SportsPlay 902-958 User manual

SEPTEMBER 21, 2010
1
902-958 DUAL LEG PRESS STATION
INSTALLATION INSTRUCTION
INSTALLATION DETAILS
!Recommended crew (Adult): 2
!Installation time: 2 hours (plus time for concrete to
cure)
!User age: 13 and up
Weight: 271 lbs
MAINTENANCE:
!As the owner of the equipment you are responsible for
maintenance of the equipment and the surrounding area.
A maintenance schedule must be developed and the
equipment inspected frequently. A maintenance sheet is
included at the end of the installation instructions
WARNING- THIS EQUIPMENT IS
DESIGNED FOR ADULTS ONLY.
ONLY HEALTHY PEOPLE AGES 13
AND UP SHOULD USE THE
EQUIPMENT.

SEPTEMBER 21, 2010
2
902-958 DUAL LEG PRESS STATION
INSTALLATION INSTRUCTION
PARTS LIST
ID
DESCRIPTION
QTY
1
Dual Leg Press
1
2
Footing Frame
1
3
Mounting Cover (2 pieces)
1
4
!” Hex Nuts
4
3/8” x 2” Button Head Bolt
2
3/8” Flat Washer
2
7/32” Allen
1
NOTE: Keep a copy of these instructions on file to assist you
with maintenance and replacement parts

SEPTEMBER 21, 2010
3
902-958 DUAL LEG PRESS STATION
INSTALLATION INSTRUCTION
FOOTING INFORMATION
!You must place the bottom of the footing frame on a
suitable flat blocking material to prevent it from sinking
further into the soil. We recommend you use a brick, block
of wood or gravel. The footing depth of 2’ includes 6” of
blocking material (refer to image at right and images on the
next page as a reference).
!It is the owner/installers responsibility to check local
building codes and to comply with those codes. All footing
depths listed here are recommendations and local soil types
and frost lines may require a deeper and/or wider footing
depth. If that’s the case you must add more blocking
material to accommodate the deeper footing, as the footing
frame will still only be installed at the depth listed in this
instruction manual.
!The top of the plate on the top of the footing frame needs to
be installed flush with the top of the concrete surface.

SEPTEMBER 21, 2010
4
902-958 DUAL LEG PRESS STATION
INSTALLATION INSTRUCTION
SPECIFICATIONS
!Mounting cover – 3/8” walled rotationally molded LLDPE
!Paint – Electrostatically applied & oven cured powdercoat
!Hardware – Stainless steel & tamper resistant
!Tube – Cataphoresis coated tube of varying OD.
WARNING
!THIS EQUIPMENT IS DESIGNED FOR
HEALTHY PEOPLE AGE 13 AND UP
INSTALLATION TIPS & TROUBLE SHOOTING
!Installation of the equipment is easy since the equipment
itself is already assembled.
!Always call local utilities before digging
!Do not place equipment in an area where people walking
past could be injured while the equipment is in use
!Install multiple pieces at a safe distance from other
equipment – A good rule of thumb is maintaining a
minimum of 8’ between each unit.

SEPTEMBER 21, 2010
5
902-958 DUAL LEG PRESS STATION
INSTALLATION INSTRUCTION
INSTALLATION STEPS
!Once the footing has been dug place the frame in the hole.
Level the top plate of the frame and poor concrete. Make
sure the top of the top plate is flush with the surface of the
concrete.
!After the concrete has cured, install the equipment onto the
footing frame by sliding the equipment into position and
attaching with the !” nuts provided. (Refer to the image on
page 3)
!Next, install the mounting cover using the 3/8” x 2” bolts
and 3/8” washers. (Refer to the image on the right side of
this page)
!Inspect the equipment to make sure all parts are secure and
operating properly.

SEPTEMBER 21, 2010
6
902-958 DUAL LEG PRESS STATION
INSTALLATION INSTRUCTION
Welds
!Inspect all welds for cracks. If a
crack is found block access to the
playground and contact your
distributor for replacement parts
immediately.
Hardware
!Inspect for loose or missing
hardware. Tighten all loose
hardware and replace all missing
hardware. Block off access to
equipment if necessary.
Plastic Components
!Inspect for any sharp edges or
deformities. Minor deformities
and sharp edges can be repaired
using a utility knife. Block off
access until repairs are made.
Contact distributor for
replacement parts.
Finish
!Inspect all metal components for
coating damage. If powder coating
needs to be repaired sand surface
and mask off area. Coat with
primer and once the primer has
dried paint with color matching
touch up paint. Contact distributor
of color matching paint. Contact
Distributor for Thermoplastic
repair kit.
Footings
!Inspect all footings to ensure
equipment is secure. You must block
access to prevent access until repair is
made.
Replacement Parts
!Reference the parts list on page 2 of
the instruction set for this component
to identify the part/s correctly.
!Contact your distributor to order parts.
MAINTENANCE
!THIS DOCUMENT WILL ACT AS
YOUR ORIGINAL DOCUMENT
AND COPIES SHALL BE MADE
FOR USE DURING THE ACTUAL
INSPECTIONS
!MAINTAIN A FILE WITH COPIES
OF ALL INSPECTIONS AND
MAINTENANCE RECORDS
ALONG WITH THE
INSTRUCTIONS

SEPTEMBER 21, 2010
7
902-958 DUAL LEG PRESS STATION
INSTALLATION INSTRUCTION
INSPECTION FORM
!MAKE COPIES OF THIS FORM TO USE FOR INSPECTION
!DOCUMENT ALL MAINTENANCE ACTIONS ON THE LIST AS WELL AS ANY NOT LISTED.
!INCLUDE DATES AND SIGNATURES
Inspection Checklist
Recommended
Frequency
Grade
(Pass/Fail/NA)
Date
Inspected
Date Repairs
Completed
Inspect Hardware
Weekly
Inspect Plastic Components
Weekly
Inspect Finish
Monthly
Inspect Footing
Yearly
Inspector: _______________________ Signature: ___________________________________ Date: ___________________________
Maintenance Record
Part
Problem
Corrective Action
Date
Table of contents