operation and Installation Manual

Page15 of 22
Date: 12.08.2020
• Sensor forward orientation only required for Speed Logs. Echo sounder transducers requires no forward
orientation.
• Rotate the Extension Tube to align the sensor to point forward (ahead),. Use the attened area on the
Extension Tube to nd correct direction.
9. SENSOR FORWARD ORIENTATION
SKIPPER Electronics AS
SB-100-XX Operation and Installation Manual

Page16 of 22 Date: 12.08.2020
Check that the transducer sensor housing, when fully inserted, is ush with the lower surface of the
bottom ange.
Protect sensor!
• When launching ship, lift sensor 50 mm.
• When dry docking ship, lift sensor 50 mm.
10. FINAL ASSEMBLY
• Tighten nut M50
• Push down clamp unit on to the nut M50
• Tighten the 2 screws M8 on the clamp unit
• Tighten the nuts M16
Forward (Ahead)
SKIPPER Electronics AS SB-100-XX Operation and Installation Manual

Page17 of 22
Date: 12.08.2020
11. SENSOR REMOVAL
SKIPPER Electronics AS
SB-100-XX Operation and Installation Manual

Page18 of 22 Date: 12.08.2020
12. RE-INSTALLATION
Reinstallation
Same procedure as first-time mounting.
1. Tighten the Nut M50, Item (13), Torque : 98 Nm.
2. Push down the Clamp Unit, Item (10) onto the Nut M50.
and tighten the 2 screws M8 (with lock washer).Torque : 40Nm
3. Screw the 2 Nuts M16 sligtly up to the Clamp Unit.
4. Tighten the 2 Nuts M16 (with lock washer) on
1
2
3
4
Mounting order Nut M50 and Clamp Unit :
the opposite side: Torque : 130 Nm
The Clamp Unit must be fitted on Top of Nut M50
to lock the Nut.
(This is done to give extra security.)
Extension TubeCentre Line
Guide Bar Ship
Forward (Ahead)
SKIPPER Electronics AS SB-100-XX Operation and Installation Manual

Page19 of 22
Date: 12.08.2020
13. ILLUSTRATED PARTS LIST. SHIPMENT
2
3
11
4
6
7
10
1
8
9
5
11
6
7
7
6
POS.
PART NUMBER
DESCRIPTION
QTY.
1 SB-2019
Bottom flange for SB-100-XX
1
2
DB-2036
Nut M50 Brass for XB-60/100/200-XX
1
3
DB-2035
Top Flange for XB-100/200-XX
2
4
DB-2031
Top Flange for XB-100/200-XX
1
5
DB-2040
Washer Ø46x2,5 Ø32,5
1
6
ZOA-01035
Spring washer M16 DIN 127B A4
12
7
ZOA-01036
Hexagon Nut ISO 4034 - M16 - N
12
8
ZCC-01011
Main element DN100 PN16
1
9
ZZA-01127
Metalised polyester laser label
1
10
DB-2051
Intermediate element
1
11
ZOA-01075
Screw M16x55 DIN933 A4-80
8
E
F
C
1
2
3
4
B
A
3
2
1
5
C
D
4
6
7
8
A
B
D
E
ISO2768m
1 : 5
Gen. tolerance
Eur. projection
N/A
Material
2020.02.26
Checked by
Rev.01 Changed Intermediate element
from SB-3021 to DB-2051 and updated
parts list. ST 2020.02.26
CN
Drwg. no.
Name
GT 2020.02.26
Edition date
Sheet
01
Revision
SB-100-PA
Scale
Sea Valve 100mm, Single bottom,Partly assembled
1 of 1
Designed by - date
ST 2020.02.26
Approved by - date
Electronics AS
2
2
2
7
DB-2054
Clamp Unit for XB-
60/100/200-XX, Brass
1x
4
DB-2038
Gasket Ø25,9/12x15mm
for XB-60/100/200-XX
2x
5
DB-2037
Washer M25,9x2,5 Ø13
for XB-60/100/200-XX
4x
3
DB-2039
Nut M28 Brass for
XB-60/100/200-XX
1x
7
ZOA-01083
Screw M8x30 mm
DIN933 A4
2x
7
ZOA-01070
Split washer M8
DIN127 A4
2x
8
DB-2026
Extention Tube 0,5m
DB-100/DB-60
1x
11
ZOA-01069
Screw M4x8 mm
DIN7991 A4
1x
1
DB-2042
Gasket
Ø162/115x1,5mm for
SB/DB-100-XX
2x
2
ZOA-01024
Nitril O-Ring
Ø3,53X139,30mm
1x
6
DB-2034
Safety Bolt, M16 X 250
for XB-100/200-XX
2x
9
ZOA-01036
Nut M16 DIN934 A4
18x
10
ZOA-01035
Spring washer M16
DIN127B A4
14x
12
ZOA-01075
Screw M16x55 mm
DIN933 A4-80
6x
E
F
C
1
2
3
4
B
A
3
2
1
5
C
D
4
6
7
8
A
B
D
E
ISO2768m
1:2
Gen. tolerance
Eur. projection
Material
2020.02.25
Checked by
12-021/022 New drw.
2012.09.07 HK
CN
Drwg. no.
Name
Edition date
Sheet
02
Revision
SB-100-SB-M-KIT
Scale
Mounting Kit for SB-100-XX
1 of 1
Designed by - date
HK 2012.09.10
Approved by - date
Electronics AS
Made new edition to include -XA
version too. Made folder under /09
ST 2020.02.25
SKIPPER Electronics AS
SB-100-XX Operation and Installation Manual

Page20 of 22 Date: 12.08.2020
12. ILLUSTRATED PARTS LIST. ASSAMBLED
Part list SB-100-SA
SKIPPER Electronics AS SB-100-XX Operation and Installation Manual
This manual suits for next models
1
Table of contents
Other Skipper Control Unit manuals
Popular Control Unit manuals by other brands

Renishaw
Renishaw OMM manual

Burkert
Burkert 6213 operating instructions

Hara Systems
Hara Systems OSTSen-9250 user guide

Ravel
Ravel RE-717MC Installation and maintenance instructions

System Sensor
System Sensor M500SA Installation and maintenance instructions

CALEFFI
CALEFFI LEGIOMIX 6000 series Programming manual